APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notification No
Weather Consent to Establishment Obtained NA
Upload copy of CTE NA
1.Name of the Project Koodalaiyathur
Proposal No SIA/TN/MIN/76465/2022
2.Project Sector Non-Coal Mining
3.Location of the project S.F. No.8 (P), Vellar river in Koodalaiyathur II Village, Srimushnam Taluk, Cuddalore District, Tamil Nadu
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectTamil Nadu
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Tamil NaduCuddaloreKattumannarkoil
7.Town / VillageSrimushnam Taluk/Koodalaiyathur Viillage
8.Plot/Survey/Khasra No.S.F No 8(P)
9.S. No. in the schedule1(a) Mining of minerals
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 373220 cum /16.0 Ha ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Neyveli Railway Station, 13 km
18. Nearest airport along with distance in kms Trichy Airport, 109 km
19. Nearest Town/City/District Headquarters along with distance in kms Cuddalore , 46 km
20. Distance of the project from nearest Habitation 1.5 , 1.5 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 115
29. Mining lease area (in ha.) 16.0
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) No
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed project is made for excavation of Sand to remove any obstacles on the flow direction of the river and recharging on neighboring open wells. (No major excavation or quarry or any land damage involved in this project except removal of a thin layer of 1.0m of sand. The land is river basin, now uneven & irregular shape of the poramboke land. There will be no permanent or temporary change in land use.
1.2 Clearance of existing land, vegetation and buildings? No There is no necessity for clearance of existing lands like pumping schemes, bridges, buildings and vegetation etc.,
1.3 Creation of new land uses? No The site itself a part of river basin. It will be used to recharge the open wells and nearest kanmoi.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not applicable, as it is sand mining project.
1.5 Construction works? No The scope of any construction work does not arise in this project.
1.6 Demolition works? No The scope of demolition work does not arise in this project.
1.7 Temporary sites used for construction works or housing of construction workers? No Housing facility is not provided for the labourers as people in the nearby villages will be employed.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No The project does not involve any construction process.
1.9 Underground works including mining or tunneling? No Quarrying is proposed in open cast. No underground works will be involved.
1.10 Reclamation works? No Reclamation work is not involved. It is a river channel as sand is transported and covered by during the rainy season.
1.11 Dredging? No No Dredging is involved.
1.12 Offshore structures? No No Offshore structures are constructed.
1.13 Production and manufacturing processes? Yes Temporary approach roads will be formed connecting the existing road. No Top soil removal. Sand will be transported to private\public uses. Totally 3,73,220 m3 is permitted by the Dept.of.Geology and Mining, Cuddalore for One Year from the date of execution. Poclain/Excavator used for loading and Tipper used for transportation. Excavated area shall be leveled for free flowing of river water.
1.14 Facilities for storage of goods or materials? No The material will be loaded directly to the consumer by Tipper. No storage of goods or materials shall be stored with in this mining area.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? No There is no waste material or no liquid effluents and no waste water will be generated from the quarrying process.
1.16 Facilities for long term housing of operational workers? No No housing facility will be provided, as labourers from the nearby villages will be employed for the mining operation
1.17 New road, rail or sea traffic during construction or operation? Yes Temporary approach roads will be formed connecting the existing road and quarry site by using overburden.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The existing transport facilities in the project area will be utilized. No new interlinked rail, air waterborne or any other transport facilities will be utilized.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No The project will not cause any changes in the existing traffic movements.
1.20 New or diverted transmission lines or pipelines? No The project does not involve diversion of transmission / pipe lines.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No There is no Impoundment, damming, culverting, realignment needed and there will be no changes in hydrology of watercourses or aquifers.
1.22 Stream crossings? Yes The Site is itself in River Basin.
1.23 Abstraction or transfers of water from ground or surface waters? No It is a shallow quarrying or removal of 1.0m depth of Sand. No change in ground water/surface water flow direction.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There won’t be any changes in the water bodies or the land surface.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The workers will be using their own conveyance for commuting to the quarry during operation. Since there is no construction or decommissioning involved in this project, there is no need of transport of personnel or materials.
1.26 Long-term dismantling or decommissioning or restoration works? No No Long-term dismantling or decommissioning is involved in this project.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes The excavated area will be used as rain and flood water free flowing without any obstacles direction to augment ground water level which gives positive impact on the environment.
1.28 Influx of people to an area in either temporarily or permanently? No Only the labourers working in the site and the drivers of the consumer vehicles will be entering the site on temporary basis during the quarry operating time. (7.00 am to 5.00 pm).
1.29 Introduction of alien species? No There is no introduction of alien species.
1.30 Loss of native species or genetic diversity? No No loss of native species or genetic diversity will occur.
1.31 Any other actions? Yes Environmental measures to be adopted shall be Dust control at source. Avoid over loading and deepening the site beyond the permitted depth. Land degradation by undulation should be avoided. Emission test of vehicles should be in-tack to maintain minimum emission level of flue gases. Noise level should not exceed 75 dB Tarpaulin should be covered over the loose soil, during transporting. No unauthorized person shall drive the vehicles.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The mining area of 16.00.0 Hectares is of Vellar river. It is dry, barren, uneven and unfit for any other use. It becomes fit for free flowing of river water by means of sand mining.
2.2 Water (expected source & competing users) unit: KLD Yes Water requirement shall be 5.0 KLD per day. a) Drinking and Utilities 2.0 KLD b) Dust suppression and Green belt of water 3.0 KLD
2.3 Minerals (MT) No The mineable reserve is estimated as 496382.6 MT or 373220m3 up to 1m below the River bed level including Shoal with an Average thickness of 1.332m.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No The proposed project is a removal of Sand from a Vellar river basin, it does not involve any usage of construction materials.
2.5 Forests and timber (source – MT) No There is no forest and timber is used.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Loading of sand shall be done by Poclain/excavator into Tipper. Fuels are used for operating vehicles during quarrying process which is about 55-60 lit/day. There are no HT or LT lines
2.7 Any other natural resources (use appropriate standard units) No Nil
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No hazardous materials used in this project.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No There is no change in occurrence of disease or affect disease vectors due to Sand removal.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project will provide direct and indirect employment and thereby improve the economic standard of people in the surrounding village. Besides that nearly 10% of the revenue from quarrying operation is given to local panchayat for its development.It also helps in preventing migration of rural labour to nearby Urban centers avoiding socio-economic problems.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No There is no hutment in the lease area. No human being will be displaced from the project area so no person will be affected contrary local people will get job opportunities and better facilities. The excavated sand is properly covered by using tarpaulins; leading roads to the quarries are wetted frequently to avoid dust.
3.5 Any other causes No NIL
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No Top soil available. Over burden which is shoal will be excavated. A part of shoal which contains debris and clay sand will be dumped along the bank to increase its strength.
4.2 Municipal waste (domestic and or commercial wastes) Yes The municipal solid waste will be collected by bin in the site and properly disposed.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No The proposed removal of Sand will not produce any hazardous waste Materials.
4.4 Other industrial process wastes No Other industrial process wastes are not generated.
4.5 Surplus product No There is no surplus product.
4.6 Sewage sludge or other sludge from effluent treatment No No effluent is generated or treated in this quarry.
4.7 Construction or demolition wastes No There is no Construction or demolition waste.
4.8 Redundant machinery or equipment No There is no redundant machinery or equipment storage in the project site.
4.9 Contaminated soils or other materials No No Contaminated soils or other materials.
4.10 Agricultural wastes No There is no agricultural wastes
4.11 Other solid wastes No There is no solid waste generated/disposed except shoal containing some debris and clay sand shall be dumped along bank of the river to increase the bank height and protect the neighbor area from inundation.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Mining would be carried out by opencast method by mechanized means using Poclain/Excavators and tippers.
5.2 Emissions from production processes No No emission of gases
5.3 Emissions from materials handling including storage or transport No Not Applicable. Except from Vehicles during transportation. Vehicles will be properly serviced and maintained. Fuels used are of good quality to minimize the emission level.
5.4 Emissions from construction activities including plant and equipment No Not Applicable
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The project will not have any odours, since it is only removal of Sand. There will be dust emission during handling of overburden and transport of sand. It will controlled by sprinkling of water on exposed bed, covering of tipper by tarpaulin.
5.6 Emissions from incineration of waste No There will be no incineration of waste.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No incineration of solid waste or materials
5.8 Emissions from any other sources No Nil
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The loading vehicle poclain/ excavator can produce noise but are maintained within permissible limits. Lubricating and preventive maintenance shall be taken to control noise from the loading vehicle.
6.2 From industrial or similar processes No No Noise or vibration will be generated.
6.3 From construction or demolition No There is no construction and demolition activity.
6.4 From blasting or piling No No drilling and Blasting. No compressor or any other equipments creating noise or vibration is used.
6.5 From construction or operational traffic No The transport vehicles can produce noise but are maintained within permissible limits, by keeping vehicles in proper condition as per RTO & TNPCB norms and maintenance under experience and qualified mechanics.
6.6 From lighting or cooling systems No There is no lighting or cooling systems.
6.7 From any other sources No No other sources
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No No hazardous materials will be used in the process. Oiling and lubrication of transporting vehicles will be done by using oil tray to prevent spillage of oil. Vehicles and machinery will be well maintained to prevent leakage of oil.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No No sewage or disposal of effluents or waste by dispersion trench.
7.3 By deposition of pollutants emitted to air into the land or into water Yes The emissions of SO2 (Sulfur dioxide) & NO2 (Nitrogen dioxide) may be due to use of diesel operated vehicles such as excavator and Tipper. Better maintenance of equipment in good condition will help to reduce such emissions. The dust emission will be suppressed by source itself by sprinkling of water.
7.4 From any other sources No No other sources
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No There is no risk of long term build up of pollutants in the environment, since it is only open cast mine.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No No blasting. No inflammable material used for quarrying.
8.2 From any other causes No Mines safety preventive measures will be followed during operation of the machinery. No person shall be allowed within the swing area of the excavator and tippers during loading operation. The quarrying activities will be monitored under the supervision of experienced and qualified competent mines foreman.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Quarry operation\removal of Sand will be stopped during the flood season, if any.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Removal of sand in Vellar river is for proper free flowing of water without any obstacles. There will not have any impact on Environment. No housing development or extractive industries or supply industries involved in this project
9.2 Lead to after-use of the site, which could have an impact on the environment No The Sand is removed to deepen for free flow of water without any obstacles. In fact this removal of sand is beneficial to the society for supply of water and the sand is used for Building Construction. Moreover, the excavated area shall be replenished during the next rainy season
9.3 Set a precedent for later developments No Not arise
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Only sand quarry operation is going to take place. No other negative impact.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No There is no Ecological landscape, cultural or other related value areas within 15kms radius.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No The site is itself in River Basin. There are no biospheres, national parks, sanctuaries, reserve forest in 1 kms radius from proposed project site. Interstate boundary is located at 174 kms from the site on the Northern side and Coastal zone is located at 38 km away on the eastern side, the bay of Bengal, as per Google image measurements and toposheet No. 58M/8.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No This area is not used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering and migration. There is no Endangered Species.
4 Inland, coastal, marine or underground waters Yes There is no Inland, Coastal – Bay of Bengal - 38 Kms -East.
5 State, National boundaries No The project site is located for about 174 kms away from the interstate boundary in Northern side.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No There are no routes or facilities used by the public for access to recreation or other tourist in the proposed project site
7 Defence installations No NIL
8 Densely populated or built-up area Yes Kanur village is located about 1.5 km on the Southern side with population of 3046 peoples as per 2011 census.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes There is no hospital or Primary school, village temples and primary health centers within 500m radius of the quarry. Village is located about 1.5 kms on the Southern side. This Sand removal will not affect any persons or structure or communities or place of worships.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No There is no high quality or scarce resources such as ground water resources, surface resources, forestry, agriculture, fisheries, tourism, rare minerals near the site.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No This area is not already subjected to any pollution or environmental damages.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No It is not an earth quake prone area or any other natural disasters. Adequate measures will be adopted to prevent flooding in the project site during rainy seasons.
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
ADDITIONAL MULTIPLE ENTERIES
Sr. no. Remarks Uploaded Additional Attachments
1 AMP letter, AD Cluster letter, VAO letter, Authorisation Letter Annexure-Additional Attachments
2 PPT Annexure-Additional Attachments
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameOFFICE OF THE EXECUTIVE ENGINEER PWD
DesignationEngineer
Company OFFICE OF THE EXECUTIVE ENGINEER PWD
AddressThe Executive Engineer,PWD,Water Resource Organization,Mining and Monitoring Division,Viluppuram district
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)21/06/2022The project proponent is requested to upload the signed PPT.
(2.)22/06/2022The corrections have been made as per the instruction received.
(3.)22/06/2022The corrections have been made as per the instruction received.
(4.)22/06/2022The corrections have been made as per the instruction received.
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record