Details of Project:
(a)Name of the project(s) Proposed expansion of Captive Co-Generation Power Plant from 56 MW to 106 MW by installing additional 50 MW Power Plant by M/s Atul Ltd
(b)Name of the Company / Organisation ATUL LTD
(c)Registered Address M/s Atul Industries Ltd, Atul, Valsad. Atul -396020 ,,Valsad,Gujarat-396020
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dr. Sharad Sonyabapu Potghan
(b)Designation (Owner/ Partner/ CEO) Corp. General Manager-EHS
(c)Address M/s Atul Industries Ltd, Atul, Valsad. Atul -396020,Valsad,Gujarat-396020
(d)Pin code 396020
(e)E-mail hriday_desai@atul.co.in
(f)Telephone No. 0-233261
(g)Fax No. 233619
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(d) Thermal Power Plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/THE/61911/2020
(e)Master Proposal Number(Single Window) SW/203992/2021
(f)EAC concerned (for category A Projects only) Thermal Projects
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 5, 6, 29, 30, 33 to 38, 80, 81, 84, 85,
(b)Pincode 396020
(c)Bounded Latitudes (North)
From
Degree 20.53722
Minutes
Second
From
Degree 20.53858
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.93238
Minutes
Second
From
Degree 72.93497
Minutes
Second
(e)Survey of India Topo Sheet No. F43S14, F43S15, F43T2, F43T3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 17
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.42
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratValsadValsadAtul & Haria
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEIAA/GUJ/TOR/1(d)/655/2020
(b)Date of Apply of EC 11 Mar 2020
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Nov 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Jan 2021
Distance of Public Hearing Venue from the Proposed Project :1.4
Gram Panchayat Hall, Village: Atul, Tal. & Dist. Valsad, Gujarat
State :Gujarat
District :Valsad
Tehsil :Valsad
Village :Atul
122Most of the participants has welcomed the project with suggestion of local employment, proper operation of EMS, utilize CER/CSR fundOthersResident Additional Collector and Additional District Magistrate-Valsad
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 18-A-30/2019 (SEAC)/201
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Captive Co-Gen Power Plant5650106Mega Watt(MW)OthersThrough Cables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Co-generation Power Plant56 MW50 MW106 MW
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Nov 2019
(iv)Valid Upto 30 Sep 2025
(v)File No. GPCB/CCA-VSD-313(17)/ID-23158
(vi)Application No. 163867
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 297
(b) Funds Allocated for Environment Management (Capital) (in crores) 28.13
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 2.23
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 6.535
(e) Funds Allocated for Environment Management Capital(%) 9.47
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 324000
(b)Existing quantity of raw material/fuel 563100
(c)Total quantity of raw material/fuel 887100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lignite266100Tons per AnnumGMDCRoad75 Open MarketCopy of Linkage
(2.)Imported Coal/ Indian Coal621000Tons per AnnumImport-Indonesia/Australia(Hazira/Magdalla)Road,OthersSea70 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube22.811.820.9480
(2.)SO2Micro Gram per Meter Cube10.96.510.3880
(3.)PM2.5Micro Gram per Meter Cube45.513.532.8160
(4.)PM10Micro Gram per Meter Cube93.231.574.88100
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l12500
(2.)Total Hardnessmg/l29050300600
(3.)Heavy MetalsIronmg/l0.0600.31.0
(4.)TDSmg/l7481885002000
(5.)Fluoridemg/l0.980.111.01.5
(6.)pHOtherspH unit8.457.638.58.5
(7.)Chloridesmg/l284552501000
    14.3.     No. of Surface Water Monitoring Locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.73.2A
(2.)CODmg/l155A
(3.)BODmg/l72D
(4.)pHOtherspH unit8.096.51A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.253.975
(2.)Leq(Night)A-weighted decibels(dB(A))63.644.370
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Othersg/kg0.1510.096
(2.)K(Potassium)Othersg/kg0.070.02
(3.)Electric ConductivityOthersdS/cm0.680.175
(4.)pHOtherspH unit8.257.07
(5.)P(Phosphorus)Othersg/kg0.0520.037
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSurface water, STP treated water25881.41.25Copy of Permission LetterPipelineOthersParRiver,treatedsewagefrmValsad&Pardi municipality475114 Sep 201734741.65
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial1212.71250ROReuse within the Plant & Recycling1212.7
(2.)Domestic4.05.0Soak PitOthersTo Soak pit004.0
16.1.
(a)Total Waste Water Generation 1216.7
(b)Total Discharged Water 4
(c)Total Reused Water 1212.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Kilolitre30RoadAuthorized Recyclers
(2.)Fly Ash & Bottom AshOthersSolid Waste Rule, 2016245400Tons25RoadOthersTo cement ind./brick mfg/at own brick mfg plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.1810.94063.11100
(2.)PM2.5Microgram per Meter Cube25.9110.62626.5460
(3.)NOxMicrogram per Meter Cube17.3610.70418.0780
(4.)SO2Microgram per Meter Cube8.8910.7859.6780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam Boiler for CPP (230 TPH) (Proposed)Coal/Lignite 900 TPD1063.0OthersPM, SO2, NOx1.766 g/s, 4.239 g/s, 3.179 g/s
(2.)D G Set (500 kVA)HSD-150 li/hr.200.3OthersPM, SO2, NOX0.085 g/s, 0.051 g/s, 0.073 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Grid & CPP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) D.G. Set (500 kVA)
(e)Stack Height (in m) 20
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 112.60782
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 112.60782
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 14601
(b)Waste/Barren Land 365
(c)Grazing/ Community Land 9608
(d)Surface Water Bodies 981
(e)Settlements 3032
(f)Industrial 360
(g)Forest 7313
(h)Mangroves 153
(i)Marine Area 144
(j)Others : Mining Area + aquatic vegetation 28
    Total 36585
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt40.9030
(2.)Others(area for proposed CPP)3.0
(3.)Main Plant68.70482
Total 112.60782
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone within 10 km radius00No ESZ present in the Study area
(2.)Wildlife CorridorsNone within 10 km radius00No Wildlife corridors present in Study area
(3.)WLSNone within 10 km radius00No WLS present in Study area
(4.)NPANone within 10 km radius00No NPA is present in Study area
(5.)Critically Polluted AreaNone within 10 km radius00Project is not located in CPA
(6.)ESAsNone within 10 km radius00No ESA is present in Study area
(7.)CorridorsNone within 10 km radius00No corridors present in Study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone within 10 km radius00No Defense Installations is present within study area
(2.)ForestParnera Reserve Forest2.0-
(3.)Archaeological SitesNone within 10 km radius00No Archaeological site is present within study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 112.6078
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Total Land is already purchased
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock or Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 500000
(iii)Period of Implementation within 5 yrs.
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Par River, about 1.25 km
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Auranga River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 9.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 279
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 00
(e)No. of working days 365
(f)Total Manpower 579
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt40.9030040
(2.)Percentage of Total Project Area36.32036
(3.)No. of Plants1020000102000
(4.)Funds Allocated1000000100000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialIncrease the revenue of the State
(2.)SocialEmployment generation, Improvement in social infrastructure
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Thermal Projects
S. No.Item Details
1.
Specifications of Plant:
(b) Technology Proposed CFBC
(b) Plant Load Factor(%) 100
(c) Station Heat Rate (Kcal/Kwh) 2000
(d) Steam Rate/Flow Rate 230
(e) Boiler Temperature 545
(f) Boiler Pressure 115
(g) Type of Stack Single flue
(h) No. of Stacks 2
S. No. Stack ID Stack Height (m) Stack Diameter at exit (m) Exit Velocity of Stack Gas (m/s) Exit Temperature of Stack Gas (Degree Celsius)
(1.)1106310195
(2.)2200.316210
      2.        Details of Fuel Linkage
S. No.Type of Fuel Type of Linkage Other Type of Linkage DetailsCharacteristics
(1.)Imported Coal/ Indian CoalFuel Supply Agreement
Source of Linkage :Import-Indonesia/Australia(Hazira/Magdalla)
Quantity of Linkage Granted :621000
Date of Linkage :27 Oct 2016
Duration of Linkage :5 years
Gross Calorific Value (Kcal/Kg) :5000
Ash Content (%) :13
Sulphur Content (%) :0.5
Moisture (%) :40
Mercury (mg/kg) :0.01
Fixed Carbon (%) :38
Volatile Matter (%) :33
(2.)LigniteOpen Market
Source of Linkage :GMDC
Quantity of Linkage Granted :266100
Date of Linkage :08 Oct 2019
Duration of Linkage :5 years
Gross Calorific Value (Kcal/Kg) :4500
Ash Content (%) :16
Sulphur Content (%) :0.8
Moisture (%) :40
Mercury (mg/kg) :0.01
Fixed Carbon (%) :26
Volatile Matter (%) :40
     3.       Details of Transportation of Fuel
S. No.Fuel Rail RoadPipe ConveyorConveyor BeltArial RopewayOther Mode of TransportationTotal DistanceTotal Quantity
(1.)Imported Coal/ Indian Coal
Distance :
Quantity :
Distance :70
Quantity :621000
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :0
Quantity :0
70621000
(2.)Lignite
Distance :
Quantity :
Distance :75
Quantity :266100
Distance :
Quantity :
Distance :0
Quantity :
Distance :
Quantity :
Distance :
Quantity :
75266100
TOTAL Distance : 0
Quantity : 0
Distance : 145
Quantity : 887100
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
Distance : 0
Quantity : 0
4.
Details of Cooling System:
(a) Type of Cooling System Water Cooled
(b) Type of Draft Forced Draft
(c) Type of Air Circulation Counter Flow
(d) Cycle of Cooling (COC) 5 to 6
(e) Water Req. For Cooling (m3/day) 3360.1
(f) Boiler Blow Down Temperature 100
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act Details are given in EIA Report, Annexure-X
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd.
(iii)Address 424, Medicine Market, Paldi Cross Road, Paldi, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Thermal Projects
(ix)Validity of Accreditation 01 Jun 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)19/08/2021Kindly refer last SEAC Minutes of the meeting and submit an online reply on PARIVESH only with authenticated documents.
(2.)21/08/2021Reply wrt SEAC Minutes is uploaded herewith.ADS Letter
(3.)21/08/2021Reply wrt SEAC Minutes is uploaded herewith.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr. Sharad Sonyabapu Potghan
DesignationCorp. General Manager-EHS
Name of Company (Applicant Name should not be given here)ATUL LTD
AddressM/s Atul Industries Ltd, Atul, Valsad. Atul -396020
Print