Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name “Rohan Avenue” - EC Application for proposed residential cum commercial building Company/Organisation Name ROHAN M MONTEIRO
Registered Address Main Road, Capitanio School Road, Pumpwell, Mangalore, Karnataka Karnataka 575002 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Rohan M Monteiro
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address Main Road, Capitanio School road, Pumpwell, Mangalore, Karnataka,,Mangalore,Dakshina Kannada,Karnataka-575002
(d)Pin code 575002
(e)E-mail rohanavenue1@gmail.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/KA/MIS/209000/2021
(e)Master Proposal Number(Single Window) SW/208999/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDakshina KannadaMangaloreIddya
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Mangalore, Karnataka
Town / Village
(Name of more than one town may be entered by separating with)
Iddya Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Sy. No. 61/26B3, 61/26B4, 61/26B5, 61/26B6, 61/26B7, 61/27C, 61/27D, 61/27E, 61/27F, 61/17P1(1), 61/17P1(2), 61/17P1(3), 61/17P1(4), 61/17P1(5), 61/17
State Karnataka District Dakshina Kannada
Tehshil Mangalore Pincode 575002
Nearest railway station Surathkal Railway Station Distance from the project site 0.6
Nearest airport Bajpe International Airport, Mangalore Distance from the project site 10
Nearest Town/City/District Headquarters Within the limits of Mangalore City Corporation Distance from the project site 12
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Mangalore City Municipal Corporation M. G. Road, Lal Bhag, Mangalore - 575 003. Contact No. : 0824 - 2220313 – 318 Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 32433.77 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) No
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The project site is a vacant land converted for mix use, residential cum commercial. The land is open land with sparse ground vegetation. Land ownership document is enclosed as Annex VI.
1.2 Clearance of existing land, vegetation and buildings? No There are no trees or buildings at the site.
1.3 Creation of new land uses? No Landuse is already converted for mixed development
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigation has been carried out and enclosed as Annex XX.
1.5 Construction works? Yes A single tower of Residential com Commercial Complex in Basement + Ground + 17 upper floors + Terrace floor and civic amenities.
1.6 Demolition works? No There are no buildings at the site at present
1.7 Temporary sites used for construction works or housing of construction workers? Yes Labour colony will be provided for accommodation of 50-75 labors.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Single building with construction of Basement, Ground + 17 Upper Floors + Terrace Floor. Earthwork will be involved in the project for construction of basement. The major portion of the excavated earth will be used for refilling and site leveling.
1.9 Underground works including mining or tunneling? Yes Excavation work will be carried out for the construction of single basement for parking.
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? No Not applicable
1.14 Facilities for storage of goods or materials? Yes Temporary sheds will be set up at the project site for storage of construction materials.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: Construction waste will be segregated and reused at the project site to the extent possible. The sewage generating from the temporary toilets at the project site will be connected to UGD. Solid waste will be segregated and disposed. Operation Phase: 1. Solid waste: The solid waste generated will be segregated into bio degradable, non-biodegradable and inert waste. The biodegradable waste will be composted in the Organic Waste Converter at the proposed Project site. N
1.16 Facilities for long term housing of operational workers? No Not applicable
1.17 New road, rail or sea traffic during construction or operation? Yes There will be an increase in vehicular traffic in the existing road in front of the site during peak hours.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not applicable
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes During Construction Phase: Approx. 70 - 80 KLD of fresh water will be required during construction phase to be sourced from the existing well at the site. During Operational Phase: Approx. 123 KLD fresh water will be required during operation phase to be sourced from Mangalore City Corporation.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction materials will be mostly obtained from the local market. Labour colony of approx. 50-75 labors will be set up at the site during construction. During operation phase, approx. 70 people will be employed for maintenance. Residents or commuters during the operation phase will use self-owned/ public transportation facilities.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction Phase: There will be an influx of approx. 50-75 labours during peak construction period Operation Phase: Permanent influx of approximately 1248 people who would reside in the proposed residential buildings.
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Assigned landuse is residential.
2.2 Water (expected source & competing users) unit: KLD Yes Operation phase: Approx. 123 KLD of freshwater from Mangalore City Corporation. Refer Annex IV for Water Balance of the project.
2.3 Minerals (MT) No The proposal pertains to the construction activity only. Other than sand, no other minerals will be used.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction materials will be procured from local dealers. Approx. quantity of the construction material will be as follows Cement approx.: 129200 bags Steel approx. : 1300 T Sand approx. : 11700 cum Masonry approx.: 2560000 Nos. Jelly (20mm) : 7750 cum Jelly (40mm) : 200 cum
2.5 Forests and timber (source – MT) No Minimum timber will be used in the project including shuttering work during construction.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes During Construction Phase: Approx. 75 KW power will be required to be sourced from MESCOM. 1 DG set of 125 kVA as back up During Operation Phase: Approx. 750 kW will be required during operation phase to be sourced from MESCOM. 3 DG set of 400 kVA, 300 kVA and 200 KVA will be provided for power back up.
2.7 Any other natural resources (use appropriate standard units) Yes Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Not applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes During Construction Phase: Less than 50 kg per day of solid waste is expected from the labour colony. The biodegradable waste will be composted at the site and rest will be sent to sanitary landfill. During Operation Phase Considering solid waste generation of 0.4 kg/day capita, approx. total 654 kg/day solid waste is expected from the project, of which, approx. 592 kg/day will be from apartment, 100 kg/day will be other waste including landscape waste and 4 kg/day will be STP sludge, respe
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Sump oil from the standby DG to be sold to Authorized Recyclers
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes During Construction phase total sewage sludge generated from the proposed activity will be about 2.1 kg per day which will be used as manure at the Project site.
4.7 Construction or demolition wastes Yes Waste concrete material will be used as sub base for internal roads and margins. Metal scraps, plastics, package material etc. will be sold to recyclers.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Horticulture waste will be composted along with other biodegradable wastes and will be used as manure.
4.11 Other solid wastes No Not applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be minor vehicular pollution during operation phase. Negligible emissions from DG set in case of power failure and from vehicles of the occupants.
5.2 Emissions from production processes No Not applicable
5.3 Emissions from materials handling including storage or transport Yes There will be dust generation due to construction activities, handling of construction material and movement of construction vehicles. Hence, there will be a slight increase in particulate matter levels during construction phase.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions during unloading of construction material and concrete mixers. Negligible emission from DG sets are also expected.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes During the construction phase, dust will be generated due to handling of construction material and movement of construction vehicles
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction phase: Noise will be generated from following sources during construction phase: 1. Construction machinery 2. Proposed construction activity The impacts resulting from these will be mitigated by providing equipment like ear plugs, ear muffs for workers. Operation phase: Noise will be generated from vehicular movement of residents.
6.2 From industrial or similar processes No Not applicable
6.3 From construction or demolition Yes Noise generated from the construction activity as and from equipment used like concrete mixers, trucks, tower cranes, etc.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Construction phase: Noise generated due to truck carrying the construction raw material/ debris and construction activities. Operational Phase: Since it is a building construction project, noise is expected only from the traffic
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not applicable
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Approx. 157 KLD of sewage would be generated which will be treated with 200 KLD STP to meet the discharge standards of KSPCB. The treated wastewater will be reused for flushing & horticulture.
7.3 By deposition of pollutants emitted to air into the land or into water No Dust particles generated during construction will be settled continuously by spraying water. No pollutant emission except for DG emissions in case of power failure is envisaged which is insignificant.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Project is in Earthquake Zone III. The design of the building is as per the IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings). Structural Stability Certificate is enclosed as Annex VIII
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Not applicable
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments No Not applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes 1. Gurupura River Approx. 8.0 km* South direction 2. Surathkal beach Approx. 0.8 km* West direction 3. Nandini River Approx. 3.8 Km North direction (*aerial distances)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters Yes Arabian Sea Approx. 0.8 km on the West direction
5 State, National boundaries Yes NH – 66 Kanyakumari Panvel Highway Site is located on Kanyakumari Panvel Highway
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations Yes Indian Coast Guard, Panambur - Approx. 6 km South
8 Densely populated or built-up area Yes Mangalore City The site is densely populated located within Mangalore City Corporation.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Many - The Project site is within Mangalore City Corporation limits where high quality educational and community facilities are available.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Project is in Seismic Zone III. The building will be designed as per IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings).
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRohan M Monteiro
DesignationProprietor
Name of Company (Applicant Name should not be given here)ROHAN M MONTEIRO
AddressMain Road, Capitanio School Road, Pumpwell, Mangalore, Karnataka