Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Captive Co-generation Plant at Plot No. 301 to 430 + 433 to 440/1, Saykha GIDC, PCPIR, Ta. Vagra, Dist: Bharuch
(b)Name of the Company / Organisation BODAL CHEMICALS LIMITED
(c)Registered Address Plot No. 123-124, Phase-I, GIDC, Vatva, Ahmedabad,,Ahmedabad,Gujarat-382445
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ankit Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 123-124, Phase-I, GIDC Vatva,,Ahmedabad City,Ahmedabad,Gujarat-382445
(d)Pin code 382445
(e)E-mail env@bodal.com
(f)Telephone No. 79-25835437
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(d) Thermal Power Plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/THE/31009/2018
(e)Master Proposal Number(Single Window) SW/134092/2019
(f)EAC concerned (for category A Projects only) Thermal Projects
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 301 to 430 + 433 to 440/1
(b)Pincode 392012
(c)Bounded Latitudes (North)
From
Degree 2412456.89
Minutes
Second
From
Degree 2412913.98
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 277860.27
Minutes
Second
From
Degree 278692.60
Minutes
Second
(e)Survey of India Topo Sheet No. F43M13 & F43M14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 12.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagraJuned
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/EC/4(D) &5(F)/177/2019
(b)Date of Apply of EC 03 Dec 2018
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site at Plot No. 301 to 430 + 433 to 440/1, Saykha GIDC, PCPIR, Ta. Vagra, Dist: Bharuch.
State :Gujarat
District :Bharuch
Tehsil :Vagra
Village :Juned
127Regarding air & water pollution, employment to local villagers & land losers, hiring local contractors, CER/ CSR activities & social responsibilities, coal storage & transportation etc.Others
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 18-A-5/2019(SEAC)/239
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Captive Co-Generation Plant0120120Mega Watt(MW)OthersTransmission Lines
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Captive Co-generation plnat0 MW120 MW120 MWPower will be used in-house for products which have already received EC/NOC.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Jan 1950
(iv)Valid Upto 01 Jan 1950
(v)File No. Not received
(vi)Application No. Not applicable
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 260
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.15
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.95
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0886
(e) Funds Allocated for Environment Management Capital(%) 0.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1000
(b)Existing quantity of raw material/fuel 1000
(c)Total quantity of raw material/fuel 2000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Imported/Indigenous700000Tons per AnnumImported / Indigenous coal from DahejRoad45 LOACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 18 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube11721115.6100
(2.)PM2.5Micro Gram per Meter Cube52444.760
(3.)SO2Micro Gram per Meter Cube14.7514.280
(4.)NOxMicro Gram per Meter Cube241022.980
(5.)OthersHgMicro Gram per Meter Cube000-
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.467.788.50
(2.)Fluoridemg/l0.810.2911.5
(3.)TDSmg/l47165105002000
(4.)Chloridesmg/l22161322501000
(5.)Total Hardnessmg/l710200200600
(6.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.458.17A
(2.)DOmg/l4.53.1A
(3.)BODmg/l131.9D
(4.)CODmg/l00A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.844.170 (Industrial), 45 (Residential)
(2.)Leq(Day)A-weighted decibels(dB(A))64.954.175 (Industrial), 55 (Residential)
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram00
(2.)K(Potassium)Milligram per Kilogram1300120
(3.)pH8.456.38
(4.)P(Phosphorus)Milligram per Kilogram00
(5.)Electric ConductivityOthersumhos/cm545215
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 9
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface39954Copy of Permission LetterPipelineOthersPumping by GIDCGIDC/RM/ANK/ALT/SYKH/59604 May 20188000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial118120Neutralization followed by SettlingReuse within the Plant & Recycling118
(2.)Domestic7120STPGreen Belt Renewal Plant7
16.1.
(a)Total Waste Water Generation 125
(b)Total Discharged Water 0
(c)Total Reused Water 125
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used or Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons55RoadAuthorized Recyclers
(2.)Discarded DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.25Tons55RoadAuthorized Recyclers
(3.)Fly AshFly Ash57500Tons55RoadOthersCement & Brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube770.71.4378.43100
(2.)NOxMicrogram per Meter Cube18.80.73.0721.8780
(3.)Others(Specify)HgMicrogram per Meter Cube0.10.70.00040.10040
(4.)SO2Microgram per Meter Cube9.50.72.5812.0880
(5.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilersImported Coal853.25PM10,SO2,NOx ,OthersHg30, 100, 100 & 0.03 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source -
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1,010 kVA each
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 48.2615
(d)Revenue Land 0
(e)Other Land 0
    Total Land 48.2615
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 26340
(b)Waste/Barren Land 309
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 349
(e)Settlements 407
(f)Industrial 103
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Vegetation Cover & Grass land 5579
    Total 33087
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.3Captive Power Plant
(2.)Built Up Area1.951Canteen, Admin, Engg office, lab, etc
(3.)OthersExisting units30.9128EC & NOC is received. Construction is pending
(4.)Green belt12.0977Greenbelt development
Total 48.2615
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0-
(2.)WLSNone0-
(3.)NPANone0-
(4.)ESAsNone0-
(5.)ESZsNone0-
(6.)CorridorsNone0-
(7.)Wildlife CorridorsNone0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0-
(2.)Archaeological SitesNone0-
(3.)Defence InstallationsNone0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 48.2615
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land already alloted by GIDC
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhukhi River
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 4.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 100
(e)No. of working days 350
(f)Total Manpower 450
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1209770120977
(2.)Percentage of Total Project Area25.1025
(3.)No. of Plants13600013600
(4.)Funds Allocated272000002720000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalState-of-the-art, CFBC Boilers will be used which are environment friendly.
(2.)SocialIncrease in business opportunities for local people as there will be scope of hiring vehicle like tractors and trolleys, bulldozers, JCB, excavators during construction and operation phase of the proj
(3.)Financial• Caustic Soda is a power intensive product in which about 65% of its production cost is attributed to power. To sustain in highly competitive market low cost power is essential. So, Captive Co-genera
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed CFBC
(b) Plant Load Factor(%) 90
(c) Station Heat Rate (Kcal/Kwh) 3000
(d) Steam Rate/Flow Rate 500
(e) Boiler Temperature 540
(f) Boiler Pressure 130
(g) Type of Stack Single flue
(h) No. of Stacks 1
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)1853.2517.5150
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)Imported/IndigenousLOA
Source of Linkage :Imported / Indigenous coal from Dahej
Quantity of Linkage Granted :700000
Date of Linkage :28 Dec 2018
Duration of Linkage :Once project starts, MOU will be executed
Gross Calorific Value (Kcal/Kg) :5751
Ash Content (%) :5.11
Sulphur Content (%) :0.89
Moisture (%) :21.51
Mercury (mg/kg) :0
Fixed Carbon (%) :43.42
Volatile Matter (%) :37.92
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Imported/Indigenous
Distance :
Quantity :
Distance :45
Quantity :700000
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :
Quantity :
45700000
TOTAL Distance : 0
Quantity : 0
Distance : 45
Quantity : 700000
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Air Cooled
(b) Type of Draft Forced Draft
(c) Type of Air Circulation Counter Flow
(d) Cycle of Cooling (COC) 10
(e) Water Req. For Cooling (m3/day) 274
(f) Boiler Blow Down Temperature 95
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0138
(ii)Name of the EIA Consultant Kadam Environmental Consultants
(iii)Address 871/B/3, GIDC Makarpura, Vadodara, India – 390 010
(iv)Mobile No. 9714861611
(v)Landline No. 0265613100
(vi)Email Id kadam@kadamenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 25 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)21/01/2020Kindly upload standard format of project details & Checklist for industrial projects.
(2.)22/01/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnkit Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)BODAL CHEMICALS LIMITED
AddressPlot No. 123-124, Phase-I, GIDC, Vatva, Ahmedabad