APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notificationNA
Weather Consent to Establishment ObtainedNA
Upload copy of CTE NA
1.Name of the Project M/s. Akolite Synthetic Resins Unit II
Proposal No SIA/KA/IND2/43380/2019
2.Project Sector Industrial Projects - 2
3.Location of the project Plot No.412 & 413, Baikampady Industrial area, Mangalore-575011
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectKarnataka
Details of State of the project
S.no State Name District Name Tehsil Name
NIL
7.Town / VillageBaikampady Industrial area
8.Plot/Survey/Khasra No.412 & 413
9.S. No. in the schedule5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 50 TPD - formaldeyde manufacturing unit ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Thokur railway station, 0.8 km
18. Nearest airport along with distance in kms Mangalore Airport, 5 km
19. Nearest Town/City/District Headquarters along with distance in kms Mangalore , 5 km
20. Distance of the project from nearest Habitation 2 , 2 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 1080
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) N/A
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Project is located in a Notified Industrial Area developed by KIADB. There will not be any change in land cover and land use.
1.2 Clearance of existing land, vegetation and buildings? No Not Applicable, since it is an existing unit.
1.3 Creation of new land uses? No Not applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not applicable
1.5 Construction works? No The construction activity has been completed.
1.6 Demolition works? No Not applicable
1.7 Temporary sites used for construction works or housing of construction workers? No Not applicable
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes All the structures are located above ground. For methanol storage, underground storage facility is provided.
1.9 Underground works including mining or tunneling? No Not applicable
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Product detail and Manufacturing process description is given in Pre-feasibility report (PFR).
1.14 Facilities for storage of goods or materials? Yes Dedicated storage areas are provided for raw materials and finished products.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sewage: Domestic sewage is treated in septic tank and disposed through soak pit. Industrial effluents: RO rejects, rinsing of softener unit, and Waste water from back wash (40 KLD) is used in cooling tower as make up water and for gardening. Mix bed regeneration wastewater is taken to another unit for other purpose.
1.16 Facilities for long term housing of operational workers? No There will be no housing facility proposed in the project site for the workers.
1.17 New road, rail or sea traffic during construction or operation? No Existing road / transport facilities will be used for regular operation.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Existing infrastructure facilities will be utilized.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No not applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable.
1.22 Stream crossings? No Not Applicable.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Water is sourced from KIADB/open well within the project site.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not applicable
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The existing road will be utilized.
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes 15 number of employees
1.29 Introduction of alien species? No Not applicable
1.30 Loss of native species or genetic diversity? No Not applicable
1.31 Any other actions? No Not applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The industry is located in designated KIADB Industrial Area, Baikampady, Mangalore.
2.2 Water (expected source & competing users) unit: KLD Yes Total water consumption is 80 KLD, sourced from KIADB/open well. Domestic- 1.5KLD Industrial –76.5KLD Gardening -2 KLD Competing users-only captive use
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Construction is completed. The raw materials were procured locally.
2.5 Forests and timber (source – MT) No Not applicable.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total power requirement to the industry is 175 kVA sourced from MESCOM. Alternate source of Power: DG set of 320 kVA is provided as backup power supply. HSD is used as fuel.
2.7 Any other natural resources (use appropriate standard units) No Not applicable.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Chemicals are stored are below threshold limit of MSIHC Rule. Raw materials/ solvents/ chemicals used in the production process will be handled with utmost care as per MSDS.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable.
3.3 Affect the welfare of people e.g. by changing living conditions? No Not applicable
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No -
3.5 Any other causes No -
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable.
4.2 Municipal waste (domestic and or commercial wastes) Yes The total quantity of domestic wastes generated considering 15 workers is about 3.75 kg/day of which 2.25 Kg/day (60%) is organic and 1.5 Kg/day (40%) is inorganic waste, which will be segregated at source, collected in bins and disposed to local authority.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used oil from DG sets – 25 Kg/annum Collected in leak proof containers and handed over to KSPCB authorized reprocessors.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment No Not applicable
4.7 Construction or demolition wastes No Not applicable
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes DG set – 320 kVA Emissions are SO2 & NO2. Firewood is used as fuel for boiler of capacity 2TPH. Emissions are particulate matter.
5.2 Emissions from production processes No Production process takes place in closed operations.
5.3 Emissions from materials handling including storage or transport Yes Methanol and Formaldehyde are stored in dedicated tanks. Emissions from material handling are negligible
5.4 Emissions from construction activities including plant and equipment No Not applicable as the construction activity is completed.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Not applicable
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No -
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise pollution - Boiler and DG sets Acoustic enclosures are provided for the DG sets. Boiler is provided inside the factory shed. Development of greenbelt suppresses the noise level and restricts to industry premises.
6.2 From industrial or similar processes No -
6.3 From construction or demolition No Not applicable
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Transportation of raw materials and products is expected to marginally increase the traffic. Vehicles are regularly serviced. Speed of vehicles is regulated. There is no construction activity in the proposed project.
6.6 From lighting or cooling systems No Not Applicable.
6.7 From any other sources No Not Applicable.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Adequate care is taken for handling& storage of hazardous raw materials. Personnel Protective Equipment is provided for employees while handling the hazardous chemicals. MSDS for all hazardous chemicals are in place for proper handling. Spill kit will be provided to mop the spilled hazardous chemicals.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Sewage is disposed through septic tank & soak pit. RO reject is used for cooling tower make up and gardening.
7.3 By deposition of pollutants emitted to air into the land or into water Yes DG set & Boilers are provided with stacks of height 3m ARL & 30 m AGL respectively.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No not applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risk of accident due to storage of Methanol & Formaldehyde cannot be ruled out. Prevention measures are adopted to prevent any such conditions. Methanol & Formaldehyde is stored in MS tank farm with dyke wall all-round. Firefighting equipments are in place. Better housekeeping measures are adopted to avoid spillages
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The region is considered under seismic zone III category and also subjected to flash flood often during monsoon season. Natural calamities cannot be ruled out. However, all precautions are in place to meet the eventualities to reduce the damage/impact.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No -
9.2 Lead to after-use of the site, which could have an impact on the environment No -
9.3 Set a precedent for later developments No -
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes There is water logged area existing about 75 m from the industry boundary towards east. Gurpur River is at a distance of 1.3 km in North East of the industry.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters Yes Arabian sea is located at 3.2 km from the site.
5 State, National boundaries No The state boundary between Karnataka State and Kerala is at a distance of 22.4 km.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No -
7 Defence installations No -
8 Densely populated or built-up area Yes Mangalore City at a distance of 3 km.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Masjid exists at a distance of 1.27 km in North direction. Vishnu temple is in NW direction at a distance of 2.24 km. Govindadas college is at 4.5 km in NW direction.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No -
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) Yes Baikampady Industrial Area has CEPI score of 58.2 and is in Other Polluted Areas category as per CPCB’s monitored during 2018.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes The region is considered under seismic zone III category. Floods during monsoon season from Gurupur River cannot be ruled out.
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameM/S. AKOLITE SYNTHETIC RESINS UNIT II
DesignationManagingPartner
Company M/S. AKOLITE SYNTHETIC RESINS UNIT II
AddressPlot No. 412 & 413,Baikampady Industrial area, Mangalore - 575011
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print