APPENDIX I
(See Paragraph-6)
CATEGORY - B
Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I)Basic Informations
S.No.Item Details
Whether proposal involved violation of EIA notification No
Weather Consent to Establishment Obtained NA
Upload copy of CTE NA
1.Name of the Project Grant of Environment Clearance for Construction of Hospital, IT Buildings, Utilities, MLCP & Miscellaneous structures in IT Zone at Plot No. 5, 6 and R-801/1, TTC MIDC, Thane-Belapur Road, Ghansoli, Navi Mumbai by Reliance Corporate IT Park Ltd.
Proposal No SIA/MH/MIS/78496/2022
2.Project Sector INFRA-2
3.Location of the project TTC MIDC , Navi Mumbai
4.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
5.Brief summary of projectAnnexure-Brief summary of project
6.State of the projectMaharashtra
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)MaharashtraThaneThane
(2.)Jammu and KashmirPoonchPoonch
7.Town / VillageGhansoli
8.Plot/Survey/Khasra No.Plot No. 5, 6 and R-801/1, TTC MIDC
9.S. No. in the schedule8(b) Townships and Area Development projects.
10. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Plot Area - 17,01,320.20 sq. m & BUA - 6,74,690.4 Sq. m. (FSI Area 6,23,787 sq.m + Non FSI area 50,903.4 sq.m) (Out of maximum developable area (FSI Area of 635,293.02 Sq. m) ha.
11.
New/Expansion/ModernizationNew
12. Category of project B
13. Does it attract the general condition? If yes, please specify No
15. Does it attract the specific condition? No
16.Is there any litigation pending against the project?No
17. Nearest railway station along with distance in kms. Rabale Railway station, 0.116 km
18. Nearest airport along with distance in kms Chhatrapati Shivaji Airport, 15.50 km
19. Nearest Town/City/District Headquarters along with distance in kms Navi Mumbai , 0.00 km
20. Distance of the project from nearest Habitation 0.39 , 0.39 km
21.
Details of alternative sites examined shown on a toposheetNo
22.
Whether part of interlinked projects?No
23.
Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980?No
24.
Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972?No
25.Whether the proposal involves approval/clearance under the C.R.Z notification,2011?No
26.
Whether there is any Government Order/Policy relevent/relating to the site?No
27.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
28. Project Cost(in Lac.) 303829
30. Whether the proposed project/activity located in notified Industrial area(Yes/No) Yes
Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed Buildings will result in increased intensity of land use due to additional population ingress.
1.2 Clearance of existing land, vegetation and buildings? Yes Few of the Existing structures/buildings will be demolished.
1.3 Creation of new land uses? No Not Applicable
1.4 Pre-construction investigations e.g. bore houses, soil testing? No The soil profile observed as per the geotechnical assessment: 1) LAYER - 1- Back fill THICKNESS - From ground surface, 0.5 to 3.0m 2) LAYER - 2-Black Silty Clay THICKNESS - From ground surface, 0.5 to 3.0m 3) LAYER - 3-Brown Completely Weathered Rock THICKNESS - 1.0 to 4.1 m
1.5 Construction works? Yes Construction of Hospital Building, IT buildings, utility buildings, Multi-Level Car Parks & associated miscellaneous buildings (Convenience shopping, Coffee shops, Hotels, Emergency staff quarters, Warehouses, Recreation facilities etc.) is proposed.
1.6 Demolition works? Yes Existing buildings/ structures will be demolished.
1.7 Temporary sites used for construction works or housing of construction workers? Yes There will be temporary facility for the construction workers on site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Structures to be built will be varying in height from ground + 18 floors. No cutting/filling required as site is level and well developed Earthwork includes foundation, excavation etc.
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? No Not Applicable
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sewage Treatment Plant with capacity of 3000 cmd is proposed.
1.16 Facilities for long term housing of operational workers? No Not Applicable
1.17 New road, rail or sea traffic during construction or operation? Yes Construction phase- Temporary increase in traffic due to transport of construction workers and materials. Operation phase- Increased vehicular traffic due to daily commuting of workforce into the IT park.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Site is well connected to National Highway and Rail network
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No Not Applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Not Applicable
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Site has well developed drainage system, which will be retained in the project.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes 1) Construction materials will be transported through lorries to the site. 2) Workforce employed during operation phase will use employee run buses / public transport systems/ own vehicles
1.26 Long-term dismantling or decommissioning or restoration works? No Not applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes 1) There will be a temporary influx of workers during construction phase. 2) During operation phase, there will be influx of employees of IT buildings and hospital staff.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The site is a part of MIDC.
2.2 Water (expected source & competing users) unit: KLD Yes Construction Phase: Water required for the construction phase will be sourced from MIDC Water usage during construction phase – 300 cmd Operation Phase: Source: MIDC water supply Quantity : 3693 cmd (Fresh + Recycled) Sourcing: Total Fresh water (though MIDC water supply): 1191 cmd Total STP treated water: 2502 cmd (for flushing: 954 cmd + for Cooling: 1485 cmd + Gardening 23 cmd)
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Raw material requirement for construction: Steel - 164,693.15 MT Cement - 668,234.70 MT Sand - 1,604,467 MT Metal - 2,413,573 MT Binding wire - 1,647 MT Bricks - 69,964 MT Tiles/granite - 76,406 MT Paint - 175 MT Gypsum - 20,157 MT Aluminium/wood/glass - 30,181 MT Total - 50,49,498 MT
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes During the operational phase, the electricity for the project will be sourced from Maharashtra State Electricity Distribution Company Ltd (MSEDCL) Construction phase: 5 MW Operation phase: 32 MVA (contract demand 45 MVA)
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes HSD to be used for proposed DG sets (32 MVA) to be used in emergencies
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The Hospital will help meet demand for Modern Health care facilities in Navi Mumbai region. Proposed IT activity will create direct and indirect employment/ business opportunities for local population, lead to income generation and will thus have a positive impact in improving living conditions.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes During construction phase, total waste generated will be as given below: Steel - 4,940.79 MT Cement - 20,047.04 MT Sand - 48,134.01 MT Metal - 72,407.19 MT Binding wire - 49.41 MT Bricks - 3,498.20 MT Tiles/granite - 3,820.30 MT Paint - 3.50 MT Gypsum - 1,007.85 MT Aluminum/wood/ glass - 603.62 MT Total - 154,511.92 MT Total solid waste generated will be upto 7.0 MTPD (i.e. 3.5 MTPD biodegradable waste + 3.5 MTPD non-biodegradable) STP Sludge - 100 Kg/day & Gardening Waste
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Hazardous Waste -14 KLPA i.e. Used oil -will be disposed off to authorized recycler. E-wastes such as old computers, electronic equipment and hazardous waste (batteries, chemical containers, etc.) will be separately stored and disposed off through MPCB authorized recyclers. E- Waste: 10 MTPA Biomedical Waste Generation from Hospital: 40 Kg/day (Incinerable – 20 kg/day + Autoclavable – 15 kg/day + Glassware & Sharps and Needles – 5 Kg/day) Battery Waste Generation: As per Generatio
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Due to use of Anaerobic treatment and the new CAACO technology, amount of sludge generated will be very small and will be composted.
4.7 Construction or demolition wastes Yes Construction waste / demolition waste generated will be handed over to authorized party for disposal.
4.8 Redundant machinery or equipment Yes Construction Phase: Not Applicable Operation phase: Electronic wastes generated occasionally such as old computers and electronic equipment.
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes Yes Organic waste from landscaping, lawn mowing, pruning of gardens (to be managed by composting). (quantity - Gardening Waste – 3.4 MT/day )
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Some amount of air pollution will be involved during the construction phase. DG sets will be used only in case of emergency.
5.2 Emissions from production processes No Not Applicable
5.3 Emissions from materials handling including storage or transport Yes Fugitive dusts will be generated from the construction materials. Increase in SPM/RSPM levels during construction phase. However, this will be of short-term nature.
5.4 Emissions from construction activities including plant and equipment Yes Marginal increase in SPM/RSPM levels during construction phase, which will be temporary.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Marginal increase in SPM/RSPM levels during construction phase, which will be temporary.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Construction debris will be used for making internal roads or will be disposed off to authorized vendors.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Construction phase: Noise will be generated by machinery used for construction, viz. cranes, excavators, dumpers, earth compactor, concrete mixer, bar cutting machine. The noise levels may affect the persons working around. Operation phase: Noise will be generated as a result of (i) vehicular traffic during weekdays, (ii) DG sets (to be used only in case of emergency) and (iii) chillers. Traffic noise will be limited as the MLCP on the project site which will be located at a distance fro
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition Yes The noise generation during the construction phase will be mainly due to construction equipment. The increase in the vehicular traffic also will add to the noise pollution.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Due to transport of construction materials by trucks, some noise will be generated. This will be temporary in nature. During operation phase, traffic noise will be generated during peak hours only.
6.6 From lighting or cooling systems No Noise and vibration generated by DG sets, cooling towers, AHUs and Chillers will be controlled by adopting appropriate measures. Noise level will be controlled and eliminated by acoustical treatments. Vibration will be eliminated with the help of mounts, springs, suspensions etc. The DG sets will have highly advanced technology incorporated with features to effectively minimize the level of noise generated at the source itself.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not Applicable
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Sewage generated will be treated in the sewage treatment plant. Treated sewage water will be used for flushing, gardening, and cooling.
7.3 By deposition of pollutants emitted to air into the land or into water No Landscaping and tree plantation are a part of the project plan, will help prevent and reduce air pollution.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No Not applicable
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Infrastructure that accompanies the proposed development include: • Enhancement of STPs for treatment and recycling of wastewater generated on site • Enhancement of Composting of biodegradable waste & reuse of manure generated • Energy efficient electrical and HVAC installations for conserving electricity. • Tree plantation / landscaping • Rainwater harvesting • Internal roads • Convenience shopping • Adequate parking spaces • Solar energy
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Applicable
9.3 Set a precedent for later developments Yes The project proposal includes a Hospital which will bring modern medical facilities in the area. This will have a positive effect on Navi Mumbai
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Being located in Navi Mumbai, with other IT parks in vicinity, the proposed project will supplement the growth of this industry in the city and will provide direct and indirect employment opportunities to local educated youth.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not Applicable
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Sanjay Gandhi National Park about 6.25 km towards east of project site. Vikhroli mangroves, about 7 km south-west of project site. Ghansoli mangroves, 2.5 km west of project site. Thane Creek Flamingo Sanctuary – 2.94 km (W) & distance to ESZ boundary 0.95 km (NW)
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Ghansoli mangroves, 2.5 km west of project site. Vikhroli mangroves, about 7 km south-west of project site, used by migratory birds as a refuge. Thane Creek Flamingo Sanctuary – 2.94 km (W) & distance to ESZ boundary 0.95 km (NW)
4 Inland, coastal, marine or underground waters Yes Thane creek 2.94 km to west of site.
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Thane-Belapur road along the western border of the site. Sion-Panvel road connecting Mumbai to NH4 is about 7 km south of project site.
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes The site is located in MIDC-TTC, adjacent to Navi Mumbai. Mumbai lies 4.5 km to West, Thane 6 km to North.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Tilak International School -620 mt to South West Divine Hospital - 650 mt to West Ghansoli Police station - 765 mt to Southwest
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not Applicable
(IV) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5 Uploaded Form-1A Annexure-Form-1A
6 Uploaded Conceptual Plan Annexure-Conceptual Plan
(V) Undertaking
The aforesaid application and documents furnished here with are true to my knowledge
V.(i)
NameRELIANCE CORPORATE IT PARK LIMITED
DesignationAssistant Vice President
Company RELIANCE CORPORATE IT PARK LIMITED
AddressReliance Corporate IT Park Limited, Plot No. 5, 6 and R-801/1, TTC MIDC, Thane - Belapur Road, Ghansoli, Navi Mumbai
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
           Transferred Details(Category A To B)
S. No.Category A(Proposal No)Category B(Proposal No)Transferred DateReasonLetter
NO Record
Print