Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Aliens Developers Pvt. Ltd. Construction of Residential apartments
(b)Name of the Company / Organisation M/S ALIENS DEVLOPERS PRIVATE LIMITED
(c)Registered Address Sy no 384 and 385 (P) Tellapur Village RC Puram Mandal Snagareddy district,,Sangareddy,Telangana-502032
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Challa Hari C
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Alienes devlopers pvt ltd plot no 56 and 57 vital rao nagar madhapur hyderabad,,Kandukur,Rangareddi,Telangana-500081
(d)Pin code 502032
(e)E-mail aliensdeveloperspvtltd@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/Activity8(b) Townships and Area Development projects.
(c)Category B1
(d)Proposal Number SIA/TG/MIS/63840/2021
(e)Master Proposal Number(Single Window) SW/218632/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 384 and 385 (P)
(b)Pincode 502032
(c)Bounded Latitudes (North)
From
Degree 17
Minutes 27
Second 37.49
From
Degree 17
Minutes 27
Second 48.70
(d)Bounded Longitudes (East)
From
Degree 78
Minutes 17
Second 02.77
From
Degree 78
Minutes 17
Second 10.76
(e)Survey of India Topo Sheet No. 563
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 563
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.016
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaSangareddyRamachandrapuramTellapur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SIA/TG/MIS/63840/2021
(c)Date of Apply of TOR 11 Jun 2021
(d)Date of Issue of TOR / Standard ToR 03 Jul 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As the proposed project falls under Sector 8(b) -
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total Area7.05 HaTotal Plot area – 7.55 Ha out of that about, 0.4919 Ha of area is affected in road widening, Further an area of 0.9374 Ha is earmarked for future development. Hence, the net area of the plot is 6.12 Ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up area544190.21OthersSQMOthersna
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 950
(b) Funds Allocated for Environment Management (Capital) (in crores) 14
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 9.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.5
(e) Funds Allocated for Environment Management Capital(%) 1.47
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Steel0Tons per AnnumLOACL MARKETRoad5 OthersnaCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 10 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube17.615.817.680
(2.)NOxMicro Gram per Meter Cube19.318.419.380
(3.)PM10Micro Gram per Meter Cube61.756.661.7100
(4.)PM2.5Micro Gram per Meter Cube23.421.523.460
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.26.58.5
(2.)Chloridesmg/l100.6850.342501000
(3.)Fluoridemg/l0.50.511.5
(4.)TSSmg/l101550500
(5.)Heavy MetalsiRONmg/l0.30.30.30.3
(6.)TDSmg/l10105005002000
(7.)Total Hardnessmg/l400280200600
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l2012E
(2.)BODmg/l64E
(3.)DOmg/l4.24C
(4.)pHNA7.857.2A
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))44.842.245
(2.)Leq(Night)A-weighted decibels(dB(A))54.651.955
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.897.41
(2.)N(Nitrogen)Kilogram per hectare46.8826.6
(3.)P(Phosphorus)Kilogram per hectare38.0525.74
(4.)K(Potassium)Kilogram per hectare36.9526.87
(5.)Electric ConductivityKilogram per hectare00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 18 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWSSB17401Copy of Permission LetterPipelineOthersPipe line conection82563104 Feb 20111740
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic15801800STPReuse within the Plant & Recycling,OthersPublic sewer1370210
16.1.
(a)Total Waste Water Generation 1580
(b)Total Discharged Water 210
(c)Total Reused Water 1370
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)STPOthersSewage3.6Tons0OthersReuseOthersConverted as manure
(2.)Bio degradableOthersBio degradable1430Tons0OthersreuseOthersConverted as manure
(3.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)204Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube61.71.30.0761.77100
(2.)SO2Microgram per Meter Cube17.61.30.26517.86580
(3.)NOxMicrogram per Meter Cube19.31.32.1921.4980
(4.)PM2.5Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)14x750 KVAHSD1130.332OthersPM0.05
(2.)3x630 kvAhsd1130.271OthersPM0.04
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 9500
(b)Source TSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3X630 KVA and 14 X 750 KVA
(e)Stack Height (in m) 113
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 7.05
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 7.05
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Construction site 7.05
    Total 7.05
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant1.53Plint area
(2.)Township3.456Open area
(3.)Green belt0.742
(4.)OthersRoads1.325
Total 7.053
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone within 10 km Radius00
(2.)Critically Polluted AreaNone within 10 km Radius00
(3.)WLSNone within 10 km Radius00
(4.)NPANone within 10 km Radius00
(5.)ESZsNone within 10 km Radius00
(6.)ESAsNone within 10 km Radius00
(7.)Wildlife CorridorsNone within 10 km Radius00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone within 10 km Radius00
(2.)Archaeological SitesNone within 10 km Radius00
(3.)ForestKondapur Reserved forest7.5EAST
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.053
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Medlachervu Tank
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.016
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 203
(c)Temporary Employment- During Construction 700
(d)Temporary Employment- During Operation 100
(e)No. of working days 365
(f)Total Manpower 1003
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.742
(b)Percentage of Total Project Area 10.52
(c)No. of Plants to be Planted 1855
(d)Funds Allocated for Plantation 352000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialInfrastructure development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 90
(b)Total No. of Flats to be Build 2240
(c)No. of Buildings 1
(d)Total plot area (sqm) 70549.13
(e)Total built up area (sqm) 544190.21
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 2.46
    Capacity 65
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 3399
5.
Energy Saving Measures:
(a)Source/Mode SOLAR LED CFLs in common areas
(b)Percentage 10
(c)Quantity 500
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 0122
(ii)Name of the EIA Consultant Sri Sai Manasa Nature Tech Private Limited
(iii)Address Plot No. 74/A, Flat No.102, Central bank building, Kalyan Nagar, Hyderabad
(iv)Mobile No. 9391116139
(v)Landline No. 0404135555
(vi)Email Id suresh.pasali@ssmntech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Nov 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantChalla Hari C
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S ALIENS DEVLOPERS PRIVATE LIMITED
AddressSy no 384 and 385 (P) Tellapur Village RC Puram Mandal Snagareddy district
Print