Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Bunts Alias Nadavara Mathr Sangha Centenary Convention Centre Company/Organisation Name BUNTARA YANE NADAVARA MATHR SANGHA
Registered Address SRS Home, Bunts Hostel, Mangalore Karnataka 575003 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Gopal Shetty
(b)Designation (Owner/ Partner/ CEO) Secratory
(c)Address SRS Home, Bunts Hoatel, Mangalore,,Mangalore,Dakshina Kannada,Karnataka-575003
(d)Pin code 575003
(e)E-mail buntscircle@gmail.com
(f)Telephone No. 824-2493701
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/KA/MIS/151947/2020
(e)Master Proposal Number(Single Window) SW/151945/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDakshina KannadaMangaloreKodialbail
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Sy. No. 1575/8 (P), 1575/13, 1575/14, 1575/16
Town / Village
(Name of more than one town may be entered by separating with)
Kodialbail Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Sy. No. 1575/8 (P), 1575/13, 1575/14, 1575/16
State Karnataka District Dakshina Kannada
Tehshil Mangalore Pincode 575003
Nearest railway station Mangalore Central Railway Distance from the project site 1.7
Nearest airport Bajpe International Airport, Mangalore Distance from the project site 9.2
Nearest Town/City/District Headquarters Within the limits of Mangalore City Municipal Corporation Distance from the project site 0
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Mangalore City Municipal Corporation Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 72795.08 Existing Built Up Area(In Meter /Sqr) 00
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The existing buildings were used as student hostels in the past. The new construction will be at the same location. The extend of land for construction will increase. (Refer Annex VI)
1.2 Clearance of existing land, vegetation and buildings? Yes Existing hostel buildings and about 15 trees will be cut.
1.3 Creation of new land uses? Yes Construction work in single tower of 3B + G + 21 UF.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Pre construction investigation will be carried out
1.5 Construction works? Yes General civil construction, inter alia, comprising construction of a multistoried building with associate services.
1.6 Demolition works? Yes All the existing buildings will be demolished as shown in the Survey Drawing enclosed as Annex VII.
1.7 Temporary sites used for construction works or housing of construction workers? No Approx. 150 labors will be engaged during peak construction. The labors will be brought to the site every morning by the contractor, No labor colony is proposed at the site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes The ground level of the proposed site is about 3 m higher than the main road level. The basements will be natural at road level. Since a part of the land is already levelled, 9,000 cu.m the earth work involved will be less for the construction of the basements. The additional excavated earth will be deposited after taking consent from the land owner.
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? Yes Temporary sheds will be set up at the site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: Demolition and segregation of waste from pulling down the existing buildings: Construction and demolition waste will be segregated and reused at the project site to the maximum possible. Recyclable waste such as steel and paper will be sold to recyclers. Proper facility for storage of construction wastes is made at Project site. The sewage generating from the temporary toilets at the project site will be connected to the UGD facility available at the site. Operation Pha
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? Yes Construction phase: Temporary traffic of approx. 5 - 10 trucks per day for haulage of construction material and almost same numbers for the transport of demolition waste Operation phase: The junction in front of the substantial traffic throughout day and night. There will be increase in vehicular traffic on the road when the convention halls are occupied.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Applicable
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? Yes Construction phase: Approx.65 kld during peak construction period Source: Existing open well and MCC supply Operation phase: 131 kld of fresh water Source: Mangalore City Corporation Supply Refer Annex IV Water Balance.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not Applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction Phase: ? Construction materials will be transported to the site by the means of trucks/dumpers. ? Construction workers are brought to the site by contractor. Operation Phase: ? Approx. 600 people will work in the offices and hotel on daily basis and use self-driven vehicles or public transport facilities. Visitors to the convention hall will also use self-owned/ public transportation facilities or special hired vehicles.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction Phase: Construction labors will be coming work the work. However, no labor colony is proposed at the site Operation Phase: Approximately 1,900 commuters will be using the multipurpose building (offices) and Approx. 300 people will be staying in the hotel on full occupancy. More floating population is expected when the convention and marriage halls are engaged
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No No change in landuse. The site already has buildings constructed in the past
2.2 Water (expected source & competing users) unit: KLD Yes Construction phase: Source: Existing open well and MCC supply Requirement: Approx. 65 kld Operation phase: Source: Mangalore City Corporation Requirement: 131 kld of Freshwater + 162 kld of Recycled water. Refer Annex IV for Water Balance. Water NOC shall be obtained from MCC.
2.3 Minerals (MT) No The proposal pertains to the construction activity only.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Approx. construction material requirement. Cement approx. : 3,00,000 Bags Steel approx. : 3,000 MT Sand approx. : 27,000 cum Block Masonry approx. :5,90,000 cum Jelly (20mm) : 18,000 mm Jelly (40mm) : 500 mm Material shall be procured from local Dealers.
2.5 Forests and timber (source – MT) No Minimal use of timber runners for shuttering work in civil construction.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Construction phase: Approx. 125 kVA from MESCOM Operation Phase: Approx. 1200 KW from MESCOM Back up: 2 DG set of 650 kVA with fuel requirement of (Diesel) approx. 260 l/hr.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable. No Hazardous substances or material will be used in any commercial and domestic activity during operation phase.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Not Applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes During operation phase: Total Solid waste: Approx. 1,110 kg/day, of which approx. 555 kg will be biodegradable 444 kg non-biodegradable and 111 kg inner waste, will be generated per day. After segregation, Biodegradable waste shall be composted in the OWC and used as manure at site and extra will be sold. Recyclable waste shall be sold to recyclers. Non-biodegradable will be sent to Common Solid Waste management Facility.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Sump oil from the standby DG to be sold to Authorized Recyclers.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Operation phase: Total sewage sludge generated from the proposed activity will be about 7 kld which will be used as manure along with the manure from OWC in gardening.
4.7 Construction or demolition wastes Yes Demolition waste will be segregated and sold/ reused. Concrete wastage and wasted mortar will be crushed, aggregated and mixed with other road sub-base construction material. Waste/damaged construction material, sieved sand, broken brick bats and chipped plaster will also be used in the construction of roads and for backfill and consolidation of surfaces under podia, under margins/pitching of storm water drains, periphery curbing of roads etc. Broken tiles, wasted sanitary ware, broken glass and
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Horticulture waste will be composted along with other biodegradable wastes and used as manure.
4.11 Other solid wastes Yes Minimum Electronic waste will be generated from office buildings and sold to authorized vendors.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be minor vehicular pollution during construction and operation phase. Negligible emissions from DG set in case of power failure and from vehicles of the occupants.
5.2 Emissions from production processes No Not applicable.
5.3 Emissions from materials handling including storage or transport No There will be dust generation due to demolition activities, handling of construction material and movement of construction vehicles. Hence, there will be a slight increase in particulate matter levels during construction phase.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive emissions during unloading of construction material and concrete mixers. Negligible emission from DG sets are also expected
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No During the construction phase, there will be dust generation due to demolition, transportation of debris, construction waste and materials. Some odor is possible from STP.
5.6 Emissions from incineration of waste No Not applicable.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable.
5.8 Emissions from any other sources No Not applicable.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction phase - From demolition and concrete mixers, movement of trucks etc. Operation phase –Minimal traffic noise due to on-site traffic.
6.2 From industrial or similar processes No Not applicable.
6.3 From construction or demolition Yes Noise will be generated from demolition of existing building and cutting down of trees and for the construction activity mainly from concrete mixers, trucks, tower cranes, etc.
6.4 From blasting or piling No Not applicable.
6.5 From construction or operational traffic Yes Construction phase: Noise will be generated due to trucks carrying the construction material/debris and construction activities.
6.6 From lighting or cooling systems No Not applicable.
6.7 From any other sources No Not applicable.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not Applicable
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Approx. 250 kld of sewage would be generated which will be treated to meet the discharge standards of KSPCB. The treated wastewater will be reused for flushing and horticulture.
7.3 By deposition of pollutants emitted to air into the land or into water No Dust particles generated during construction and demolition will be will be controlled by implementing dust control measures.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable.
8.2 From any other causes No Not applicable.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Project is in Earthquake Zone III. The design of the building is as per the IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings).
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Not Applicable
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Pilikula Nisargadama - Approx. 7.2 km towards North East Gurupura River - Approx. 2.2 km towards West Nethravati River - Approx. 4.2 km towards South
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not Applicable
4 Inland, coastal, marine or underground waters Yes Approx. 3.4 km towards West (Aerial distance)
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area No The site is densely populated locality within Mangalore City Corporation
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes The Project site is within Mangalore City Corporation limits where high quality educational and community facilities are available.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Project is in Seismic Zone III. The building will be designed as per IS 1893: Part (1) 2002 (Criteria for earth quake resistance design of structures - Part 1 General Provisions and Buildings).
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGopal Shetty
DesignationSecratory
Name of Company (Applicant Name should not be given here)BUNTARA YANE NADAVARA MATHR SANGHA
AddressSRS Home, Bunts Hostel, Mangalore
Print