Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) KURRA SRINIVAS RAO (Office IT / ITES towers)
(b)Name of the Company / Organisation KURRA SRINIVAS RAO (OFFICE IT / ITES TOWERS)
(c)Registered Address O/O DIVIJA COMMERCIAL PROPERTIES PVT. LTD., 8TH FLOOR, BLOCK - 3, MY HOME HUB, MADHAPUR, HYDERABAD,,Rangareddi,Telangana-500081
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant SRRINIVASRAO KURRA
(b)Designation (Owner/ Partner/ CEO) LANDOWNER
(c)Address O/O DIVIJA COMMERCIAL PROPERTIES PVT. LTD., 8TH FLOOR, BLOCK - 3, MY HOME HUB, MADHAPUR, HYDERABAD,Rangareddi,Telangana-500081
(d)Pin code 500081
(e)E-mail r.rajasekharam@rmzcorp.com
(f)Telephone No. 99-63333013
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/TG/MIS/124628/2019
(e)Master Proposal Number(Single Window) SW/124616/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 92 (Part), 93, 94 (part), 95/A, 95 AA (part), 96 (
(b)Pincode 500081
(c)Bounded Latitudes (North)
From
Degree 17.4110824
Minutes
Second
From
Degree 17.4153185
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.3501165
Minutes
Second
From
Degree 78.3537334
Minutes
Second
(e)Survey of India Topo Sheet No. 56 K/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 565
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaRangareddiSerilingampalleNANAKRAMGUDA
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason AS IT IS A CONSTRUCTION PROJECT
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)BATCHING (READY MIX CONCRETE) PLANT60 CUM/HOURCAPTIVE UNIT
(2.)TOTAL BUILT UP AREA OF OFFICE IT/ITES TOWERS11,35,974 SQ.M6 TOWERS (G + 24 FLOORS), 5 COMMON BASEMENTS
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TOTAL BUILT-UP AREA OF OFFICE IT / ITES TOWERS1135974.55OthersSQ.MOthersNA
(2.)BATCHING (READY MIX CONCRETE) PLANT60OthersCUM/HOUROthersCAPTIVE
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 2141
(b) Funds Allocated for Environment Management (Capital) (in crores) 13.44
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 18.705
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 4.1603
(e) Funds Allocated for Environment Management Capital(%) 0.61
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cement44750OtherstonneslocalRoad50 OthersNACopy of Linkage
(2.)Sand135000OthersTONNESLOCALRoad50 OthersNACopy of Linkage
(3.)Steel Bar19200OthersTonneslocalRoad50 OthersnaCopy of Linkage
(4.)FLYASH13425OthersTONNESLOCALRoad50 OthersNACopy of Linkage
(5.)FLY ASH BRICKS46100OthersTONNESLOCALRoad50 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube36.626.236.660
(2.)SO2Micro Gram per Meter Cube18.812.518.880
(3.)NOxMicro Gram per Meter Cube32.816.532.880
(4.)OthersCOMicro Gram per Meter Cube110568511052000
(5.)PM10Micro Gram per Meter Cube61.545.661.5100
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.36.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l5284265002000
(4.)Total Hardnessmg/l305245300600
(5.)Chloridesmg/l2752102501000
(6.)Fluoridemg/l06041.01.5
(7.)Heavy MetalsIRONmg/l0.30.10.31.0
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00B
(2.)DOmg/l00B
(3.)BODmg/l00B
(4.)CODmg/l00B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))545155
(2.)Leq(Night)A-weighted decibels(dB(A))444145
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare215190
(2.)pH7.57.2
(3.)K(Potassium)Kilogram per hectare155135
(4.)Electric ConductivityOthersMICRO SIEMENS/CM159125
(5.)P(Phosphorus)Kilogram per hectare3220
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 42 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 43
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWS&SB35451Copy of Permission LetterPipelineOthersPIPELINE00001 Nov 20193545
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC & FLUSHING31613161STPReuse within the Plant & Recycling,Green Belt Renewal Plant3161
16.1.
(a)Total Waste Water Generation 3161
(b)Total Discharged Water 0
(c)Total Reused Water 3161
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)WASTE OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Kilolitre50RoadAuthorized Recyclers
(2.)E WASTEOthersE WASTE2Tons100RoadAuthorized Recyclers
(3.)STP SLUDGEOthersSTP SLUDGE115.4Tons0OthersWITHIN THE PREMISESOthersMANURE
(4.)MUNICIPAL SOLID WASTEMunicipal Solid Waste8103Tons1RoadOthersSEGREGATION & RECYCLING
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube61.512.163.6100
(2.)SO2Microgram per Meter Cube18.80018.880
(3.)NOxMicrogram per Meter Cube32.816.339.180
(4.)PM2.5Microgram per Meter Cube36.611.037.660
(5.)Others(Specify)COMicrogram per Meter Cube110514.51109.52000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2500DIESEL30.6PM100.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 44000
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 30 X 2500 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 10.299
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 10.299
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 10.299
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 10.299
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.9793
(2.)OthersROAD AFFECTED AREA & GROUND COVERAGE & OTHERS9.3199
Total 10.2992
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areanil0NIL
(2.)WLSnil0NIL
(3.)ESAsnil0NIL
(4.)ESZsnil0NIL
(5.)NPAMRUGAVANI NATIONAL PARK5.5NO IMPACT
(6.)Corridorsnil0NIL
(7.)Wildlife Corridorsnil0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesQutub shahi tombs4.6nil
(2.)Defence InstallationsLANGER HOUSE4.5nil
(3.)Forestnil0nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 10
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.299
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area KHAJAGUDA LAKE
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 200
(e)No. of working days 365
(f)Total Manpower 800
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.9793
(b)Percentage of Total Project Area 9.51
(c)No. of Plants to be Planted 1140
(d)Funds Allocated for Plantation 701000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEMPLOYMENT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 113.25
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 6
(d)Total plot area (sqm) 102992.9
(e)Total built up area (sqm) 1135974.55
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 30
    Capacity 2
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 18267/5430
5.
Energy Saving Measures:
(a)Source/Mode solar
(b)Percentage 2
(c)Quantity 880
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NIL
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA / 1619 /RA026
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address HYDERABAD
(iv)Mobile No. 9000380040
(v)Landline No. 0402311427
(vi)Email Id INFO@PIONEERENVIROLABS.COM
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 28 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSRRINIVASRAO KURRA
DesignationLANDOWNER
Name of Company (Applicant Name should not be given here)KURRA SRINIVAS RAO (OFFICE IT / ITES TOWERS)
AddressO/O DIVIJA COMMERCIAL PROPERTIES PVT. LTD., 8TH FLOOR, BLOCK - 3, MY HOME HUB, MADHAPUR, HYDERABAD
Print