Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) TELLAPUR TECHNOCITY PVT. LTD. (Expansion of Residential complex)
(b)Name of the Company / Organisation TELLAPUR TECHNOCITY PRIVATE LIMITED
(c)Registered Address ILABS CENTRE, BUILDING III, NO. 18, SOFTWARE UNITS LAY OUT, MADHAPUR, HYDERABAD,,Hyderabad,Telangana-500081
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant VINOD J
(b)Designation (Owner/ Partner/ CEO) DIRECTOR
(c)Address ILABS CENTRE, BUILDING III, NO. 18, SOFTWARE UNITS LAY OUT, MADHAPUR, HYDERABAD,,Serilingampalle,Rangareddi,Telangana-500081
(d)Pin code 500081
(e)E-mail srikanthsriram@yahoo.com
(f)Telephone No. 73-86350246
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/TG/MIS/63031/2019
(e)Master Proposal Number(Single Window) SW/212354/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 366(p), 368(p), 369(p), 371(p) & 372(p)
(b)Pincode 500084
(c)Bounded Latitudes (North)
From
Degree 17.457297
Minutes
Second
From
Degree 17.460993
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.294667
Minutes
Second
From
Degree 78.298537
Minutes
Second
(e)Survey of India Topo Sheet No. 56K/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 566
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.3
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaSangareddyRamachandrapuramTellapur
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/TS/OL/SRD-88/2019
(b)Date of Apply of EC 30 Nov 2019
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason AS IT IS A CONSTRUCTION PROJECT
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 000
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up area of Residential complex660770.6263459.05724229.67OthersSq.mOthersnot applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Amenities block3B + G + 5 floors3B + G + 3 floors3B + G + 3 floorsdecrease in no. of floors
(2.)Residential complex12 Blocks (3B + G + 29 floors + terrace)12 Blocks (3B + G + 32 floors + terrace)12 blocks (3B + G + 32 floors + terrace)increase in no. of floors
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 May 2021
(iv)Valid Upto 02 May 2021
(v)File No. 000
(vi)Application No. 000
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 135
(b) Funds Allocated for Environment Management (Capital) (in crores) 10.38
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2.74
(e) Funds Allocated for Environment Management Capital(%) 7.69
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 92500
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 92500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FLY ASH BRICKS10500Tons per AnnumOPEN MARKETRoad100 OthersNACopy of Linkage
(2.)FLYASH3100Tons per AnnumOPEN MARKETRoad100 OthersNACopy of Linkage
(3.)MANUFACTURED SAND30800Tons per AnnumOPEN MARKETRoad100 OthersNACopy of Linkage
(4.)FE 5004400Tons per AnnumOPEN MARKETRoad100 OthersNACopy of Linkage
(5.)Cement10300Tons per AnnumOPEN MARKETRoad100 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube29.924.229.960
(2.)PM10Micro Gram per Meter Cube51.341.851.3100
(3.)SO2Micro Gram per Meter Cube15.69.015.680
(4.)NOxMicro Gram per Meter Cube16.812.516.880
(5.)OthersCOMicro Gram per Meter Cube8954858952000
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l289245300600
(2.)pHNA7.87.36.58.5
(3.)Heavy MetalsIRONmg/l0.20.10.31.0
(4.)TSSNA0000
(5.)Chloridesmg/l2402052501000
(6.)Fluoridemg/l0.70.61.01.5
(7.)TDSmg/l5354645002000
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DONA00B
(2.)BODNA00B
(3.)CODNA00B
(4.)pHNA00B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))544855
(2.)Leq(Night)A-weighted decibels(dB(A))443545
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare305132
(2.)Electric ConductivityOthersmicro siemens/cm178116
(3.)pH7.67.1
(4.)P(Phosphorus)Kilogram per hectare6636
(5.)K(Potassium)Kilogram per hectare375158
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 43 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHMWS&SB22201Copy of Permission LetterPipelineOthersPIPELINE00014 Apr 20212220
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & flushing19292300STPDischarge into Surface Water Body,Reuse within the Plant & Recycling7851144
16.1.
(a)Total Waste Water Generation 1929
(b)Total Discharged Water 1144
(c)Total Reused Water 785
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Kilolitre50RoadAuthorized Recyclers
(2.)Municipal Solid wasteMunicipal Solid Waste3268.5Tons1RoadOthersSegregation biocomposting disposal
(3.)STP sludgeOthersSTP sludge70.4Tons0OthersNAOthersUsed as manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube51.311.652.9100
(2.)SO2Microgram per Meter Cube15.60015.680
(3.)PM2.5Microgram per Meter Cube29.910.830.760
(4.)NOxMicrogram per Meter Cube16.814.821.680
(5.)Others(Specify)COMicrogram per Meter Cube89513.9898.92000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SETS 6 X 1250 KVADIESEL30.5OthersCO7.2 g/s
(2.)DG SETS 6 X 1250 KVADIESEL30.5PM100.6 g/s
(3.)DG SETS 6 X 1250 KVADIESEL30.5NOx19.2 g/s
(4.)DG SETS 6 X 1250 KVADIESEL30.5OthersHC3.0 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17500
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 6 X 1250 KVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 9.52
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 9.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 139.271
(b)Waste/Barren Land 84.874
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 25.45
(e)Settlements 26.65
(f)Industrial 16.956
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : ICRISAT, BOTANICAL GARDEN & OUTER RING ROAD 20.8
    Total 314.001
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant1.73Ground coverage
(2.)Green belt0.98
(3.)OthersPaved area, Open land, Irrigation drain6.81Paved area, Open land, Irrigation drain
Total 9.52
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNIL0NIL
(2.)Critically Polluted AreaNIL0NIL
(3.)WLSNIL0NIL
(4.)NPANIL0NIL
(5.)ESAsNIL0NIL
(6.)ESZsNIL0NIL
(7.)CorridorsNIL0NIL
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNIL0NIL
(2.)OthersBotanical gardenShri Kotla Vijayabhaskara Reddy Botanical Garden5.6no impact due to proposed project
(3.)ForestNIL0NIL
(4.)Archaeological SitesNIL0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Stream is passing through the site
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Permission from Irrigation department has been obtained
(ii)Details of Study Conducted Done by Irrigation department
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. SE/IC/SRD/DEE(T)/TS4/455
(iii)Date of issue 23 Mar 2021
(iv)Recommendation accorded permission for diversion of stream on one
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mella cheruvu
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 250
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 250
(e)No. of working days 365
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area010.2910
(2.)No. of Plants014501450
(3.)Total Area of Green Belt00.980
(4.)Funds Allocated014500001450000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialHOUSING & EMPLOYMENT
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 100.3
(b)Total No. of Flats to be Build 3120
(c)No. of Buildings 13
(d)Total plot area (sqm) 95181.21
(e)Total built up area (sqm) 724229.67
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 50
    Capacity 35
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 5255/1650
5.
Energy Saving Measures:
(a)Source/Mode solar energy
(b)Percentage 2
(c)Quantity 350
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0149
(ii)Name of the EIA Consultant PIONEER ENVIRO LABOATORIES & CONSULTANTS PVT LTD
(iii)Address HYDERABAD
(iv)Mobile No. 9000380040
(v)Landline No. 0402311427
(vi)Email Id santhoshneo02@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)20/05/2021You are requested to KML file with Boundaries
(2.)20/05/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVINOD J
DesignationDIRECTOR
Name of Company (Applicant Name should not be given here)TELLAPUR TECHNOCITY PRIVATE LIMITED
AddressILABS CENTRE, BUILDING III, NO. 18, SOFTWARE UNITS LAY OUT, MADHAPUR, HYDERABAD