APPENDIX I | (See Paragraph-6) | CATEGORY - B | | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I)Basic Informations | | | Whether proposal involved violation of EIA notification | NA | | Weather Consent to Establishment Obtained | NA | | Upload copy of CTE | NA |
| 1. | Name of the Project | Sahitis Sarwani Elite by M/s Sahiti Infratec Ventures India Private Limited | | Proposal No | SIA/TG/NCP/56919/2020 |
| | 3. | Location of the project | Survey Nos. 343/8, 343/9, 343/11, 343/12, and 343/13, Ameenpur, Patancheru Mandal, Sanga Reddy |
| | | 6. | State of the project | Telangana | | Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | Telangana | Sangareddy | Patancheru | (2.) | Telangana | Sangareddy | Patancheru | | 7. | Town / Village | Survey Nos. 343/8, 343/9, 343/11, 343/12, and 343/13, Ameenpur, Patancheru Mandal, Sanga Reddy District | | 8. | Plot/Survey/Khasra No. | Survey Nos. 343/8, 343/9, 343/11, 343/12, and 343/13, Ameenpur, Patancheru Mandal, Sanga Reddy District | | 9. | S. No. in the schedule | 8(b) Townships and Area Development projects.
|
| 10. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 687069.4 ha. | | 11. | New/Expansion/Modernization | New | | | 12. | Category of project | B | | 13. | Does it attract the general condition? If yes, please specify | No | | 15. | Does it attract the specific condition? | No | | 16. | Is there any litigation pending against the project? | No | | 17. | Nearest railway station along with distance in kms. | Lingampally railway station, 3.34 km | | 18. | Nearest airport along with distance in kms | Rajiv Gandhi International Airport, 32.7 km | | 19. | Nearest Town/City/District Headquarters along with distance in kms | Hyderabad , 21.4 km | | 20. | Distance of the project from nearest Habitation | 0.16 , 0.16 km | | 21. | Details of alternative sites examined shown on a toposheet | No | |
| 22. | Whether part of interlinked projects? | No | | | 23. | Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980? | No | | | 24. | Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972? | No | | | 25. | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No |
| 26. | Whether there is any Government Order/Policy relevent/relating to the site? | No | |
| 27. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | |
| 28. | Project Cost(in Lac.) | 120000 |
|
30. | Whether the proposed project/activity located in notified Industrial area(Yes/No) | No |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The site area is located in Hyderabad Metropolitan Development Authority area under Ameenpur, Patancheru. The present land use is Residential Apartments. Presently the land is barren and is not used for any productive purpose. The proposed project shall enhance the land cover. | 1.2 | Clearance of existing land, vegetation and buildings? | No | | 1.3 | Creation of new land uses? | No | Residential Apartments Construction Project. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Residential Apartments Construction Project. | 1.5 | Construction works? | Yes | Residential Apartments Construction Project. | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Residential Apartments Construction Project. | 1.9 | Underground works including mining or tunneling? | No | | 1.10 | Reclamation works? | No | | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | No | | 1.14 | Facilities for storage of goods or materials? | Yes | Construction materials like cement, steel, sand, paints, aggregate etc shall be stored on site. The cement and paints are stored indoor, while the remaining is stored out doors. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | The wastewater shall be treated and reused for green belt development, toilet flushing, excess treated water will be sent to sewer lines.. | 1.16 | Facilities for long term housing of operational workers? | Yes | Required labour shall be drawn from neighboring areas/villages. | 1.17 | New road, rail or sea traffic during construction or operation? | No | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | The domestic water requirement during occupation shall be drawn from HMWSSB | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Trucks shall be used for transporting the materials. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The local area is developing at a faster pace due to the commercial area development in the surrounding areas. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Undeveloped land of 9.6768 hectares | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Water requirement during occupation is 2770.3 KLD. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | Quantity of construction material requirement. | 2.5 | Forests and timber (source – MT) | Yes | Local authorized Suppliers | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | DG sets and construction equipment shall be used during construction, which shall use mainly HSD as fuel. | 2.7 | Any other natural resources (use appropriate standard units) | No | | |
3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | Hazardous materials used are; HSD, Paints etc. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | | |
4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | 12376 kg/day | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used oil: 410 l/year
Used Batteries: 23 nos. /year | 4.4 | Other industrial process wastes | No | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | 110 kg/day sludge from STP shall be reused as manure. | 4.7 | Construction or demolition wastes | Yes | 34353 Tons | 4.8 | Redundant machinery or equipment | No | | 4.9 | Contaminated soils or other materials | No | | 4.10 | Agricultural wastes | No | | 4.11 | Other solid wastes | No | | |
5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emissions from DG sets, operated only during load shut down by TRANSCO. | 5.2 | Emissions from production processes | No | | 5.3 | Emissions from materials handling including storage or transport | No | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Construction equipment and DG sets which mainly use HSD, as fuel shall generate emissions from temporary in-house batching plant etc. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | No | | 5.6 | Emissions from incineration of waste | No | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | | 5.8 | Emissions from any other sources | No | | |
6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Construction activity and the construction equipment are the main sources of noise and vibration during construction. While there are no major sources of noise during occupation phase. | 6.2 | From industrial or similar processes | No | | 6.3 | From construction or demolition | Yes | construction or demolition | 6.4 | From blasting or piling | No | | 6.5 | From construction or operational traffic | Yes | There will be an increase in the traffic density, which shall increase the noise levels of the area both during construction and occupation phases. | 6.6 | From lighting or cooling systems | No | | 6.7 | From any other sources | No | | |
7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | |
8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | | 8.2 | From any other causes | No | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | | |
9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The area is presently developing into a prime residential and commercial locality in view of the thrust given by Government of Telangana | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | | 9.3 | Set a precedent for later developments | Yes | The surrounding areas shall develop as residential/Commercial areas. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | The Kothaguda reserve forest located at a distance of 6.16 km and KBR National park at a distance of 12.92 km, Kazipalli reserve forest at a distance of 6.92 km. Kistaipalli RF at a distance of 9.31 km. Borampet RF at a distance of 9.05 km. Gajularamaram RF at a distance of 9.18 km. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | | 4 | Inland, coastal, marine or underground waters | No | | 5 | State, National boundaries | No | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | | 7 | Defence installations | No | | 8 | Densely populated or built-up area | Yes | The area is developing into a densely populated area other major developments in the vicinity etc. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospitals, Schools, Places of worship and community facilities are located in the project impact area. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | | | (IV) | PROPOSED TERMS OF REFERENCE FOR EIA STUDIES | (V) | Undertaking | | The aforesaid application and documents furnished here with are true to my knowledge | V.(i) | Name | SAHITI INFRATEC VENTURES INDIA PRIVATE LIMITED | Designation | MD | Company | SAHITI INFRATEC VENTURES INDIA PRIVATE LIMITED | Address | Sahiti Infratech Ventures India Pvt. Ltd.,
#501, Haras Hahabit, Jai Hind Layout,
Madhapur, Serilingampally,
Ranga Reddy District |
|
|