APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notificationNA
Weather Consent to Establishment ObtainedNA
Upload copy of CTE NA
1.Name of the Project “Development and Expansion of Existing Integrated Industrial Township to Industrial Park at Kunnapattu,Panchanthiruthi and Paiyanur Village of Thiruporur taluk and Chengalpattu District, Tamil Nadu” (Land area 141.409Ha)By M/s. One hub Chennai.
Proposal No SIA/TN/NCP/54120/2020
2.Project Sector INFRA-1
3.Location of the project Kunnapattu,Panchanthiruthi and Paiyanur Village of Thiruporur taluk and Chengalpattu District, Tamil Nadu
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectTamil Nadu
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)Tamil NaduKanchipuramChengalpattu
7.Town / VillagePanchanthiruthi, Kunnappattu, and Paiyanur
8.Plot/Survey/Khasra No.S.F. No. 14, 19, etc. of Panchanthiruthi, S.F. No. 72, 78, 79, 86, 87, 91, 93, 95 etc. of Kunnappattu, and S.F.No.173/5B, 174/7, 174/5 etc of Paiyanur List of survey no and Land document is attached as Annexure-4a.
9.S. No. in the schedule7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 141.409 Ha ha.
11.
New/Expansion/ModernizationExpansion
MoEF file number(Previous EC)SIA/TN/NCP/54119/2012
Existing capacity/area etc.130.3577  ha.
Uploaded EC letterAnnexure-Uploaded EC letter
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? Yes
15.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous typeof industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries includingproposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
(a).i.  (a) i.Status of the Environmental Clearance to the ProjectEC application yet to be submitted
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Chengalpattu Railway Junction station, ≈ 17.50 km, WNW km
18. Nearest airport along with distance in kms Chennai International Airport, ≈ 35.76 Km, N km
19. Nearest Town/City/District Headquarters along with distance in kms Mahabalipuram , ≈ 4.11 km, ESE km
20. Distance of the project from nearest Habitation 0.2 , 0.2 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?Yes
Uploaded Order/PolicyAnnexure-Uploaded order/policy
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 33272
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) Yes
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The total land area for the project is 141.409Ha (Land Document is attached as an Annexure-4a). 34.91 Acres land is already allotted for Non EC category industries and all infrastructures are already developed as per 2012 EC. Now Project proponent wants to allocate remaining. 35.127 Ha will be converted from Non EC category to ‘Category B’ Industrial area and newly added 12.35 Ha as Non EC categoryas per EIA notification, 2006 and its subsequent amendments. There is no change in land use, land
1.2 Clearance of existing land, vegetation and buildings? No The land use of site is mostly barren land, partly open/degraded vegetation (Topo Sheet is attached as an Annexure-6).
1.3 Creation of new land uses? No Not applicable, since land is already allotted for industrial activities.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical investigations involving borehole and electrical resistivity tests will be carried out to ascertain the soil characteristics including strength parameters.
1.5 Construction works? Yes The project involves construction of industries as infrastructure. Other Infrastructure is already available.
1.6 Demolition works? No No demolition works are anticipated in the proposed Integrated Industrial Township
1.7 Temporary sites used for construction works or housing of construction workers? Yes Unskilled workforce from nearby villages and towns will be engaged for construction work. Temporary construction workers camps for semi skilled and skilled will be located near the project site and adequate provision of water, power, fuel, medical facilities and sanitation facilities will be ensured.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Administrative buildings and necessary infrastructure facilities are already developed. Adequate storm water drainage system along with rain water harvesting pits is already provided. Topsoil excavated during construction activities will be stored and reused for green belt development/construction work/landscape development within the project site.
1.9 Underground works including mining or tunneling? No Not applicable
1.10 Reclamation works? No Reclamation works are not envisaged
1.11 Dredging? No Dredging works are not envisaged.
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes The proposal is development and expansion of Integrated town ship to Industrial Park i.e change in concept from Schedule 8(b) to 7(c) as per EIA notification and its subsequent amendments to cater ‘B’ category industries. Layout plan showing industries proposed in IP are given in Annexure 7.
1.14 Facilities for storage of goods or materials? Yes The facilities required for storage of fuel and warehouses for storage of raw materials and finished products will be stored by the individual industries within their premises.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Liquid effluents: Existing: - At present 30KLD Mobile STP is being used for treatment process due to low manpower. Treated water is reused for gardening Proposed: - After Expansion, Sewage from individual industries will be collected through common sewer line and will be treated through CSTP of 1 MLD capacity. Treated sewage will be used for Greenbelt development and flushing within the IP. Water balance diagram along with Latest photos of CSTP is attached as an Annexure-8. Zero liquid dis
1.16 Facilities for long term housing of operational workers? No No facilities for long term housing of operational workers are planned within the Industrial Park.
1.17 New road, rail or sea traffic during construction or operation? No Construction Phase: Vehicles involved in men and material transportation of construction equipment/ machinery and material shall be brought to the site by Internal roads. Operation Phase: Internal roads are already provided within the project site for the movement of men, raw material, finished goods and wastes transportation. Rail/sea traffic during import/export of raw materials and finished goods.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Adequate internal roads are already available within project site for the movement of men and material. External connectivity to site is SH 49Aat a distance of ˜ 1.49 km towards E. The nearest broad gauge railway station to project site is at Chengalpattu Junction railway station ˜ 17.50 km, WNW.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not applicable
1.20 New or diverted transmission lines or pipelines? No There will not be diversion of power transmission lines or pipelines due to the proposed project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No One natural drain is available within the site. Road networks are provided without affecting the drain routes.
1.22 Stream crossings? Yes One natural drain is available within the site. Road networks are provided without affecting the drain routes.
1.23 Abstraction or transfers of water from ground or surface waters? No Existing Fresh water requirement for the project is sourced from CMWSSB through 100 MLD Nemili Desalination Plant vide G.O. (Ms) No. 102 Dated: 05.07.2013 (G.O is attached as an Annexure-10) and same will be utilized for proposed IP.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Grading within the project site will be planned and implemented in such a way that there will be no impact in runoff. The drain within the site is well maintained there is no change in the drainage.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction Phase: - Movement of construction material including cement, aggregates, rock, sand, steel etc., Movement of construction workers by vans/buses. Operation Phase: - Transportation of raw materials/finished goods/waste through road/rail/sea transport. Movement of work force from the nearby habitations to IP.
1.26 Long-term dismantling or decommissioning or restoration works? No No long term dismantling or decommissioning or restoration works are envisaged.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No No ongoing activity is envisaged.
1.28 Influx of people to an area in either temporarily or permanently? Yes No Man power Existing Proposed Total 1 Workers 12000 9733 21733
1.29 Introduction of alien species? No No introduction of alien species envisaged
1.30 Loss of native species or genetic diversity? No No loss of native species envisaged
1.31 Any other actions? No None
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Not applicable, since project site is already having EC. Now proponent wants to go for expansion and change in concept (Integrated Township to Industrial Park).
2.2 Water (expected source & competing users) unit: KLD Yes Construction phase Water requirement will be150 KLD (for construction purposes). Source:Private water suppliers. Operation phase Total water requirement – 5129 KLD and Fresh water requirement is 2098.5 KLD which will be sourced from CMWSSB through 100 MLD Nemmili Desalination Plant vide G.O. (Ms) No. 102 Dated: 05.07.2013.
2.3 Minerals (MT) No Not required
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Soil, Sand, gravel and stone aggregates will be procured from nearby sources. Topsoil excavated during construction activities will be stored and used for construction work/landscape development/Greenbelt development within the project site.
2.5 Forests and timber (source – MT) No No timber is required
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes S. No Details Capacity Source Existing (As per EC) After Expansion 1 Power 107 MW No change TANGEDCO 2 Back up 2x1250 kVA No change DG Sets 3 HSD 0.58 TPD No change Local Supplier
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Fuel and raw materials required for various industries will be stored within the individual industries premises. Details on the same will be given by individual industries while applying for EC/ CTE as applicable.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes • Improve living conditions of local people • Direct and indirect employment during construction and operation phases of the project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. Yes Buffer Zone will have Vulnerable groups. However, Suitable mitigation pollution control measures and safety measures will be implemented by individual industries.
3.5 Any other causes No None
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No spoil, Overburden or mine wastes is envisaged.
4.2 Municipal waste (domestic and or commercial wastes) Yes Solid waste will be disposed by individual industries as per the Norms. Details of solid waste generation and disposal given below: Solid waste Actual (TPD) Total After Expansion(TPD) Disposal methods MSW 2.0 6.3 Individual industries will segregate the wastes as Organic and inorganic. Organic wastes will be composted by OWC and used as manure by individual industries. Inorganic wastes will be sold to TNPCB authorized Recyclers Non HW 57.4 62.5 Sold to TNPCB authorized Recyclers However, One
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Existing: - Existing industries are sending the HW to TSDF as per the norms Proposed: - Individual Industries will have their own Hazardous Waste Storage area within their units as per the norms and One Hub (Chennai) Private Limited will ensure that hazardous wastes generated by individual industries are properly stored and disposed as per Hazardous wastes (Management, Handling and Transboundary Movement) Rule 2016. Hazardous waste generated from individual industries will be sent to nearby a
4.4 Other industrial process wastes Yes Other industrial waste shall be disposed as per HWM rules by individual industries However, OneHub (Chennai) Private Limited will monitor and ensure strict compliance on continuous basis.
4.5 Surplus product Yes Individual industries will address.
4.6 Sewage sludge or other sludge from effluent treatment Yes Existing:- 914 KLD sewage is being generated from the existing project. At present 30KLD Mobile STP is being used for treatment process due to low manpower. Proposed: - After expansion, Sewage from the individual industries will be collected through common sewer line and will be treated in 1MLD CSTP. STP sludge will be used as manure for greenbelt development. Effluent will be treated by individual industries and ZLD will be implemented and maintained. However, OneHub (Chennai) Private Lim
4.7 Construction or demolition wastes Yes During construction phase, construction debris may be generated which will be segregated and whatever is re-saleable will be sold to buyers and rest of the waste will be used for filling up of low lying areas and development of internal roads and boundary walls. Excess quantity if any will be disposed by contractor as per C&D Waste Management rules 2016. However, OneHub (Chennai) Private Limited will monitor and ensure strict compliance on continuous basis.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not envisaged during normal operation.(In cases of Accidental spills, soil will be recovered and appropriate remedial measures will be carried out by Individual industries.) OneHub (Chennai) Private Limited will monitor and ensure strict compliance.
4.10 Agricultural wastes No No agricultural wastes are envisaged
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Construction Phase: - From operation of diesel engine driven construction equipment and movement of construction vehicles like lorries, trucks, dumpers, roller, excavator, HVM, etc. carrying men and materials would result in air pollution. Emission from above source will be mitigated by sprinkling of water on dust, emission certificate for construction vehicles etc. Operation phase: - (Utility Emission for existing and proposed) Sl.No Backup Existing Proposed Stack No Height m APC 1 DG set
5.2 Emissions from production processes Yes Individual industries upon establishment will give the details in EC/CTE as applicable, with the Air Pollution Control Measures.
5.3 Emissions from materials handling including storage or transport Yes Potential fugitive emissions are expected during material handling and storage, suitable control measures such as greenbelt development, dust suppression system will be adopted.
5.4 Emissions from construction activities including plant and equipment Yes Temporary in nature which may originate during construction of buildings or roads, this will be taken care by sprinkling of water
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Construction Phase: Dust generated due to handling of construction material will be controlled by sprinkling of water. Domestic sewage will be treated through mobile STP and used for greenbelt development. Operation Phase: Sewage and Effluent Existing: At present 30KLD Mobile STP is being used for treatment process due to low manpower. Treated water is reused for gardening. Effluent is treated by individual industries through ZLD and treated effluent is used for utilities. Proposed: Afte
5.6 Emissions from incineration of waste No No incinerator is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No waste will be burnt in open air.
5.8 Emissions from any other sources Yes Will be identified and addressed if any
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise Construction Phase –70-85 dB (A) very near to the source such as DG set or heavy equipment, etc. and PPEs will be provided to the workers. The typical sources are: • Vehicle movement • Construction equipment • Construction activities All major noisegenerating activities will be scheduled during daytime. However, the effect of the noise is mostly localized and temporary, i.e will cease on completion of construction activity. All DG sets will be provided with acoustic enclosures. Opera
6.2 From industrial or similar processes Yes From the industrial areas/utilities sections etc. Noise generation at source shall be complied with CPCB/MOEF prescribed standards.
6.3 From construction or demolition Yes Excavation, drilling and welding will be carried out during construction phase which will be temporary in nature. Measures will be taken to ensure that noise from construction activity is limited to site.
6.4 From blasting or piling No No blasting or piling is proposed for Integrated Industrial park. However individual industries may go for pilling as per requirement. In such case, Personal Protective Equipments will be provided to the work force.
6.5 From construction or operational traffic Yes During the construction activities, utmost care will be taken to control the noise levels within the standards. While operation traffic will contribute some noise level, mitigation measures like traffic management will be followed.
6.6 From lighting or cooling systems Yes DG sets and Cooling tower are the major noise generation source for lighting and cooling systems. However, it will be mitigated by proper noise and vibration arrestor and also personal protective equipments (PPE) will be given to workers placed in high noise zone.
6.7 From any other sources No External source viz road traffic, Air traffic etc.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Individual industries will be responsible for handling hazardous materials as per the MSIHC rules. However, In cases of Accidental spills; Spill contingency plan will be adopted to prevent the release of pollutant into the environment and managed as per the guidelines of MSIHC rules. PESO license for the storage of Petroleum Class B in bulk is attached as an Annexure-11. However, OneHub (Chennai) Private Limited will monitor and ensure strict compliance on continuous basis.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage from Individual industries will be collected through common sewer line and treated in CSTP and treated sewage will be used for Flushing and greenbelt development. Individual industries will implement Zero Liquid Discharge (ZLD) However; OneHub (Chennai) Private Limited will monitor and ensure strict compliance on continuous basis.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Air: Stack emissions, Vehicular emissions, Fugitive emissions from stack yards, and spillage at handling areas. Appropriate technological mitigation measures will be followed to avoid the deposition of pollutants. Water: Sewag ewill be treated through CSTP and will not be let outside. Individual industries will treat the effluent to adhere to Zero Liquid Discharge. Land: Wastes and wastewater generated will not be discharged onto
7.4 From any other sources No Other sources of pollutants if any generated will be studied and controlled by individual industries. However, OneHub (Chennai) Private Limited will monitor and ensure strict compliance on continuous basis.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not envisaged in view of proposed pollution preventive and control measures to comply with the prescribed statutory norms. However Continuous studies will be done by OneHub (Chennai) Private Limited to evaluate on the long run of possible pollutants buildup etc.,
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Risks associated with handling, storage of hazardous materials at IP level will be covered in the EIA study and accordingly mitigation measures will be suggested in the EIA report. Industry specific risk assessment study shall be carried out by individual units coming up in the Integrated Industrial Township.
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Earthquake: The project site falls under seismic zone-III (Moderate active) according to the Indian Standard Seismic Zoning Map. Therefore, suitable earthquake design will be followed in structural and basic civil design. Flood: There had been Tsunami and associated flooding. Therefore, suitable flood prevention measures will be followed in basic civil design. Landslide May not occur since it is a plain terrain. Cloudburst: It has not occurred in the project study area.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes There will be consequential development and its associated environmental impact will be studied in proposed EIA report.
9.2 Lead to after-use of the site, which could have an impact on the environment Yes The proposed project is going to be in operation for long term (99 Years), however decommissioning and dismantling impacts will be studied in proposed EIA report.
9.3 Set a precedent for later developments Yes The region has potential for industrial investments.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes There will be Cumulative effects and it will be addressed in the EIA study.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes S. No Details of Monuments ? Dist Dir 1 Arjuna’s Penance 4.50km SE 2 Bheema/ Bhima's Ratha 4.89km SE 3 Arjuna Ratha 4.89km SE 4 Dharmaraja ‘S Ratha 4.89km SE 5 Dharmaraja Rock Cut Throne 4.50km SE 6 Draupadi’s Bath 4.40km SE 7 Draupathi Ratha 4.89km SE 8 Olakkanesvara Temple 4.58km SE 9 Krishna’s Butter Ball 4.40km ESE 10 Krishna Mandapam 4.53km SE 11 Mahishamardini Rock Cut Mandapa 4.58km SE 12 Mahishasura Rock / Mahishasura rock standing in the sea north of Sh
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Details of sensitive place (RF/Water bodies/others) ? Dist Dir Kunnapattu R inside the site Kattur RF 1.63km NW Buckingham Canal 3.53km ESE Bay of Bengal 4.73km ESE Alattur RF 3.72km N Nemmeli RF 9.34km WNW Oragadam RF 6.66km WSW Tirukkalukkunram RF 9.84km WSW Tandalam RF 5.35km N Illalur RF 6.68km N Madayattur RF 5.38km N Anjur RF 8.90km NW Navalur RF 12.32km SW Salur RF 13.59km WSW Kaluvaliar R 11.16km SSW Manjal Madu 12.15km NNE Kalangal Maduvu
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Details of sensitive place (RF/Water bodies/others) ? Dist Dir Kunnapattu R inside the site Kattur RF 1.63km NW Buckingham Canal 3.53km ESE Bay of Bengal 4.73km ESE Alattur RF 3.72km N Nemmeli RF 9.34km WNW Oragadam RF 6.66km WSW Tirukkalukkunram RF 9.84km WSW Tandalam RF 5.35km N Illalur RF 6.68km N Madayattur RF 5.38km N Anjur RF 8.90km NW Navalur RF 12.32km SW Salur RF 13.59km WSW Kaluvaliar R 11.16km SSW Manjal Madu 12.15km NNE Kalangal Maduvu
4 Inland, coastal, marine or underground waters Yes Details of Water bodies ? Dist Dir Kunnapattu R inside the site Buckingham Canal 3.53km ESE Bay of Bengal 4.73km ESE Kaluvaliar R 11.16km SSW Manjal Madu 12.15km NNE Kalangal Maduvu 13.33km NNE
5 State, National boundaries No Nil
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes SH 49A˜ 1.49Km E NH 32˜18.64 Km, WNW
7 Defence installations No nil
8 Densely populated or built-up area Yes Area ˜ Dist (Km) Dire Popula Panjantirutti Colony 0.10km E - Dakshinavarti 0.03km N - Panjantirutti 0.34km N - Kunnapattu 0.2km W - Paiyanur 1.08km E -
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes S. No Name ? Dist Dir School 1 Government High School Karunguzhipallam 1.65km E 2 Government Higher Secondary School Poonjeri 3.35km SE 3 Government Middle School Mahabalipuram 4.54km ESE 4 Government Elementary School Manampathy 2.64km WNW 5 Mamampathy government higher secondary school 2.84km WNW 6 Mullipakkam Government School 6.59km WNW 7 Government school siruthavoor 2.92km N 8 Govt School madayathur 5.68km N 9 Govt School Thandalam 7.27km NNE 10 Government Mid
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Details of sensitive place (RF/Water bodies/others) ? Dist Dir Kunnapattu R inside the site Kattur RF 1.63km NW Buckingham Canal 3.53km ESE Bay of Bengal 4.73km ESE Alattur RF 3.72km N Nemmeli RF 9.34km WNW Oragadam RF 6.66km WSW Tirukkalukkunram RF 9.84km WSW Tandalam RF 5.35km N Illalur RF 6.68km N Madayattur RF 5.38km N Anjur RF 8.90km NW Navalur RF 12.32km SW Salur RF 13.59km WSW Kaluvaliar R 11.16km SSW Manjal Madu 12.15km NNE Kalangal Maduvu
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Nil within 15 Km radius
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Earthquake: The project site falls under seismic zone-III (Moderate active) according to the Indian Standard Seismic Zoning Map. Therefore, suitable earthquake design will be followed in structural and basic civil design. Flood: There had been associated flooding. Therefore, suitable flood prevention measures will be followed in basiccivil design. Landslide May not occur since it is a plain terrain.
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
ADDITIONAL MULTIPLE ENTERIES
Sr. no. Remarks Uploaded Additional Attachments
1 Reply for EDS raised on 14.10.2020 Annexure-Additional Attachments
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameONEHUB CHENNAI
DesignationManager
Company ONEHUB CHENNAI
AddressPlot no.38, Kunnapattu Village, Manamthy Post, Thiruporur T.K
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)01/09/2020Copy of the latest valid consent order obtained from TNPCB to be furnished. Certified compliance report of the CTO/RCO to be furnished' The unit shall furnish the list of industries housed within the premises with details of plot No., category & classification, ETP details with mode of disposal of treated effluent, TNPCB consent validity' etc STP comPonents with caPacitY. Copy of Town Survey land register for the S.F.Nos of the existing and proposed project site to be fumished. Photograph of Green belt area with GPS coordinates'EDS Letter
(2.)14/09/2020The corrections have been made as per the instruction received.
(3.)14/09/2020The corrections have been made as per the instruction received.
(4.)21/10/20201.A detailed report on the nature of raw materials (plant origin/ synthetic chemicals) and unit processes/unit operations involved in the manufacturing units housed in M/s. One Hub, Chennai so as to ensure no violation cases appraised as normal cases. Certified compliance report for the ECs and CTO/RCO from TNPCB. Common STP components with capacity. Complete survey numbers of the existing plant and expansion plant shall be tabled separately (without etc..) and furnish registered land documents for Expansion survey numbers. GPS coordinates of the Green belt area with.EDS Letter
(5.)20/11/2020The corrections have been made as per the instruction received.
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print