APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notification No
Weather Consent to Establishment Obtained NA
Upload copy of CTE NA
1.Name of the Project Mahaveer Crystal by K.B. Chandramouli HUF and Others
Proposal No SIA/TG/MIS/63659/2021
2.Project Sector INFRA-2
3.Location of the project Survey nos. 136/A, 138/1D, Gudimalkapur, Asif Nagar, Hyderabad, Telangana
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectTelangana
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)TelanganaHyderabadAsifnagar
(2.)TelanganaHyderabadAsifnagar
7.Town / VillageSurvey nos. 136/A, 138/1D, Gudimalkapur, Asif Nagar, Hyderabad, Telangana
8.Plot/Survey/Khasra No.Survey nos. 136/A, 138/1D, Gudimalkapur, Asif Nagar, Hyderabad, Telangana
9.S. No. in the schedule8(b) Townships and Area Development projects.
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 236392.2 ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Nampally railway, 3.98 km
18. Nearest airport along with distance in kms Rajiv Gandhi International Airport, 18.6 km
19. Nearest Town/City/District Headquarters along with distance in kms Hyderabad , 8 km
20. Distance of the project from nearest Habitation 0.1 , 0.1 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 50000
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) No
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes the site area is located in Hyderabad Metropolitan DEVELOPMENT Authority area under Gudimalkapur, Asif Nagar, Hyderabad
1.2 Clearance of existing land, vegetation and buildings? No
1.3 Creation of new land uses? No
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Bore holes shall be drilled for ground water abstraction, subject to the permission from the State Ground Water Authority
1.5 Construction works? Yes The present land use is residential apartment construction project
1.6 Demolition works? No
1.7 Temporary sites used for construction works or housing of construction workers? No
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Built up Area: Annexure I, Cut and Fill quantity: Annexure II
1.9 Underground works including mining or tunneling? No
1.10 Reclamation works? No
1.11 Dredging? No
1.12 Offshore structures? No
1.13 Production and manufacturing processes? No
1.14 Facilities for storage of goods or materials? Yes Construction materials like cement, steel, sand, paints, aggregate etc shall be stored on site.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The wastewater shall be treated and reused for flushing and on land irrigation purpose. The excess treated water if any shall be let out into Municipal sewer lines
1.16 Facilities for long term housing of operational workers? Yes Required labour shall be drawn from neighboring areas/villages
1.17 New road, rail or sea traffic during construction or operation? No
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No
1.20 New or diverted transmission lines or pipelines? No
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No
1.22 Stream crossings? No
1.23 Abstraction or transfers of water from ground or surface waters? Yes The domestic water requirement during occupation shall be drawn from HMWSSB
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Trucks shall be used for transporting the materials
1.26 Long-term dismantling or decommissioning or restoration works? No
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No
1.28 Influx of people to an area in either temporarily or permanently? Yes The local area is developing at a faster pace due to the commercial area development in the surrounding areas
1.29 Introduction of alien species? No
1.30 Loss of native species or genetic diversity? No
1.31 Any other actions? No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes Undeveloped land of 2.042 hectars
2.2 Water (expected source & competing users) unit: KLD Yes Ground water and HMWSSB. Water requirement during occupation is 571.1 KLD. During construction the water requirement is 160 KLD
2.3 Minerals (MT) No
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Lead distances of construction materials
2.5 Forests and timber (source – MT) Yes Local authorized Suppliers
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes DG sets and construction equipment shall be used during construction, which shall use mainly HSD as fuel.
2.7 Any other natural resources (use appropriate standard units) No
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The project shall provide housing facility for 785 families
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No
3.5 Any other causes No
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No
4.2 Municipal waste (domestic and or commercial wastes) Yes 2551 kg/day
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used oil: 230 l/year, Used Batteries: 10 nos. /year
4.4 Other industrial process wastes No
4.5 Surplus product No
4.6 Sewage sludge or other sludge from effluent treatment Yes 20 kg/day sludge from STP shall be reused as manure.
4.7 Construction or demolition wastes Yes 9455.6 Tons
4.8 Redundant machinery or equipment No
4.9 Contaminated soils or other materials No
4.10 Agricultural wastes No
4.11 Other solid wastes No
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emissions from DG sets, operated only during load shut down by TSTRANSCO
5.2 Emissions from production processes No
5.3 Emissions from materials handling including storage or transport No
5.4 Emissions from construction activities including plant and equipment Yes Construction equipment and DG sets which mainly use HSD, as fuel shall generate emissions
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No
5.6 Emissions from incineration of waste No
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No
5.8 Emissions from any other sources No
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction activity and the construction equipment are the main sources of noise and vibration during construction
6.2 From industrial or similar processes No
6.3 From construction or demolition Yes Due to the various construction activities, there are short term noise impacts in the immediate vicinity of the project site
6.4 From blasting or piling No
6.5 From construction or operational traffic Yes There will be an increase in the traffic density, which shall increase the noise levels of the area both during construction and occupation phases.
6.6 From lighting or cooling systems No
6.7 From any other sources No
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No
7.3 By deposition of pollutants emitted to air into the land or into water No
7.4 From any other sources No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No
8.2 From any other causes No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The area is presently developing into a prime residential and commercial locality in view of the thrust given by Government of Telangana for the development of IT and ITES services.
9.2 Lead to after-use of the site, which could have an impact on the environment No
9.3 Set a precedent for later developments Yes The surrounding areas shall develop as residential/Commercial areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes The Nehru Zoological park reserve forest located at a distance of 2.80 km and KBR National park at a distance of 3.65 km, Mrugavani National Park at a distance of 8.24 km. Gaganphad RF at a distance of 9.31 km.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No
4 Inland, coastal, marine or underground waters No
5 State, National boundaries No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No
7 Defence installations No
8 Densely populated or built-up area Yes The area is developing into a densely populated area other major developments in the vicinity etc.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Hospitals, Schools, Places of worship and community facilities are located in the project impact area.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
5 Uploaded Form-1A Annexure-Form-1A
6 Uploaded Conceptual Plan Annexure-Conceptual Plan
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameK.B. CHANDRAMOULI HUF AND OTHERS
Designationowner
Company K.B. CHANDRAMOULI HUF AND OTHERS
AddressK.B. Chandramouli HUF and Others 3rd floor, 8-2-277/B/1, Mahaveer Group, Road No 2, Banjara hills, Hyderabad- 500034
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print