| Form-1 | | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | | | 1. Basic Informations | | Project Name | M/s SECRETARIAT COMPLEX OF TELANGANA STATE GOVERNMENT | Company/Organisation Name | PROPOSED SECRETERIAT COMPLEX OF TELANGANA STATE GOVERNMENT | | Registered Address | saifabad, Near Necklace road, Hyderabad Telangana 500022 | Legal Status of the Company | Others |
| | 2. | | Address for the correspondence: | | (a)Name of the Applicant | Engineerinchief Rb | | (b)Designation (Owner/ Partner/ CEO) | Engineerinchief | | (c)Address | 4th Floor, Engineer In Chief, Building and NH, Road and Building department, Governament of Telangana, Erram Manzil, Telangana,,Khairatabad,Hyderabad,Telangana-500082 | | (d)Pin code | 500082 | | (e)E-mail | cebldgs@gmail.com | | (f)Telephone No. | 40-40179770 | | (g)Fax No. | | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 8(a) Building and Construction projects
| | (b)Minor Project/Activity | NIL | | (c)Category | B2 | | (d)Proposal Number | SIA/TG/MIS/169948/2020 | | (e)Master Proposal Number(Single Window) | SW/169946/2020 | | (f)EAC concerned (for category A Projects only) | INFRA-2 | | (g)Project Type(New/Expansion/Modernization) | Fresh EC |
|
| | 4. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Telangana | |
| | Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Telangana | Hyderabad | Khairatabad | Saifabad | | | 5. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (c)Reason | -1 | | (d)Supporting Document | NILL | |
| | Location of the project | Saifabad, near Necklace Road, Hyderabad Dist., Telangana State | | | Town / Village (Name of more than one town may be entered by separating with) | Saifabad, near Necklace Road, Hyderabad Dist., Telangana State | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Saifabad, near Necklace Road, Hyderabad Dist., Telangana State | | State | Telangana | District | Hyderabad | | Tehshil | Khairatabad | Pincode | 500063 | | Nearest railway station | Nampally | Distance from the project site | 1.5 | | Nearest airport | Begumpet | Distance from the project site | 4.3 | | Nearest Town/City/District Headquarters | hyderabad | Distance from the project site | 0 | | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Saifabad, near Necklace Road, Hyderabad Dist., Telangana State | Upload GPS file | Copy of Kml File  Uploaded GPS file | | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | | Brief summary of project | Uploaded Brief summary of project | | | | Does your project location falls under out of any following areas | None of above Areas | | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 66479.92 | Existing Built Up Area(In Meter /Sqr) | 0 | | Does it attract any of the general conditions given below? | No | | | | Does it attract the specific condition given below? | No | | | | Interlinked Projects | No | | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | | Whether there is any Government Order/Policy relevent/relating to the site? | Yes | Upload Order/Policy | Uploaded Order/Policy | | Forest land involved(hectares) | 0 | | | | Is there any litigation pending against the project? | Yes | | | | (a) Name of the Court | National Green Tribunal and High Court of state of Telangana | (b) Case No | 107 NGT/136,142 & 145 of 2016, 66 & 71 of 2019 | | (c) Orders/ directions of the Court, If any and its relevance with the proposal project. | Yes | Reason | Demolish of Existing Telangana Secretariat building | | Attach court order(s) given in this regard | Uploaded court order | | |
| 1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | There will be no change in land use as earlier also there are secretariat buildings in the same premises. Project site is a gently undulating land.
The proposed new Secretariat complex is in the Multiple use zone as per the HMDA Master plan. Hence no change in land use of the project. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | Old secretariat buildings located within the project site were demolished. There are 607 trees of different species in the project site. No clearing/ pruning/ cutting any of the existing trees in the project site.
27 trees are coming under the proposed Secretariat building area. R&B & NH Department is proposing to translocate them within the site premises. | | 1.3 | Creation of new land uses? | No | The site will be used for construction of Proposed Secretariat Complex within the same premises. No change in land use is proposed. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | Soil testing was not yet done. | | 1.5 | Construction works? | Yes | All Construction activities will be confined to the project site only. There will be no changes outside the project site. Construction of Proposed Secretariat Complex will be done as per the applicable norms/ byelaws. | | 1.6 | Demolition works? | Yes | Demolition works were carried out and old structures were demolished in the site. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Most of the workers were hired from the nearby areas. Temporary sheds will be provided for security persons and outside laborers. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | No | The project involves development of Secretariat Complex which requires adequate engineered earthworks.
Excavation will be done for construction of footing & foundations.
1. Excavation of soil (earthwork) :
Excavation of earth 10592 Cum.
Excavation of rock 1513 Cum.
2. Filling of soil :
Filling with useful available earth 6355 Cum.
Filling with carted gravel 35126 Cum.
Filling with M sand 8665 Cum.
Almost all the excavated material will be backfilled in the site. | | 1.9 | Underground works including mining or tunneling? | No | Not Applicable | | 1.10 | Reclamation works? | No | Not Applicable | | 1.11 | Dredging? | No | Not Applicable | | 1.12 | Offshore structures? | No | Not Applicable | | 1.13 | Production and manufacturing processes? | No | Not Applicable | | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary site office/Room/Shed will be provided at site. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | During Construction Phase :
? Solid waste during construction phase will mainly comprise construction waste. It will be reused back in the project for filling of low lying land.
? Small amounts of Municipal solid waste will be generated and it will be disposed to the nearby GHMC Municipal bins.
? Small quantities of liquid waste will be generated from labour camps during construction phase and the same will be disposed through septic tank followed by soak pit.
During Operation Phase : | | 1.16 | Facilities for long term housing of operational workers? | No | None envisaged. | | 1.17 | New road, rail or sea traffic during construction or operation? | No | The site has good existing road network connectivity. Most of the old existing roads will be used for vehicular movement and only few internal roads will be developed as per the site layout for parking facilities and other staff amenities. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | None | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not Applicable | | 1.20 | New or diverted transmission lines or pipelines? | No | None envisaged | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | None envisaged | | 1.22 | Stream crossings? | No | None envisaged. There is no stream crossing in the proposed site. | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Water requirement during construction will be met through tankers and operation phases will be met through Bore well & Municipal supply (HMWS&SB). | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | FTL of Hussain Sagar Lake is passing adjacent to the site boundary. A buffer zone of 30 m. is left for the FTL of Hussain Sagar Lake. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transfer of material was done by vehicles to the construction site. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | None envisaged | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | None envisaged | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Construction workers will be hired temporarily and will be housed in the site during construction phase. | | 1.29 | Introduction of alien species? | No | None envisaged. All plantations will be of indigenous species. | | 1.30 | Loss of native species or genetic diversity? | No | None envisaged | | 1.31 | Any other actions? | No | None envisaged | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Total plot area of 26.29 Ac. is in Govt. Land. | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water requirement for the project is 207 KLD. Source of the water is Ground Water & Municipal supply. | | 2.3 | Minerals (MT) | No | Not Applicable | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Coarse & Fine Aggregate, Granite, Kota stone, marble bricks, sand, cement, steel. From local traders or nearby sites. | | 2.5 | Forests and timber (source – MT) | Yes | Timber for Doors & windows | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | About 5000 KVA power will be required for the Project and it will be sourced from TSSPDCL.
4 DG sets 1250 KVA will be provided as a backup power source. | | 2.7 | Any other natural resources (use appropriate standard units) | No | None | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | Only HSD will be used for backup power DG sets. Paints are used during construction. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | None envisaged | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | The new secretariat complex will be developed on Govt. Land and living condition of the people will not change. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | | 3.5 | Any other causes | No | None envisaged | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | Yes | Almost all the earthwork will be reused into backfilling and leveling. There are no overburden or mine waste. The demolition waste was disposed as per MSW Rules 2016. | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The total municipal waste generated from the project will be 700 kg/day. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used batteries : 4 no.s/ year
Waste oil from D.G. sets : 250 LPA
Transformer Oil – 100 LPA | | 4.4 | Other industrial process wastes | No | Not Applicable | | 4.5 | Surplus product | No | Not Applicable | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sludge from STP will be used as manure for green belt development. | | 4.7 | Construction or demolition wastes | Yes | The amount of construction debris may be generated which will be segregated and whatever re-saleable will be sold to supplier and rest waste will be used for filling up of low lying areas and development of internal roads and boundary walls etc. Any excess construction debris will be sent to GHMC C&D waste management Facility, Jeedimetla. | | 4.8 | Redundant machinery or equipment | No | Most of the equipment used for the construction will be hired and any surplus equipment and material that is found will be sold off to the appropriate agencies. | | 4.9 | Contaminated soils or other materials | No | No soil Contamination is anticipated as the proposed project being a construction project all the waste generated will be recyclable in nature (Domestic in nature). | | 4.10 | Agricultural wastes | Yes | Horticulture waste will be generated and shall be composted for organic manure. | | 4.11 | Other solid wastes | Yes | Solid Waste like rubbles, used up cement, broken bricks etc. which shall be used for filling up of low lying areas during development stage. | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions will be mainly from vehicles running at the project site during construction and operation period and secondly from the DG sets used for backup power source (during power failures only for a short duration). High Speed Diesel (HSD) will be used for the DG sets. The main emissions will be SO2 and NOx The D.G Sets will be acoustically enclosed so as to meet the norms laid down by CPCB.
For Proper dispersion of pollutants, the stack height meeting CPCB Norms will be maintained. | | 5.2 | Emissions from production processes | No | Not Applicable as this is a construction project | | 5.3 | Emissions from materials handling including storage or transport | Yes | The main emissions during the construction will be PM (Particulate Matter) from loading and unloading of material on the site, SO2 and NOx from the combustion of fossil fuels and from the vehicles.
The particulate matter will be controlled by sprinkling water at regular intervals on roads. The SO2 and NOx will be controlled by proper maintenance of the vehicles. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Fugitive emissions are likely during the construction activities from the materials. These are temporary in nature. The main emissions during the construction will be Particulate Matter from the loading and unloading of materials on the site. SO2 and NOx from the combustion of fuels in vehicles and construction equipment. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | The particulate matter will be mainly generated from loading and unloading of the material at the site. Other municipal solid waste will be disposed off to the Municipal solid waste dump yard. The construction material will be handled carefully to prevent any spill over or wastage. Construction labor will be provided with proper sanitation to avoid any unhygienic conditions. Therefore no odor generation is expected. | | 5.6 | Emissions from incineration of waste | No | Not envisaged | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not envisaged | | 5.8 | Emissions from any other sources | No | Not envisaged | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise is anticipated during activities such as drilling, concrete mixing and crushing etc. These are temporary in nature and will be minimized by adopting proper maintenance such as greasing, oiling and insulations (acoustic enclosures) for DG sets for noise pollution control. | | 6.2 | From industrial or similar processes | No | Not Applicable as this is a construction project. | | 6.3 | From construction or demolition | Yes | Construction activities such as Site preparation, Laying of roads, drilling, Crushing | | 6.4 | From blasting or piling | No | Not envisaged. | | 6.5 | From construction or operational traffic | Yes | Vehicles or Trucks shifting the load from one place to another | | 6.6 | From lighting or cooling systems | No | HVAC will be used for cooling in commercial building. | | 6.7 | From any other sources | No | None | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Used batteries & waste oil from D.G. sets will be stored separately and will not be allowed to contamination of land during the construction & operational phases. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | The sewage shall be treated to achieve the standards prescribed by MoEF & CC during operation phase. While the discharges from temporary toilets during construction shall be sent to septic tank followed by soak pit. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | In Building and construction project the air pollutants are minimal; to minimize the same greenbelt will be developed along the boundary and roads. | | 7.4 | From any other sources | No | None envisaged | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Proper Environmental Management Plan will be followed for air, water, noise pollution and solid waste management. Hence no long term impacts are envisaged and this being a construction project the impact felt on the area will be temporary in nature as most of the impacts are all construction impacts. | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Fire hydrant and Fire-fighting systems will be installed and safety precautions will be followed as per the safety rules.
Only Diesel in small quantity and paints during construction phase will be flammable material used and stored. | | 8.2 | From any other causes | No | All safety measures will be taken as per the local bye laws prior to commencement of operations so as that accidents will not take place | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | None envisaged.
The project site falls in the seismic zone-II, which is seismically considered safe. | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Yes. Both construction and operation phase will enhance the supporting, utilities development in the area around.
Improved aesthetic look by avenue plantation and landscape development. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | | 9.3 | Set a precedent for later developments | Yes | The project will provide good infrastructure which sets an example for later developments. | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | None envisaged as the proposed development is a construction project | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Kasu Brahmananda Reddy National Park – 4.6 km (WNW) | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Water Bodies:
Hussain Sagar Lake – 30 m.
Musi River – 3.3 km (S)
Nadimi Cheruvu – 8.8 km (NNE)
Miryalaguda Cheruvu – 9.3 km (NNE)
Pedda Cheruvu – 8.3 km (ENE)
Mohini Cheruvu – 5.5 km (ESE)
Sarurnagar Cheruvu – 7.7 km (SE)
Mir Alam Cheruvu – 7.2 km (S)
Musa River – 7.8 km (SE)
Durgam Cheruvu – 8.5 km (W)
Kamunoni Cheruvu – 9.2 km (NW)
Maisamma Cheruvu – 8.0 km (NW)
Kistappa Vagu – 7.0 km (NNW)
Tank near Panjagutta – 2.8 km (NW)
Tank near Yousufguda – 5.3 km (NW)
Tank near Shaikpet | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Kasu Brahmananda Reddy National Park – 4.6 km (WNW)
Nehru Zoological Park – 6.2 km (S) | | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | | 5 | State, National boundaries | No | No state boundary with in 10 kms radius | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | NH – 7 (Connecting Varanasi to Kanyakumari) is adjacent to the site in South Direction | | 7 | Defence installations | No | Not Applicable | | 8 | Densely populated or built-up area | Yes | Site Area is within the Hyderabad City Region | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, Schools, Places of worship and Community Facilities are present near the site. | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | Historical Places within 10 km radius are :
? Charminar
? Golconda Fort
? Quthub Shahi Tombs
? Falaknuma Palace
? Mahakali Temple
Tourist Places within 10 km radius are :
? Buddha Statue in Hussain Sagar Lake
? Tank Bund
? Charminar
? Macca Masjid
? Birla Mandir
? Birla Planetarium
? Salarjung Museum
? Nehru Zoological Park
? Golconda Fort
? Qutubh Shahi Tombs
? Falaknuma Palace
? Bapu Ghat | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | Not Applicable | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | Not Applicable | | | Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | | | Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | | | Name of Applicant | Engineerinchief Rb | | Designation | Engineerinchief | | Name of Company (Applicant Name should not be given here) | PROPOSED SECRETERIAT COMPLEX OF TELANGANA STATE GOVERNMENT | | Address | saifabad, Near Necklace road, Hyderabad |
|
|