| APPENDIX I |  | (See Paragraph-6) |  | CATEGORY - B |  |    |  | Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. |  | (I)Basic Informations |    |   | Whether proposal involved violation of EIA notification |  No |    | Weather Consent to Establishment Obtained |  NA |    | Upload copy of CTE |  NA |   
  |  | 1. | Name of the Project |  Proposed residential and commercial project at CTS No. 67, 67A, 67/1 to 67/47, Village Vikhroli, Taluka: Kurla, District: Mumbai Suburban, State: Maharashtra, India.  |    | Proposal No |  SIA/MH/MIS/75091/2022  |   
  |   |  | 3. | Location of the project |  Vikhroli  |   
  |     |  |   |   | 6. | State of the project | Maharashtra  |      |  | Details of State of the project | 
|---|
 | S.no |  State Name   |  District Name   |  Tehsil Name   | 
|---|
 | (1.) | Maharashtra | Mumbai (Suburban) | Kurla |      |  |   |   | 8. | Plot/Survey/Khasra No. | CTS No. 67, 67A, 67/1 to 67/47  |      |  | 9. | S. No. in the schedule | 8(b) Townships and Area Development projects.
  |   
  |   | 10.  | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled  | 368932.55 ha.  |     |     | 11. | | New/Expansion/Modernization | New |      |       |      | 12.  |  Category of project  | B  |      |    | 13.  |  Does it attract the general condition? If yes, please specify  |  No  |      |    | 15.  |  Does it attract the specific condition?  |  No |      |   | 16. | Is there any litigation pending against the project? | No  |      |        | 17.  |  Nearest railway station along with distance in kms.  |  Vikhroli Railway Station, 1.00 km  |      |     | 18.  |  Nearest airport along with distance in kms  |  Chhatrapati Shivaji Maharaj International Airport, 7.00 km |      |     | 19.  |  Nearest Town/City/District Headquarters along with distance in kms  |  Mumbai Metropolitan Region , 0.00 km  |      |     | 20.  |  Distance of the project from nearest Habitation  |  0.00 , 0.00 km  |      |     | 21. | | Details of alternative sites examined shown on a toposheet | No |      |   
  |     | 22. | | Whether part of interlinked projects? | No |      |       |      | 23. | | Whether the proposal involves approval/clearance under the Forest (Conservation)Act,1980? | No |      |       |      | 24. | | Whether the proposal involves approval/clearance under the wildlife (Protection)Act,1972? | No |      |       |   | 25. | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No |  
  |     | 26. | | Whether there is any Government Order/Policy relevent/relating to the site? | No |      |   
  |     | 27. | | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No |      |   
  |    | 28. |  Project Cost(in Lac.)  |  49800 |   
  |  
  | 30. |  Whether the proposed project/activity located in notified Industrial area(Yes/No)  |  No |   
  |      | 1  |  Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)  |                                                              | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details there of (with approximate quantities/rates, wherever possible) with source    of information data  |      | 1.1  |  Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)  |  Yes         |  Land use:
•	Project site is in Industrial zone as per DP remarks received from MCGM. Copy DP remarks are attached as Enclosure 2.
•	Part of land has obtained I to R permission. I to R of remaining plot shall be obtained. Application submitted.  
Land cover:
•	There are closed down rented structures which were running different types of small scale industries/ factories/ godowns, etc. 
•	Existing structures shall be demolished as per permission received from MCGM. 
•	Now project site will  |      | 1.2  |  Clearance of existing land, vegetation and buildings?  |  Yes         |  There are closed down rented structures which were running different types of small scale industries/ factories/godowns, etc. 
Existing structures shall be demolished as per permission received from MCGM.  |      | 1.3  |  Creation of new land uses?  |  Yes         |  Project site is in Industrial zone as per DP remarks received from MCGM. 
Part of land has obtained I to R permission. I to R of remaining plot shall be obtained. Application submitted.  
Now project site will be developed as residential and commercial development under Reg. 33(11) of DCPR 2034.  |      | 1.4  |  Pre-construction investigations e.g. bore houses, soil testing?  |  Yes         |  Geotechnical investigation has been carried out. Extract of soil report is attached as Enclosure 3.  |      | 1.5  |  Construction works?  |  Yes         |  Residential & Commercial Development under Reg. 33(11) of DCPR 2034.  |      | 1.6  |  Demolition works?  |  Yes         |  There are closed down rented structures which were running different types of small scale industries/ factories/godowns, etc. 
Existing structures shall be demolished as per permission received from MCGM.  |      | 1.7  |  Temporary sites used for construction works or housing of construction workers?  |  No          |  Temporary labour camp on site with facilities like drinking water, toilets etc. shall be provided  |      | 1.8  |  Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations  |  Yes         |  •	Demolition debris: Partly reuse on site and disposal of remaining waste to authorized landfill site as per permission from MCGM.
•	Excavation material shall be partly reused on site for backfilling and levelling and remaining shall be disposed to authorized landfill site as per permission from MCGM.
•	Construction waste shall be Partly recycle/ reuse on site and disposal of remaining waste to authorized landfill site with permission of MCGM shall be disposed to authorized landfill site as pe  |      | 1.9  |  Underground works including mining or tunneling?  |  No          |  Construction of basements only.  |      | 1.10  |  Reclamation works?  |  No          |  --  |      | 1.12  |  Offshore structures?  |  No          |  --  |      | 1.13  |  Production and manufacturing processes?  |  No          |  --  |      | 1.14  |  Facilities for storage of goods or materials?  |  Yes         |  During Construction Phase:
There will be provision of temporary storage facilities on site to store the construction material.  |      | 1.15  |  Facilities for treatment or disposal of solid waste or liquid effluents?  |  Yes         |  During Operation Phase: 
•	Sewage Treatment Plant (STP) for treatment of sewage
•	Segregation of solid waste into non-biodegradable and biodegradable garbage
•	Treatment of biodegradable waste in Organic Waste Converter 
•	Non-biodegradable waste: To authorized recyclers  
•	Dried sludge from STP: As manure 
E Waste: 
•	Though generation of E- waste is from both residential and commercial building but it is difficult to quantify E-waste from residential building. 
•	Quantification of E  |      | 1.16  |  Facilities for long term housing of operational workers?  |  Yes         |  Provision of Cabin for watchmen/ gardener etc.  |      | 1.17  |  New road, rail or sea traffic during construction or operation?  |  No          |  --  |      | 1.18  |  New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc?  |  No          |  --  |      | 1.19  |  Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?  |  No          |  --  |      | 1.20  |  New or diverted transmission lines or pipelines?  |  No          |  --  |      | 1.21  |  Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?  |  No          |  --  |      | 1.22  |  Stream crossings?  |  No          |  --  |      | 1.23  |  Abstraction or transfers of water from ground or surface waters?  |  No          |  --  |      | 1.24  |  Changes in water bodies or the land surface affecting drainage or run-off?  |  Yes         |  By considering the runoff prior to development and runoff after development there will be some increment in runoff of storm water
Assessment of storm water disposal system of proposed project site considering site and adjoining areas shall be submitted in the EIA report.  |      | 1.25  |  Transport of personnel or materials for construction, operation or decommissioning?  |  Yes         |  Transport of construction materials. 
Precautions shall be taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours.  |      | 1.26  |  Long-term dismantling or decommissioning or restoration works?  |  No          |  --  |      | 1.27  |  Ongoing activity during decommissioning which could have an impact on the environment?  |  No          |  --  |      | 1.28  |  Influx of people to an area in either temporarily or permanently?  |  Yes         |  Details shall be submitted in the EIA report.  |      | 1.29  |  Introduction of alien species?  |  No          |  --  |      | 1.30  |  Loss of native species or genetic diversity?  |  No          |  --  |      | 1.31  |  Any other actions?  |  No          |  --  |      |                                                            | 2  |  Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):  |                                                              | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 2.1  |  Land especially undeveloped or agricultural land (ha)  |  No          |  Land is situated within limits of M.C.G.M. fully developed area with all basic infrastructure available  |      | 2.2  |  Water (expected source & competing users) unit: KLD  |  Yes         |  During Construction Phase -
Details shall be submitted in the EIA report.
During Operational Phase –
Details shall be submitted in the EIA report.  |      | 2.4  |  Construction material – stone, aggregates, sand / soil (expected source – MT)  |  Yes         |  Quantity: As per requirement
Sources: Material required for construction activities shall be sourced from authorized/ approved vendors/ open market.  |      | 2.5  |  Forests and timber (source – MT)  |  Yes         |  Timber required for doors shall be sourced from local suppliers.  |      | 2.6  |  Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW)  |  Yes         |  Details shall be submitted in EIA report.  |      | 2.7  |  Any other natural resources (use appropriate standard units)  |  No          |  --  |      |  
  | 3  |  Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health  |                                                              | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 3.1  |  Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies  |  No                    |  --  |      | 3.2  |  Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)  |  No          |  --  |      | 3.3  |  Affect the welfare of people e.g. by changing living conditions?  |  No          |  --  |      | 3.4  |  Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.  |  No          |  --  |      | 3.5  |  Any other causes  |  No          |  --  |      |  
  | 4  |  Production of solid wastes during construction or operation or decommissioning (MT/month)  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 4.1  |  Spoil, overburden or mine wastes  |  No          |  --  |      | 4.2  |  Municipal waste (domestic and or commercial wastes)  |  Yes         |  During Construction Phase: 
Details shall be submitted in the EIA report.
During Operation phase: 
Details shall be submitted in the EIA report.  |      | 4.3  |  Hazardous wastes (as per Hazardous Waste Management Rules)  |  No          |  Waste oil generated (if any) from DG sets shall be stored at duly marked separate locations and will be sold to the authorized recyclers.  |      | 4.4  |  Other industrial process wastes  |  No          |  --  |      | 4.5  |  Surplus product  |  No          |  --  |      | 4.6  |  Sewage sludge or other sludge from effluent treatment  |  No          |  For Operation Phase: 
Use of dried sludge from STP as manure for plants within the premises.  |      | 4.7  |  Construction or demolition wastes  |  Yes         |  •	Demolition debris: Partly reuse on site and disposal of remaining waste to authorized landfill site as per permission from MCGM.
•	Excavation material shall be partly reused on site for backfilling and levelling and remaining shall be disposed to authorized landfill site as per permission from MCGM.
•	Construction waste shall be Partly recycle/reuse on site and disposal of remaining waste to authorized landfill site with permission of MCGM shall be disposed to authorized landfill site as per  |      | 4.8  |  Redundant machinery or equipment  |  No          |  --  |      | 4.9  |  Contaminated soils or other materials  |  No          |  --  |      | 4.10  |  Agricultural wastes  |  No          |  --  |      | 4.11  |  Other solid wastes  |  No          |  --  |      |  
  | 5  |  Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 5.1  |  Emissions from combustion of fossil fuels from stationary or mobile sources  |  Yes         |  Only from DG set that will be used during power failure  |      | 5.2  |  Emissions from production processes  |  No          |  --  |      | 5.3  |  Emissions from materials handling including storage or transport  |  Yes         |  Fugitive dust emission due to handling and loading-unloading activities shall be envisaged during construction. 
Frequent water sprinkling and other dust suppression measures shall be implemented to minimize the fugitive emissions.  |      | 5.4  |  Emissions from construction activities including plant and equipment  |  Yes         |  The project may cause rise in dust levels during construction phase. Dust suppression measures during construction phase shall be as per Notification dt. 25.01.2018
•	Provision of Barricades along the periphery of the site
•	Roads leading to or at construction sites must be paved and blacktopped
•	Vehicles having valid pollution under control certificate shall be allowed to ply on site.  |      | 5.5  |  Dust or odours from handling of materials including construction materials, sewage and waste  |  Yes         |  Dust suppression measures shall be followed as per 
Notification dt. 25.01.2018 and as described above.
For Construction Phase:
Provision of mitigation measures to control dust generation shall be done as per Notification dt. 25.01.2018 and as described above.
For Operation Phase:
•	For odour control: Provision of proper ventilation around STP and solid waste management facilities  |      | 5.6  |  Emissions from incineration of waste  |  No          |  --  |      | 5.7  |  Emissions from burning of waste in open air (e.g. slash materials, construction debris)  |  No          |  --  |      | 5.8  |  Emissions from any other sources  |  No          |  --  |      |  
  | 6  |  Generation of Noise and Vibration, and Emissions of Light and Heat:  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 6.1  |  From operation of equipment e.g. engines, ventilation plant, crushers  |  Yes         |  Noise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions shall be taken to control noise pollution: 
•	Provision of barricades along the periphery of the site
•	Monitoring of noise during construction activities to ascertain the noise levels are within limits  |      | 6.2  |  From industrial or similar processes  |  No          |  --  |      | 6.3  |  From construction or demolition  |  Yes         |  Noise levels may increase due to operation of machinery as well as transportation vehicles. This may cause nuisance to the nearby area. Following precautions shall be taken to control noise pollution: 
•	Provision of barricades along the periphery of the site
•	Monitoring of noise during construction activities to ascertain the noise levels are within limits  |      | 6.4  |  From blasting or piling  |  No          |  --  |      | 6.5  |  From construction or operational traffic  |  Yes         |  During Construction phase:
•	Transport of materials for construction work. Precautions shall be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.
During Operation Phase :
•	The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion.  |      | 6.6  |  From lighting or cooling systems  |  No          |  --  |      | 6.7  |  From any other sources  |  No          |  --  |      |  
  | 7  |  Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 7.1  |  From handling, storage, use or spillage of hazardous materials  |  No          |  --  |      | 7.2  |  From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)  |  No          |  During Construction Phase: 
Disposal of sewage to municipal sewer line. 
During Operation Phase:
Treated sewage shall be reused for flushing and gardening. Excess treated sewage from STP of initial occupied buildings shall be used for construction activity of remaining buildings and after completion of construction excess treated sewage shall be disposed to sewer line.  |      | 7.3  |  By deposition of pollutants emitted to air into the land or into water  |  No          |  Dust will be generated during the construction phase due movement of vehicles. Appropriate fugitive dust control measures, including watering, water sprinkling of exposed areas and dust covers for trucks are provided to minimize any impacts.
Stack height of DG set shall be as per CPCB guidelines.  |      | 7.4  |  From any other sources  |  No          |  --  |      | 7.5  |  Is there a risk of long term build up of pollutants in the environment from these sources?  |  No          |  --  |      |  
  | 8  |  Risk of accidents during construction or operation of the Project, which could affect human health or the environment  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 8.1  |  From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances  |  No          |  --  |      | 8.2  |  From any other causes  |  No          |  --  |      | 8.3  |  Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?  |  No          |  Detailed Disaster Management plan shall be submitted in EIA report.  |      |  
  | 9  |  Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality  |  
    | S.No  |  Information/Checklist confirmation  |  Yes/No  |  Details thereof (with approximate quantities/rates, wherever possible) with source    of information data  |      | 9.1  |  Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
     - Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
     - housing development
     - extractive industries
     - supply industries
     - Other
    |  Yes         |  Supporting infrastructure is already in existence 
Residential and commercial development  |      | 9.2  |  Lead to after-use of the site, which could have an impact on the environment  |  No          |  --  |      | 9.3  |  Set a precedent for later developments  |  Yes         |  Will create job opportunities in construction and operation phase with support staff like security, maintenance, household workers, shop keepers etc.  
There would be addition in commercial development of the area, which will   improve the economic growth at local and regional level  |      | 9.4  |  Have cumulative effects due to proximity to other existing or planned projects with similar effects  |  Yes         |  Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc.  |      |      |  (III)    |   Environmental Sensitivity  |           |  S.No  |   Areas  |   Name/Identity  |   Aerial distance (within 15km.) Proposed project location boundary  |        |     1  |       Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value   |  Yes         |  Thane Creek Flamingo Sanctuary = 2.00 km
Sanjay Gandhi National Park = 5.00 km
Maharashtra Nature Park = 9.00 km
Sion Fort = 9.00 km
Buddhist Caves (Kanheri) = 11.00 km
Kondivate Caves (Mahakali) = 6.00 km  |        |    2  |   Areas which are important or sensitive for ecological reasons - Wetlands, watercourses  or other water bodies, coastal zone, biospheres, mountains, forests  |  Yes         |  Arabian Sea = 11.00 km
Thane creek = 4.00 km
Mahim Bay = 11.00 km
Mahul Sewari Creek = 11.00 km
Malad Creek = 13.00 km
Mithi River = 4.00 km
Poisar River = 12.00 km
Dahisar River = 14.00 km
Ulhas River = 15.00 km
Powai Lake = 2.00 km
Chandivali Lake = 3.00 km
Vihar lake = 4.00 km  |        |    3  |     Areas used by protected, important or sensitive species of flora or fauna for breeding,   nesting, foraging, resting, over wintering, migration  |  Yes         |  Reserved forest near Parsik Hill = 10 km
Reserved forest near Kharghar = 12 km  |        |    4  |    Inland, coastal, marine or underground waters  |  Yes         |  Arabian Sea = 11.00 km
Thane creek = 4.00 km
Mahim Bay = 11.00 km
Mahul Sewari Creek = 11.00 km
Malad Creek = 13.00 km
Mithi River = 4.00 km
Poisar River = 12.00 km
Dahisar River = 14.00 km
Ulhas River = 15.00 km
Powai Lake = 2.00 km
Chandivali Lake = 3.00 km
Vihar lake = 4.00 km  |        |       5  |       State, National boundaries  |  No          |  --  |        |      6  |       Routes or facilities used by the public for access to recreation or other tourist,     pilgrim areas  |  Yes         |  Lal Bahadur Shastri Road = Abutting to project site  |        |         7  |       Defence installations  |  No          |  --  |        |         8  |          Densely populated or built-up area  |  Yes         |  Mumbai Metropolitan Region  |        |          9  |           Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,         community facilities)  |  Yes         |  Mumbai Metropolitan Region  |        |          10  |          Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals)  |  No          |  --  |        |           11  |       Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded)  |  No          |  --  |        |        12  |    Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)   similar effects  |  No          |  --  |       |        |  (IV)    |    PROPOSED TERMS OF REFERENCE FOR EIA STUDIES  |         |  (V)   |   Undertaking  |     | The aforesaid application and documents furnished here with are true to my knowledge |     | V.(i)  |  | Name | MACROTECH DEVELOPERS LIMITED |  | Designation | Authorized Signatory |  | Company  | MACROTECH DEVELOPERS LIMITED |   | Address | Lodha Excelus, NM Joshi Marg, Mahalaxmi, Mumbai- 400011 |  
  |   
  |