Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of Coastal Berth at Old Mangalore Port
(b)Name of the Company / Organisation EXECUTIVE ENGINEER PORT AND FISHERIES DIVISION
(c)Registered Address PORT AND FISHERIES DIVISION UDUPI 2ND FLOOR " SHAMILI" AMBALAPADY, UDUPI,,Udupi,Karnataka-576103
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant MANCHEGOWDA TM
(b)Designation (Owner/ Partner/ CEO) EXECUTIVEENGINEER
(c)Address PORT AND FISHERIES DIVISION UDUPI 2ND FLOOR " SHAMILI" AMBALAPADY, UDUPI,Udupi,Karnataka-576103
(d)Pin code 576103
(e)E-mail aeepfsdmlr@yahoo.com
(f)Telephone No. 824-2441002
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(e) Ports, Harbours
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/KA/MIS/45911/2018
(e)Master Proposal Number(Single Window) SW/124164/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Port Land
(b)Pincode 575010
(c)Bounded Latitudes (North)
From
Degree 12.856750
Minutes
Second
From
Degree 12.860186
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.826197
Minutes
Second
From
Degree 74.827778
Minutes
Second
(e)Survey of India Topo Sheet No. 48-L/13(old) D43 U/13 (New)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 10.00
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaDakshina KannadaMangaloreBengre
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SEIAA 11 IND 2019
(c)Date of Apply of TOR 19 Nov 2018
(d)Date of Issue of TOR / Standard ToR 02 Jul 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Aug 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Sep 2019
Distance of Public Hearing Venue from the Proposed Project :0
Government High school Kasaba Bengre
State :Karnataka
District :Dakshina Kannada
Tehsil :Mangalore
Village :Bengre
70NillDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)FacilityCargo HandlingDevelopment of Port Infrastructure
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cargo handling120000Tons per AnnumOthersWater way
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 65
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.48
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.32
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.16
(e) Funds Allocated for Environment Management Capital(%) 1.54
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)00Tons per AnnumNil0Road0 OthersNillCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Dec 2018 To 30 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube8032.4877.4100
(2.)SO2Micro Gram per Meter Cube23.58.214.180
(3.)NOxMicro Gram per Meter Cube28.512.823.280
(4.)PM2.5Micro Gram per Meter Cube42.22239.760
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l564.1101200600
(2.)Fluoridemg/l0.10.0411.5
(3.)Heavy MetalsCoppermg/l0.050.050.051.5
(4.)OthersTUrbidityOthersNTU140515
(5.)pHOthersph7.696.76.58.5
(6.)Chloridesmg/l194.569.052501000
(7.)TDSmg/l5182205002000
(8.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l4.24.1C
(2.)pHNA8.016.4C
(3.)OthersTDSmg/l481220C
(4.)BODmg/l2.61.8C
(5.)DOmg/l6.36.2C
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))5545Day-55
(2.)Leq(Night)A-weighted decibels(dB(A))44.839.1Night- 50
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.66.8
(2.)Electric Conductivity00
(3.)N(Nitrogen)Milligram per Kilogram120100
(4.)P(Phosphorus)Milligram per Kilogram8358
(5.)K(Potassium)Milliequivalents per 100 Gram31
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.85 To 15.17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.65 To 9.4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface300 Not Appliacble PipelineOpen WellNA14 Sep 201930
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic100NAOthersAerobic/Chemically Treated100
16.1.
(a)Total Waste Water Generation 10
(b)Total Discharged Water 0
(c)Total Reused Water 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAConstruction & Demolition Waste0Tons0RoadOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10NA00000
(2.)PM2.5Microgram per Meter Cube00000
(3.)NOxNA00000
(4.)SO2NA00000
(5.)Others(Specify)PM (Project site)Microgram per Meter Cube800282100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 20
(b)Source Diesel for DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 30KVa
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 3.45
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.45
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Port Land 3.45
    Total 3.45
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersPlantation0.7
Total 0.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZs000
(2.)Wildlife Corridors000
(3.)Corridors000
(4.)NPA000
(5.)ESAs000
(6.)Critically Polluted Area000
(7.)WLS000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersNANA0NA
(2.)ForestNA0NA
(3.)Archaeological SitesNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 15
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 20
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Phalguni River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Phalguni
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 3.90
(d)Temporary Employment- During Operation 0
(e)No. of working days 1095
(f)Total Manpower 3.90
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.7
(b)Percentage of Total Project Area 20.29
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIt is a Port Infrastructure developement project for handling of High capacity cargos without production using No Production
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 7.5
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 34537
(e)Total built up area (sqm) 5146.59
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 8302.13 Sqm
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Ref: no. J-11013/77/2004-IA
(ii)Name of the EIA Consultant CSIR-National Institute of Oceanography
(iii)Address Dona Paula, Goa403004
(iv)Mobile No. 9495254557
(v)Landline No. 0832245045
(vi)Email Id spmg@nio.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 31 Dec 2025
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMANCHEGOWDA TM
DesignationEXECUTIVEENGINEER
Name of Company (Applicant Name should not be given here)EXECUTIVE ENGINEER PORT AND FISHERIES DIVISION
AddressPORT AND FISHERIES DIVISION UDUPI 2ND FLOOR " SHAMILI" AMBALAPADY, UDUPI
Print