1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed expansion of Captive Co-Generation Power Plant from 56 MW to 106 MW by installing additional 50 MW Power Plant by M/s Atul Ltd | (b)Name of the Company / Organisation | ATUL LTD | (c)Registered Address | M/s Atul Industries Ltd, Atul, Valsad.
Atul -396020 ,,Valsad,Gujarat-396020 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr. Sharad Sonyabapu Potghan | (b)Designation (Owner/ Partner/ CEO) | Corp. General Manager-EHS | (c)Address | M/s Atul Industries Ltd, Atul, Valsad.
Atul -396020,Valsad,Gujarat-396020 | (d)Pin code | 396020 | (e)E-mail | hriday_desai@atul.co.in | (f)Telephone No. | 0-233261 | (g)Fax No. | 233619 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 1(d) Thermal Power Plants
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/THE/61911/2020 | (e)Master Proposal Number(Single Window) | SW/203992/2021 | (f)EAC concerned (for category A Projects only) | Thermal Projects | (g)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 5, 6, 29, 30, 33 to 38, 80, 81, 84, 85, | (b)Pincode | 396020 | (c)Bounded Latitudes (North) | | From | | Degree | 20.53722 | Minutes | | Second | | From | | Degree | 20.53858 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.93238 | Minutes | | Second | | From | | Degree | 72.93497 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43S14, F43S15, F43T2, F43T3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 17 | (h)Uploaded (kml) File | Copy of Kml File  | (i)Distance of Nearest HFL from the project boundary within the study area | 0.42 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Valsad | Valsad | Atul & Haria | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SEIAA/GUJ/TOR/1(d)/655/2020 | (b)Date of Apply of EC | 11 Mar 2020 | (c)Date of Issue of EC | 31 Dec 1899 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Jan 2021 | Distance of Public Hearing Venue from the Proposed Project : | 1.4 |
| Gram Panchayat Hall, Village: Atul, Tal. & Dist. Valsad, Gujarat | State : | Gujarat | District : | Valsad | Tehsil : | Valsad | Village : | Atul |
| 122 | Most of the participants has welcomed the project with suggestion of local employment, proper operation of EMS, utilize CER/CSR fund | Others | Resident Additional Collector and Additional District Magistrate-Valsad | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 18-A-30/2019 (SEAC)/201 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | N/A | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Captive Co-Gen Power Plant | 56 | 50 | 106 | Mega Watt(MW) | | Others | Through Cables | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Co-generation Power Plant | 56 MW | 50 MW | 106 MW | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Nov 2019 | (iv)Valid Upto | 30 Sep 2025 | (v)File No. | GPCB/CCA-VSD-313(17)/ID-23158 | (vi)Application No. | 163867 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 297 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 28.13 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 2.23 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 6.535 | (e) Funds Allocated for Environment Management Capital(%) | 9.47 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 324000 | (b)Existing quantity of raw material/fuel | 563100 | (c)Total quantity of raw material/fuel | 887100 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Lignite | 266100 | Tons per Annum | | GMDC | Road | | 75 | Open Market | | Copy of Linkage | (2.) | Imported Coal/ Indian Coal | 621000 | Tons per Annum | | Import-Indonesia/Australia(Hazira/Magdalla) | Road,Others | Sea | 70 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2018 To 31 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 22.8 | 11.8 | 20.94 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 10.9 | 6.5 | 10.38 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 45.5 | 13.5 | 32.81 | 60 | (4.) | PM10 | | Micro Gram per Meter Cube | 93.2 | 31.5 | 74.88 | 100 | |
14.2. No. of Ground Water Monitoring Locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 12 | 5 | 0 | 0 | (2.) | Total Hardness | | | mg/l | | 290 | 50 | 300 | 600 | (3.) | Heavy Metals | | Iron | mg/l | | 0.06 | 0 | 0.3 | 1.0 | (4.) | TDS | | | mg/l | | 748 | 188 | 500 | 2000 | (5.) | Fluoride | | | mg/l | | 0.98 | 0.11 | 1.0 | 1.5 | (6.) | pH | | | Others | pH unit | 8.45 | 7.63 | 8.5 | 8.5 | (7.) | Chlorides | | | mg/l | | 284 | 55 | 250 | 1000 | |
14.3. No. of Surface Water Monitoring Locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 4.7 | 3.2 | A | (2.) | COD | | mg/l | | 15 | 5 | A | (3.) | BOD | | mg/l | | 7 | 2 | D | (4.) | pH | | Others | pH unit | 8.09 | 6.51 | A | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.2 | 53.9 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 63.6 | 44.3 | 70 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Others | g/kg | 0.151 | 0.096 | (2.) | K(Potassium) | Others | g/kg | 0.07 | 0.02 | (3.) | Electric Conductivity | Others | dS/cm | 0.68 | 0.175 | (4.) | pH | Others | pH unit | 8.25 | 7.07 | (5.) | P(Phosphorus) | Others | g/kg | 0.052 | 0.037 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 8 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Surface water, STP treated water | 25881.4 | 1.25 | Copy of Permission Letter | Pipeline | | Others | ParRiver,treatedsewagefrmValsad&Pardi municipality | 4751 | 14 Sep 2017 | 34741.65 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 1212.7 | 1250 | RO | Reuse within the Plant & Recycling | | 1212.7 | | (2.) | Domestic | 4.0 | 5.0 | Soak Pit | Others | To Soak pit | 00 | 4.0 | |
|
16.1. | (a)Total Waste Water Generation | 1216.7 | (b)Total Discharged Water | 4 | (c)Total Reused Water | 1212.7 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Kilolitre | 30 | Road | | Authorized Recyclers | | (2.) | Fly Ash & Bottom Ash | Others | Solid Waste Rule, 2016 | 245400 | Tons | 25 | Road | | Others | To cement ind./brick mfg/at own brick mfg plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.18 | 1 | 0.940 | 63.11 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 25.91 | 1 | 0.626 | 26.54 | 60 | (3.) | NOx | | Microgram per Meter Cube | 17.36 | 1 | 0.704 | 18.07 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 8.89 | 1 | 0.785 | 9.67 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler for CPP (230 TPH) (Proposed) | Coal/Lignite 900 TPD | 106 | 3.0 | Others | PM, SO2, NOx | 1.766 g/s, 4.239 g/s, 3.179 g/s | (2.) | D G Set (500 kVA) | HSD-150 li/hr. | 20 | 0.3 | Others | PM, SO2, NOX | 0.085 g/s, 0.051 g/s, 0.073 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2500 | (b)Source | Grid & CPP | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D.G. Set (500 kVA) | (e)Stack Height (in m) | 20 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 112.60782 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 112.60782 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 14601 | (b)Waste/Barren Land | 365 | (c)Grazing/ Community Land | 9608 | (d)Surface Water Bodies | 981 | (e)Settlements | 3032 | (f)Industrial | 360 | (g)Forest | 7313 | (h)Mangroves | 153 | (i)Marine Area | 144 | (j)Others : Mining Area + aquatic vegetation | 28 | Total | 36585 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Green belt | | 40.9030 | | (2.) | Others | (area for proposed CPP) | 3.0 | | (3.) | Main Plant | | 68.70482 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | None within 10 km radius | 00 | No ESZ present in the Study area | (2.) | Wildlife Corridors | None within 10 km radius | 00 | No Wildlife corridors present in Study area | (3.) | WLS | None within 10 km radius | 00 | No WLS present in Study area | (4.) | NPA | None within 10 km radius | 00 | No NPA is present in Study area | (5.) | Critically Polluted Area | None within 10 km radius | 00 | Project is not located in CPA | (6.) | ESAs | None within 10 km radius | 00 | No ESA is present in Study area | (7.) | Corridors | None within 10 km radius | 00 | No corridors present in Study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None within 10 km radius | 00 | No Defense Installations is present within study area | (2.) | Forest | | Parnera Reserve Forest | 2.0 | - | (3.) | Archaeological Sites | | None within 10 km radius | 00 | No Archaeological site is present within study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 112.6078 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Total Land is already purchased | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in Rs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock or Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 500000 | (iii)Period of Implementation | within 5 yrs. | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Par River, about 1.25 km | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Auranga River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 9.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 279 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 365 | (f)Total Manpower | 579 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 40.9030 | 0 | 40 | (2.) | Percentage of Total Project Area | 36.32 | 0 | 36 | (3.) | No. of Plants | 102000 | 0 | 102000 | (4.) | Funds Allocated | 100000 | 0 | 100000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Increase the revenue of the State | (2.) | Social | Employment generation, Improvement in social infrastructure | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Thermal Projects |
|
1. | Specifications of Plant: | (b) Technology Proposed | CFBC | (b) Plant Load Factor(%) | 100 | (c) Station Heat Rate (Kcal/Kwh) | 2000 | (d) Steam Rate/Flow Rate | 230 | (e) Boiler Temperature | 545 | (f) Boiler Pressure | 115 | (g) Type of Stack | Single flue | (h) No. of Stacks | 2 | |
|
S. No. | Stack ID | Stack Height (m) | Stack Diameter at exit (m) | Exit Velocity of Stack Gas (m/s) | Exit Temperature of Stack Gas (Degree Celsius) |
---|
(1.) | 1 | 106 | 3 | 10 | 195 | (2.) | 2 | 20 | 0.3 | 16 | 210 | |
|
2. Details of Fuel Linkage |
---|
S. No. | Type of Fuel | Type of Linkage | Other Type of Linkage | Details | Characteristics |
---|
(1.) | Imported Coal/ Indian Coal | Fuel Supply Agreement | | Source of Linkage : | Import-Indonesia/Australia(Hazira/Magdalla) | Quantity of Linkage Granted : | 621000 | Date of Linkage : | 27 Oct 2016 | Duration of Linkage : | 5 years |
| Gross Calorific Value (Kcal/Kg) : | 5000 | Ash Content (%) : | 13 | Sulphur Content (%) : | 0.5 | Moisture (%) : | 40 | Mercury (mg/kg) : | 0.01 | Fixed Carbon (%) : | 38 | Volatile Matter (%) : | 33 |
| (2.) | Lignite | Open Market | | Source of Linkage : | GMDC | Quantity of Linkage Granted : | 266100 | Date of Linkage : | 08 Oct 2019 | Duration of Linkage : | 5 years |
| Gross Calorific Value (Kcal/Kg) : | 4500 | Ash Content (%) : | 16 | Sulphur Content (%) : | 0.8 | Moisture (%) : | 40 | Mercury (mg/kg) : | 0.01 | Fixed Carbon (%) : | 26 | Volatile Matter (%) : | 40 |
| |
|
3. Details of Transportation of Fuel |
---|
S. No. | Fuel | Rail | Road | Pipe Conveyor | Conveyor Belt | Arial Ropeway | Other Mode of Transportation | Total Distance | Total Quantity |
---|
(1.) | Imported Coal/ Indian Coal | | Distance : | 70 | Quantity : | 621000 |
| | | | | 70 | 621000 | (2.) | Lignite | | Distance : | 75 | Quantity : | 266100 |
| | | | | 75 | 266100 | |
TOTAL | Distance : 0 Quantity : 0 | Distance : 145 Quantity : 887100 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | Distance : 0 Quantity : 0 | |
|
4. | Details of Cooling System: | (a) Type of Cooling System | Water Cooled | (b) Type of Draft | Forced Draft | (c) Type of Air Circulation | Counter Flow | (d) Cycle of Cooling (COC) | 5 to 6 | (e) Water Req. For Cooling (m3/day) | 3360.1 | (f) Boiler Blow Down Temperature | 100 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act | Details are given in EIA Report, Annexure-X | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0084 | (ii)Name of the EIA Consultant | San Envirotech Pvt. Ltd. | (iii)Address | 424, Medicine Market, Paldi Cross Road, Paldi, Ahmedabad | (iv)Mobile No. | 9825007201 | (v)Landline No. | 0792658307 | (vi)Email Id | mahendra.sepl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Thermal Projects | (ix)Validity of Accreditation | 01 Jun 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 19/08/2021 | Kindly refer last SEAC Minutes of the meeting and submit an online reply on PARIVESH only with authenticated documents. | | (2.) | 21/08/2021 | Reply wrt SEAC Minutes is uploaded herewith. | ADS Letter | (3.) | 21/08/2021 | Reply wrt SEAC Minutes is uploaded herewith. | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr. Sharad Sonyabapu Potghan | Designation | Corp. General Manager-EHS | Name of Company (Applicant Name should not be given here) | ATUL LTD | Address | M/s Atul Industries Ltd, Atul, Valsad.
Atul -396020 |
|