Form-1 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. Basic Informations | Project Name | ‘ALTURA’ – Residential Project with Neighborhood Shops | Company/Organisation Name | LAND TRADES BUILDERS & DEVELOPERS | Registered Address | Milestone 25, 5th Floor, Shop No. 514, Door No. 15-5-223/140, 141, Collectors Gate Junction, Mangalore Karnataka 575002 | Legal Status of the Company | Private |
| 2. | Address for the correspondence: | (a)Name of the Applicant | Shrinath Hebbar | (b)Designation (Owner/ Partner/ CEO) | Proprietor | (c)Address | Milestone 25, 5th floor, Shop no. 514, Door No. 15-5-223/140, 141, Collectors Gate Junction, Mangalore - 575002,,Mangalore,Dakshina Kannada,Karnataka-575002 | (d)Pin code | 575002 | (e)E-mail | altura2020ec@gmail.com | (f)Telephone No. | 0- | (g)Fax No. | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 8(a) Building and Construction projects
| (b)Minor Project/Activity | 8(a) Building and Construction projects
| (c)Category | B2 | (d)Proposal Number | SIA/KA/MIS/185586/2020 | (e)Master Proposal Number(Single Window) | SW/185585/2020 | (f)EAC concerned (for category A Projects only) | INFRA-2 | (g)Project Type(New/Expansion/Modernization) | Fresh EC |
|
| 4. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
| Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Dakshina Kannada | Mangalore | Kadri | | 5. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (c)Reason | -1 | (d)Supporting Document | NILL | |
| Location of the project | Kadri Village, Mangalore Taluk & Dakshina Kannada District Karnataka | | | Town / Village (Name of more than one town may be entered by separating with) | Kadri | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Sy. No. 742/15BP, 742/14BP, 742/16P1, 742/16P2, 741/2, 741/3, 741/4B1P, 126/6P1, 126/6P2, 126/6P3, 126/5P1, 126/5P2, 126/5P3, 126/5P4, 126/5P5 | State | Karnataka | District | Dakshina Kannada | Tehshil | Mangalore | Pincode | 575002 | Nearest railway station | Mangalore Central Railway Station | Distance from the project site | 1.75 | Nearest airport | Bajpe International Airport | Distance from the project site | 9.5 | Nearest Town/City/District Headquarters | Mangalore | Distance from the project site | 0 | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Mangalore City Municipal Corporation | Upload GPS file | Copy of Kml File Uploaded GPS file | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | Brief summary of project | Uploaded Brief summary of project | | | Does your project location falls under out of any following areas | None of above Areas | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 31819.32 | Existing Built Up Area(In Meter /Sqr) | 0 | Does it attract any of the general conditions given below? | No | | | Does it attract the specific condition given below? | No | | | Interlinked Projects | No | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | Forest land involved(hectares) | No | | | Is there any litigation pending against the project? | No | | |
1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | No change in landsuse. The previous land use was residential. The intensity of landuse will increase. The construction is a joint development proposed by the individual land owners as mentioned in the Joint Development Deed (Annex VI). It is proposed to construct a single building with few neighborhood shops at ground floor (approx.. 200 sqm) and 32 floor of residential building having other civic amenities and sufficient parking facilities. Land documents are enclosed as Annex VII. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | About 5 trees existing at the site will be retained. Three small single stored houses will be demolished. | 1.3 | Creation of new land uses? | Yes | Construction work in single tower of B + G + 32 UF for mixed landuse in existing residential area. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil testing for foundation design of civil structures was carried out. Refer Annex IX Geotechnical Investigation Report. | 1.5 | Construction works? | Yes | General civil construction, inter alia, comprising construction of a multistoried building with associate services. | 1.6 | Demolition works? | Yes | There are 3 small houses at the project site at present which will be demolished. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Approx. 100 construction workers will be engaged during peak construction. The workers will be brought to the site every morning by the contractor. No labour colony is proposed at the site. | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | The ground level of the proposed site is lower than the main road level at certain locations. No large scale cut and fill activity is envisaged at the site due to this. | 1.9 | Underground works including mining or tunneling? | No | Not Applicable | 1.10 | Reclamation works? | No | Not Applicable | 1.11 | Dredging? | No | Not Applicable | 1.12 | Offshore structures? | No | Not Applicable | 1.13 | Production and manufacturing processes? | No | Not Applicable | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary sheds will be erected for the storage of construction materials during the construction stage, these will be dismantled after construction is over. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Construction Phase:
Solid waste: Construction waste will be segregated and reused on site to the extent possible. Proper facility for storage of construction wastes will be made at Project site.
Liquid waste: The sewage generating from the temporary toilets at the Project site will be taken to the UGD line. Care will be taken to ensure that the water used for construction purposes does not accumulate at the site.
Operation Phase:
Solid waste: The solid waste generated will be segregated. Bio | 1.16 | Facilities for long term housing of operational workers? | Yes | Yes | 1.17 | New road, rail or sea traffic during construction or operation? | No | Construction phase: Temporary traffic of approx. 4-5 trucks per day for haulage of construction material depending on the site activity.
Operation phase: There will be an increase in vehicular traffic during peak hours. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Not Applicable | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | 1.20 | New or diverted transmission lines or pipelines? | No | Not Applicable | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | Not Applicable | 1.22 | Stream crossings? | No | Not Applicable | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Construction phase: Approx.100 kld during peak construction period Source: 2 Existing Bore wells and MCC supply Operation phase: 58 kld of fresh water Source: Mangalore City Corporation Supply Refer Annex IV Water Balance. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There are no water bodies at the site. Land developments will be made in such that natural drainage pattern is maintained and the run off will be routed to the water harvesting structures. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Construction Phase:
? Construction materials will be transported to the site by the means of trucks/dumpers.
? Construction workers are brought to the site by contractor.
Operation Phase:
? Approx. 50 people will work in the shops and other building staff on daily basis and use self-driven vehicles or public transport facilities.
? Residents and visitors during the operation phase will be using self-owned transportation. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | Not Applicable | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | Not Applicable | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Construction Phase:
There will be a temporary and minor influx of construction laborers and semi-skilled manpower due to employment opportunities generated.
Operation Phase: Approximately 60 commuters working in the shops will be using the Mini mart and Approx. 600 people will be reside in building on full occupancy. | 1.29 | Introduction of alien species? | No | Not Applicable | 1.30 | Loss of native species or genetic diversity? | No | Not Applicable | 1.31 | Any other actions? | No | Not Applicable | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Residential plot with trees. The trees falling under the footprint will be cleared with prior permission from forest department. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Construction phase:
Requirement: Approx. 100 KLD during peak construction period
Source: 2 Existing Bore wells and MCC Supply
Operation phase:
Requirement: 58 KLD of fresh water + 34 KLD recycled water
Source: Mangalore City Corporation Supply (MCC)
Refer Annex IV Water Balance. Water Commitment letter from MCC is obtained is enclosed as Annex X. | 2.3 | Minerals (MT) | No | The proposal pertains to the construction activity only. No minerals other than sand will be used. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Approx. construction material requirement.
Cement approx. : 1,30,000 Bags
Steel approx. : 1,300 MT
Sand approx. : 12,000 cum
Block Masonry approx. :2,60,000 cum
Jelly (20 mm) : 10,000 mm
Jelly (40 mm) : 200 mm
Material shall be procured from local Dealers. | 2.5 | Forests and timber (source – MT) | No | Minimal use of timber for construction. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Construction phase:
Approx. 40 kVA from MESCOM
Operation Phase:
Approx. 1100 kVA from MESCOM
Back up: 1 DG set of 500 kVA + 1 DG set of 200 kVA and 1 transformer of 750 kVA with fuel requirement of (Diesel) approx. 290 l/hr. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not Applicable | |
3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Not applicable. No Hazardous substances or material will be used in any commercial and domestic activity during operation phase. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not applicable | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not applicable | 3.5 | Any other causes | No | Not applicable | |
4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Construction phase:
Construction waste would be generated which would include debris, concrete, steel and other metals, bricks, pallets, packaging and paper products, etc.
Approximately, 1-2% of debris will be generated during construction depending upon the activity.
During operation phase:
Total Solid waste: Approx. 245 kg/day, of which approx. 122 kg will be biodegradable 98 kg non-biodegradable and 24 kg inert waste, will be generated per day.
After segregation, Biodegradable was | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Sump oil from the standby DG sets to be sold to Authorized Recyclers. | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | No | Not Applicable | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Operation phase:
Total sewage sludge generated from the proposed activity will be about 2 kg/day which will be used as manure at the Project site along with the composted degradable waste. | 4.7 | Construction or demolition wastes | Yes | During construction phase, approx. 1-2% of construction material will be waste.
Concrete wastage and wasted mortar will be crushed, aggregated and mixed with other road sub-base construction material.
Waste/damaged construction material, sieved sand, broken brick bats and chipped plaster will also be used in the construction of roads and for backfill and consolidation of surfaces under podia, under margins/pitching of storm water drains, periphery curbing of roads etc. Broken tiles, wasted | 4.8 | Redundant machinery or equipment | No | Not applicable. | 4.9 | Contaminated soils or other materials | No | Not applicable. | 4.10 | Agricultural wastes | No | Horticulture waste will be composted along with other biodegradable wastes and used as manure if required or disposed as per KSPCB solid waste collection and disposal system. | 4.11 | Other solid wastes | Yes | Plastic/E-waste will be disposed off through authorized agencies. | |
5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | There will be minor vehicular pollution during construction and operation phase. Negligible emissions from DG sets in case of power failure and from vehicles of the occupants. | 5.2 | Emissions from production processes | No | Not applicable. | 5.3 | Emissions from materials handling including storage or transport | No | There will be dust generation due to construction activities, handling of construction material and movement of construction vehicles. Hence, there will be a slight increase in particulate matter levels during construction phase. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive emissions during unloading of construction material and concrete mixers. Negligible emission from DG sets are also expected. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | During the construction phase, there will be dust generation due to transportation of construction waste and materials.
Occasional odor is possible from STP. | 5.6 | Emissions from incineration of waste | No | Not applicable. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable. | 5.8 | Emissions from any other sources | No | Not applicable. | |
6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Construction phase:
Noise will be generated from following sources during construction phase:
1. Construction machinery
2. Proposed construction activity
The impacts resulting from these will be mitigated by providing equipments like ear plugs, ear muffs for workers. The noise vibration will also be controlled by using damped foundations and minimizing the number of hours for their usage.
Operation phase:
Minimal noise from vehicular movement of the occupants and visitors. | 6.2 | From industrial or similar processes | No | Not Applicable | 6.3 | From construction or demolition | Yes | Noise will be generated from demolition and construction activity mainly from concrete mixers, trucks, tower cranes, etc. | 6.4 | From blasting or piling | No | Not applicable. | 6.5 | From construction or operational traffic | Yes | Construction phase:
Noise will be generated due to trucks carrying the construction material/debris and construction activities.
Operation phase:
Minimum noise will be generated from vehicular movement of the occupants and visitors. | 6.6 | From lighting or cooling systems | No | Not applicable. | 6.7 | From any other sources | No | Not applicable. | |
7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not applicable | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | It is estimated that about 75 KLD of sewage will be generated from the Site. It would be treated in Sewage Treatment Plant (STP) of 100 KLD capacity to meet the prescribed land disposal standards. The treated water will be reused in flushing, miscellaneous washing and landscaping. | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Dust particles generated during construction will be settled continuously by spraying water. No pollutant emission except for DG emissions in case of power failure (rare) is envisaged. | 7.4 | From any other sources | No | Not applicable | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Not applicable | |
8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not applicable | 8.2 | From any other causes | No | Not applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | Project is in Earthquake Zone III. The design of the building is as per the IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings). Structural stability certificate is enclosed as Annex XI. | |
9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The project site is within the well-developed area of Mangalore Municipal Corporation limits where all infrastructural facilities are already available. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Applicable | 9.3 | Set a precedent for later developments | No | Not Applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not Applicable | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | 1. Netravathi river - Approx. 3.4 km* towards west
2. Gurupur river - Approx. 3.4 km* towards south | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | Yes | Arabian Sea - Approx. 4.4 km* towards West | 5 | State, National boundaries | No | Not Applicable | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | No | The site is densely populated located within Mangalore City Corporation | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | The Project site is within Mangalore City Corporation limits where high quality educational and community facilities are available. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not Applicable | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Project is in Seismic Zone III. The building will be designed as per IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings). | | Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | | Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | Shrinath Hebbar | Designation | Proprietor | Name of Company (Applicant Name should not be given here) | LAND TRADES BUILDERS & DEVELOPERS | Address | Milestone 25, 5th Floor, Shop No. 514, Door No. 15-5-223/140, 141, Collectors Gate Junction, Mangalore |
|
|