Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) HYMA DEVELOPERS PVT LTD
(b)Name of the Company / Organisation HYMA DEVELOPERS PVT. LTD.
(c)Registered Address 1-123, 8th floor, 3rd block, My Home hub, Madhapur, Hitech city,,Hyderabad,Rangareddi,Telangana-500081
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant SHYAMRAO J
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address 1-123, 8th floor, 3rd block, My Home hub, Madhapur, Hitech city,,Rangareddi,Telangana-500081
(d)Pin code 500081
(e)E-mail hymadevelopers45@gmail.com
(f)Telephone No. 40-66398686
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/TG/MIS/147673/2020
(e)Master Proposal Number(Single Window) SW/147672/2020
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 239(p), 240(p), 48, 49, 50
(b)Pincode 500084
(c)Bounded Latitudes (North)
From
Degree 17.3971886
Minutes
Second
From
Degree 17.4012106
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.3135829
Minutes
Second
From
Degree 78.3209606
Minutes
Second
(e)Survey of India Topo Sheet No. 56k/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 599
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaRangareddiRajendranagarKOKAPET
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason AS IT IS A CONSTRUCTION PROJECT
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)CAPTIVE STONE CRUSHER200 TPH
(2.)COMMERCIAL OFFICE COMPLEX12 TOWERS
(3.)CAPTIVE RMC UNIT90 CUM/HOUR
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)COMMERCIAL OFFICE COMPLEX3791793.87OthersSQ.MOthersNONE
(2.)CAPTIVE STONE CRUSHER200OthersTPHOthersINHOUSE
(3.)CAPTIVE RMC UNIT90OthersCUM/HOUROthersINHOUSE
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 7845
(b) Funds Allocated for Environment Management (Capital) (in crores) 220.8
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 47.22
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 14.5
(e) Funds Allocated for Environment Management Capital(%) 2.81
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 450000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 450000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FE 50021400Tons per AnnumOPEN MARKETRoad100 Open MarketCopy of Linkage
(2.)MANUFACTURED SAND150000Tons per AnnumOPEN MARKETRoad100 Open MarketCopy of Linkage
(3.)Cement150000Tons per AnnumOPEN MARKETRoad100 Open MarketCopy of Linkage
(4.)FLYASH15000Tons per AnnumOPEN MARKETRoad100 Open MarketCopy of Linkage
(5.)FLY ASH BRICKS51000Tons per AnnumOPEN MARKETRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube36.72636.760
(2.)PM10Micro Gram per Meter Cube62.245.662.2100
(3.)NOxMicro Gram per Meter Cube31.218.931.280
(4.)OthersCOMicro Gram per Meter Cube108581510852000
(5.)SO2Micro Gram per Meter Cube17.212.517.280
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.57.26.58.5
(2.)Fluoridemg/l0.50.21.01.5
(3.)TSSmg/l2.51.500
(4.)Total Hardnessmg/l315275300600
(5.)Heavy MetalsIRONmg/l0.30.10.10.3
(6.)Chloridesmg/l2422152501000
(7.)TDSmg/l5024155002000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l43.5B
(2.)pHNA7.77.5B
(3.)CODmg/l2221B
(4.)DOmg/l5.65.4B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))645265
(2.)Leq(Night)A-weighted decibels(dB(A))544255
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.67.2
(2.)P(Phosphorus)Kilogram per hectare4022
(3.)K(Potassium)Kilogram per hectare170115
(4.)N(Nitrogen)Kilogram per hectare225155
(5.)Electric ConductivityOthersMICROSIEMENS/SEC165110
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 42 To 46
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWS&SB117912Copy of Permission LetterPipelineOthersPIPELINE00001 Mar 202011791
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & flushing1035010350STPReuse within the Plant & Recycling,Green Belt Renewal Plant10350
16.1.
(a)Total Waste Water Generation 10350
(b)Total Discharged Water 0
(c)Total Reused Water 10350
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)waste oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre50RoadAuthorized Recyclers
(2.)MUNICIPAL SOLID WASTE GENERATIONMunicipal Solid Waste25093.8Tons5RoadOthersSEGREGATION FOLLOWED BY BIOCOMPOSTING & DISPOSAL
(3.)STP sludgeOthersSTP sludge377.8Tons0OthersinhouseOthersused as manure for greenbelt development
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube31.2118.649.880
(2.)PM10Microgram per Meter Cube62.217.269.4100
(3.)PM2.5Microgram per Meter Cube36.713.640.360
(4.)SO2Microgram per Meter Cube17.20017.280
(5.)Others(Specify)COMicrogram per Meter Cube1085110.81095.82000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)109 x 2500 DG SETSHIGH SPEED DIESEL30.5PM100.3 g/s per DG set
(2.)109 x 2500 DG setHIGH SPEED DIESEL30.5OthersNMHC1.0 per DG set
(3.)109 x 2500 DG setsHIGH SPEED DIESEL30.5NOx6.8 per DG set
(4.)109 x 2500 DG setsHIGH SPEED DIESEL30.5OthersCO2.7 per DG set
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 154000
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 109 x 2500
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 26.43
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 26.43
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 123.716
(b)Waste/Barren Land 57.776
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 45.53
(e)Settlements 47.392
(f)Industrial 6.596
(g)Forest 10.99
(h)Mangroves 0
(i)Marine Area 0
(j)Others : others 22.0
    Total 314
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt2.64
(2.)OthersGROUND COVERAGE & OTHERS23.79
Total 26.43
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAMrugavani national park4nil
(2.)ESAsnil0nil
(3.)ESZsnil0nil
(4.)Wildlife Corridorsnil0nil
(5.)WLSnil00
(6.)Corridorsnil0nil
(7.)Critically Polluted Areanil0nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installationsnil0nil
(2.)Forestnil0nil
(3.)Archaeological SitesQuli qutub shah tombs4nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.43
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area two streams
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required will be diverted
(ii)Details of Study Conducted yes
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area kokapet lake
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 500
(e)No. of working days 360
(f)Total Manpower 1500
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.643
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 3300
(d)Funds Allocated for Plantation 2475000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialemployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 150.7
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 12
(d)Total plot area (sqm) 264257.68
(e)Total built up area (sqm) 3791793.87
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
    Capacity 6080
(b)No. of Recharge Pits 80
    Capacity 230.4
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 28000/4500
5.
Energy Saving Measures:
(a)Source/Mode SOLAR
(b)Percentage 4
(c)Quantity 6000
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NIL
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA / 1922 / RA 0149
(ii)Name of the EIA Consultant PIONEER ENIRO LABORATORIES & CONSULTANTS PVT LTD
(iii)Address HYDERABAD
(iv)Mobile No. 9000380040
(v)Landline No. 0423114270
(vi)Email Id info@pioneerenvirolabs.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter NA
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSHYAMRAO J
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)HYMA DEVELOPERS PVT. LTD.
Address1-123, 8th floor, 3rd block, My Home hub, Madhapur, Hitech city,
Print