Form-1 | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | 1. Basic Informations | Project Name | Proposed Group Housing Project Mahima Sansaar (Phase-2) “Spring Villa” | Company/Organisation Name | MAHIMA REAL ESTATE PVT LTD | Registered Address | 4TH FLOOR, CRYSTAL PALM, 22 GODAM CIRCLE Rajasthan 302001 | Legal Status of the Company | Private |
| 2. | Address for the correspondence: | (a)Name of the Applicant | KAPIL RAISINGHANI | (b)Designation (Owner/ Partner/ CEO) | authorisedsignatory | (c)Address | 4th FLOOR, CRYSTAL PALM, 22 GODAM CIRCLE,,Jaipur,Jaipur,Rajasthan-302001 | (d)Pin code | 302001 | (e)E-mail | mahimasansaar@gmail.com | (f)Telephone No. | 141-4050607 | (g)Fax No. | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| 3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 8(a) Building and Construction projects
| (b)Minor Project/Activity | NIL | (c)Category | B2 | (d)Proposal Number | SIA/RJ/MIS/121484/2019 | (e)Master Proposal Number(Single Window) | SW/121246/2019 | (f)EAC concerned (for category A Projects only) | INFRA-2 | (g)Project Type(New/Expansion/Modernization) | Expansion |
|
| 4. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
| Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Jaipur | Sanganer | Bilwa & Manpur Nagalya | | 5. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (c)Reason | -1 | (d)Supporting Document | NILL | |
| Location of the project | Scheme- Sahara City Homes, | | | Town / Village (Name of more than one town may be entered by separating with) | Bilwa & Manpur Nagalya | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Plot No. GH-02 | State | Rajasthan | District | Jaipur | Tehshil | Sanganer | Pincode | 302029 | Nearest railway station | Khatipura Railway Station | Distance from the project site | 10 | Nearest airport | Jaipur International Airport | Distance from the project site | 9 | Nearest Town/City/District Headquarters | Jaipur Development Association | Distance from the project site | 18 | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Nearest Village: Bilwa Kallan Village approx 0.5 km in WSW direction.
Nearest City Jaipur: Jaipur is located at a distance of approx. 18.00 Km in NNE | Upload GPS file | Copy of Kml File Uploaded GPS file | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | Brief summary of project | Uploaded Brief summary of project | | | Does your project location falls under out of any following areas | None of above Areas | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 41864.43 | Existing Built Up Area(In Meter /Sqr) | 61951.71 | Does it attract any of the general conditions given below? | No | | | Does it attract the specific condition given below? | No | | | Interlinked Projects | No | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | Forest land involved(hectares) | No Forest land is involved in Proposed Group Housing Project of M/s. Mahima Real Estate Pvt. Ltd. | | | Is there any litigation pending against the project? | No | | |
1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The proposed project (Phase-2) is a Group Housing Project on 41,662.01 sq. m. vacant land. (Land documents are enclosed).
There will be green-area development for
Phase-2 on area 7621.06 sq. m. (18.29 % of Planned area) to provide beautiful and natural environment to the site. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | The proposed site is an open land, with scanty vegetations mainly herbs and low lying shrubs & possesses existing no structure. Hence no clearance of structure and vegetation will be required.
Site photographs showing the present condition of the site has been enclosed. | 1.3 | Creation of new land uses? | No | As the project site is earmarked for group housing project; hence no change in land use is envisaged. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil investigation was carried out and the results were found satisfactory. | 1.5 | Construction works? | Yes | The construction activities will be confined within the project site; there will be no physical changes due to project development activities outside the project boundary. | 1.6 | Demolition works? | No | The proposed site is an open land, possesses no existing structure. Hence no demolition is required. | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | The construction activities will be confined within the project site only. Temporary local hutments will be provided to the workers including all the domestic facilities during construction phase. | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Excavation will be carried out for foundation and leveling. The total soil generated through digging will be used at the site itself for the purpose of development of project site and horticultural development. | 1.9 | Underground works including mining or tunneling? | No | No underground works including mining / tunneling is required except excavation of soil is required to be carried out for the purpose of construction. | 1.10 | Reclamation works? | No | No reclamation work required. | 1.11 | Dredging? | No | No dredging required, as case of construction of new Group Housing project. | 1.12 | Offshore structures? | No | No offshore structures required. | 1.13 | Production and manufacturing processes? | No | Since, it is a construction of residential project, hence, no production / manufacturing process shall be done in the project premises. | 1.14 | Facilities for storage of goods or materials? | Yes | • Separate raw material storage yard will be made during construction phase:
• Cement will be separately stored under cover in bales.
• Sand will be stacked neatly under tarpaulin cover.
• Bricks and steel will be laid in open
• The raw material handling yard will be located within the project site and separated by enclosures | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Solid Waste:
• The solid waste generated from the project (Phase-2) will be domestic in nature.
Construction Waste:
• Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material will be recycled and reused as granular sub base (GSB) layer of pavement. Earth rendered surplus from the excavation will be utilized in the embankment works.
Operational Phase:
SOLID WASTE GENERATION: - 604.2 kg/day
(i) From Residential population: 1246 X @450 gm /person/da | 1.16 | Facilities for long term housing of operational workers? | No | No facilities for long term housing of operational worker are proposed as this is construction project for construction worker temporary local hutments will be provided to the workers including all the domestic facilities during construction phase. | 1.17 | New road, rail or sea traffic during construction or operation? | No | The Project site has good connectivity to NH-12 connected to other cities.
Sanaganer Railway Station is approximately 11.5 km in NW direction & NH – 11 approx. 12.5 KM in NW direction from the Project Site.
The project site is well connected by network of roads leading to various parts of state. Thus, no new road will be laid during construction or operation of the project activities except internal roads & pathways for smooth movement of Vehicles & personals. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | The proposed site is well connected by roads to whole of the city; The nearest highway is NH-12 which is 0.3 km away from the project site. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | Not applicable, Since the site is connected to NH-12 which has low traffic density, there will be no need for diversion or closure of existing traffic routes. | 1.20 | New or diverted transmission lines or pipelines? | No | There will not be any provision for new or diverted transmission lines or pipelines for Proposed Group Housing Project. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses is proposed. | 1.22 | Stream crossings? | No | As, such no river or drain is passing through the project site. | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total water requirement of proposed project (Phase-2) will be 205 KLD, which will be included the fresh water requirement of 114 KLD and recycled treated water requirement of 91 KLD for flushing. Total waste water generation from the project (Phase-2) will be 152 KLD, which will be includes 80% of sewage generation from domestic uses and 100% of flushing uses. The total capacity of STP will be 200 KLD. Treated water recovery from STP in Phase-2 will be 137 KLD, out of which 61 KLD water will be | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | Runoff will increase due to increased paved surface. However, increased runoff will be managed by well designed rain water harvesting system and storm water management plan. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of personnel/ material during construction and operation phase are envisaged.
Road network for smooth flow of traffic and adequate parking space will be provided for operational phase.
During operational phase, total parking space 321 Car + 276 Two wheelers will be provided for Phase-2 of the project. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No long term dismantling/ decommissioning is Proposed. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | No decommissioning activity is involved, Thus no impact on the environment by the proposed project | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | All the workers employed / hired will be from nearby areas. Hence, there will be minor influx of people in the area. Temporarily approx 100-150 influx of labours at site during the construction phase and during operation phase approx 1420 Persons will be involved in the proposed project. | 1.29 | Introduction of alien species? | Yes | The landscaping will be carried out with mainly local species with a few ornamented varieties of flora that are well suited to the local condition like Ficus religiosa (Pipal), Saraca asoca (Ashok), Dalbargia sissoo (Shisham), Delonix regia (Gulmohar), Alostonia, scholaris (Saptparni), Phoenix sylvestris (Khajoor), Plumeria alba (Champa), Cassia fistula (Amaltas), Azadirachta indica (Neem), Thespesia populaenea (Paras pipal) etc. | 1.30 | Loss of native species or genetic diversity? | No | No loss of native species or genetic diversity has been reported so far. | 1.31 | Any other actions? | No | No other action will be undertaken except the above mentioned for proposed construction project | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | The Proposed Group Housing Project Phase-2 on 41,662.01 sq. m. Vacant land. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water requirement of proposed project (Phase-2) will be 205 KLD, which will be included the fresh water requirement of 114 KLD and recycled treated water requirement of 91 KLD for flushing. Total waste water generation from the project (Phase-2) will be 152 KLD, which will be includes 80% of sewage generation from domestic uses and 100% of flushing uses. The total capacity of STP will be 200 KLD. Treated water recovery from STP in Phase-2 will be 137 KLD, out of which 61 KLD water will be | 2.3 | Minerals (MT) | Yes | Sand and stone aggregates will be use as Construction material. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The conventional construction material will be used. Energy efficient building materials will be used as specified in the Energy Conservation Building Code. The major materials used for the construction of the proposed project shall be steel, cement, bricks, metal, flooring tiles/stones, sanitary and hardware items, electrical fittings and water etc.
Source: Steel and cement will be procured from authorized vendors.
Sand & aggregate will be procured from local material suppliers | 2.5 | Forests and timber (source – MT) | No | Timber required will be taken from near by markets. | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Electricity will be sourced from JVVNL
DG Sets will be used in case of power failure only.
Low sulphur diesel (HSD) will be used as fuel to run stand by D.G. sets. | 2.7 | Any other natural resources (use appropriate standard units) | No | No other natural resource will be involved in the project except the mentioned above. | |
3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | The proposed project is a Group Housing project, and hence no storage of hazardous chemicals (as per MSIHC rules) will be done, except HSD required to run standby D.G. sets, for which the quantity stored will be below the threshold limit specified in the MSIHC rules. Necessary permission will be obtained from the Explosives Dept. | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable drainage and waste management measures will be adopted in both construction and operational phase, which will restrict the stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Socio-economic standard of people will increase due to increase employment opportunity provided by this project. This will lead to better quality of life and will also set a standard for future development in the area. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | No effect is envisaged due to this project, as this is a Township Project. | 3.5 | Any other causes | No | No, other causes are involved except the mentioned above. | |
4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | No such spoil, overburden, or mine wastes will be generated as this is a Group Housing Project. There will be excavation activity done for construction of building. The total soil generated will be used at the site itself for the purpose of horticulture, landscaping, Backfilling activities. | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Solid wastes likely to be generated in Phase-2of the project are of domestic nature.
Domestic wastes amounting 604.2 kg/day will be collected from designated location and segregated into inorganic and organic wastes. The inorganic non- biodegradable wastes will be sold to vendors for recycling and the organic biodegradable wastes (waste vegetables, foods etc.) will be composted in Organic Waste Converter and converted into manure. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Spent Oil from D.G. sets will be carefully stored in High Density Poly Ethylene (HDPE) drums in isolated covered facility. This spent oil will be sold to vendors authorized for the treatment of same. Suitable care will be taken so that spills / leaks of spent oil from storage could be avoided.
Hazardous And Other Wastes (Management and Trans boundary Movement) Rules, 2016 | 4.4 | Other industrial process wastes | Yes | Not applicable, as this is a building construction project. | 4.5 | Surplus product | No | Not applicable, as this is a building construction project. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | The mechanism of sludge drying will be centrifuge and the dewatered/ dried sludge from STP will be converted to cakes and will be used as manures in horticulture after proper digestion. | 4.7 | Construction or demolition wastes | Yes | Construction waste generation will be limited to the construction phase only and will be limited to project site only. These will be reused for backfilling after manual segregation. Unusable and excess construction debris will be disposed at designated places in tune with the local norms. These wastes will be used for road development activities. | 4.8 | Redundant machinery or equipment | No | No Redundant machinery or equipment is involved. | 4.9 | Contaminated soils or other materials | No | No Contaminated soils or other materials are involved. | 4.10 | Agricultural wastes | No | No agricultural waste will be generated during construction phase. | 4.11 | Other solid wastes | No | Not applicable, as this is construction of Group Housing project. | |
5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The operation of proposed project does not envisage any major air pollutant generating sources except D.G. sets and vehicular movement. The emissions from stationary sources (D.G. sets) have been predicted. The DG sets will be the only source of Air emission Used during the operation phase in case of power failure. The DG Stacks of adequate height will be provided (as per the CPCB norms) to disperse the pollutants generated from D.G Sets.
The Pollution generated from the vehicular movement will | 5.2 | Emissions from production processes | No | No production process involved. Hence, there will be no such emission. | 5.3 | Emissions from materials handling including storage or transport | Yes | Small quantity of fugitive emission is envisaged during transport and handling of construction material. Such emission will be temporary and controlled by providing water sprinkling and other viable technique.
Regular water sprinkling & tarpaulin covers will be provided to prevent dust emissions. | 5.4 | Emissions from construction activities including plant and equipment | Yes | This will be restricted to the construction phase and to the construction site only. Though, it will be negligible in amount as it will occur from the equipments movement involved in the construction, still suitable preventive measure will be taken. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is likely to be generated during construction. Water sprinkler and tarpaulin covers will be provided over stored raw material to reduce dust emission.
On site sanitation facilities will be provided for construction workers during construction phase. Hence, no odor generation is envisaged. | 5.6 | Emissions from incineration of waste | No | Not applicable, as this is Group Housing project and there will be not any incineration waste involved in this project.
Not applicable, as this is a Group Housing project. So, Open burning of biomass / other material will be prohibited. | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not applicable, as this is a Group Housing project. So, Open burning of biomass / other material will be prohibited. | 5.8 | Emissions from any other sources | No | No other Emissions from any other sources, except mentioned above. | |
6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The machinery which will be used for construction will be of high standard and will adhere to international standard. These standards itself take care of noise pollution control / vibration control and air emission control. Hence insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities will be restricted to daytime only.
Sources of noise in the operational phase will be D.G. sets and from vehicular movements only. D.G. sets wil | 6.2 | From industrial or similar processes | No | No major noise and vibration generating activities are involved in the project, except due to running of various construction equipments/ machinery & D.G. Sets during renovation & expansion phase of the project. Proper maintenance of machineries will reduce the generation of noise and vibration. All the workers will be equipped with PPE’s during construction phase and the D.G. Sets will be installed in acoustic enclosures with proper padding system to reduce vibration impact. | 6.3 | From construction or demolition | Yes | Due to the various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:
• Excavation activities
• Concreting and mixing
• Construction plant
• Heavy vehicle movement and
• Operation of D.G. sets | 6.4 | From blasting or piling | No | No blasting or mechanized piling will be done as this a building construction project. | 6.5 | From construction or operational traffic | Yes | Some noise will be generated from vehicular movement in the construction and operational phase.
Local native plants will be use in tree plantation all around the project site and road side to reduce the impact of the air and Noise pollution. | 6.6 | From lighting or cooling systems | No | No significant noise impact will result from lightening or cooling system | 6.7 | From any other sources | No | There will be no other sources for noise & vibration generation except the mentioned above | |
7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The used oil from D.G Set will be carefully stored in HDPE drums at isolated storage and periodically sold to authorized recyclers. All precaution will be taken to avoid spillage from storage as per the Hazardous Wastes (Management, Handling & Tran boundary Movement) rules 2016 as amended time to time. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of untreated sewage on land. Adequate treatment of sewage will be carried out in STP of capacity 200 KLD for entire land area, proposed within the project premises. Treated sewage will be reused for flushing & green area development. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Minor Air emissions will be generated due to increased vehicular movement and occasional use of D.G. sets for which effective measures will be taken like adequate greenbelt development and use of low sulphur diesel in D.G. sets etc. So there would not be any deposition of pollutants emitted to air, land or water. | 7.4 | From any other sources | No | No any other sources are involved except the mentioned above. | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | Likelihood of such an event is not foreseen till now in the area and suitable measures will be adopt to control and reduce emission, so that there will be no such risk in the coming future. | |
8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | This is a Group Housing project and does not involve major hazardous construction activity. Hence chances of explosions, spillages, fires etc. are minimal.
During construction, suitable personal protective equipment will be provided to all construction workers as required under the health & safety norms. Awareness & Training about safety norms will be provided to all the supervisors and construction workers involved in construction activities
No major hazardous waste will be stored within p | 8.2 | From any other causes | No | No any other causes are involved except the mentioned above. | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The area is not prone to flood, landside. There has no report of earth quake and cloud burst in the area. Structural design has been done to take care of Seismic Zone requirements. | |
9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The proposed project is for Residential use; it may lead to development of supporting services and infrastructure in and around the area. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | Yes | Negligible impact is envisaged on air, noise and aesthetic parameters due to the proposed project. | 9.3 | Set a precedent for later developments | Yes | Not applicable | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | The proposed Group Housing Project. A better-planned and executed project has to yield better result individually | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | None, within 15 km of the proposed project site. | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Name of Place Distance in KM Direction form project site
Chandlai Talab ~5.0 SSE
Dravya Vati Nadi ~3.5 NNE
Jhalana Forest ~10.5 NNW
Chulgiri Hills Reserved Forest ~11.0 NNW
Jawahar Circle Garden ~12.0 NW
Jaldhara ~14.5 NNW
Smriti Van ~14.5 NNW | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Jhalana Safari Park located Approx 12.5 km in the NNW direction from the proposed project location | 4 | Inland, coastal, marine or underground waters | No | Not located within 15 km of the proposed project location | 5 | State, National boundaries | No | There is no State or National Boundary within 15 km. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Name of Place Distance in KM Direction form project site
NH-12 ~0.3 SW
Jaipur International Airport ~9.0 NNW
Jagatpura Railway Station ~10.5 NNW
Digi Malpura road ~11.0 WNW
Sanganer Railway Station ~11.5 NW
Khatipura Railway Station ~10.0 NNE
NH-11 ~12.5 NW | 7 | Defence installations | No | Not located within 15 km of the proposed project location | 8 | Densely populated or built-up area | Yes | Name of Place Population Distance in KM Direction form project site
Beelwa Kallan 4,403 ~0.5 WSW
Manpur Nagliya 696 ~1.5 SSE
Bas Bilwa 1,331 ~1.5 WNW
Rampura 2638 ~1.5 NNW
Patel Nagar 934 ~2.0 NW
Laxmipura 1467 ~2.5 SW
Murlipura 1,856 ~2.5 NW
Ramchandrapura 746 ~2.5 North
Prahladura 816 ~2.5 SE
Syampura Buhaniya 628 ~3.5 SW
Vidhani 731 ~3.5 NNE
Jaisinghpura Buhaniya 420 ~4.0 SW
Kheri Gokulpura 649 ~4.0 West
Saligrampura 721 ~4.0 ENE
Aswala 1927 ~4.5 WNW
Goner 3626 ~5.5 NE
Baksaw | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Name of Place Distance in KM Direction form project site
Bilwa Hospital ~1.5 WNW
Mahatma Gandhi Hospital ~2.5 NNW
Thakur Ji (Sitaram Ji) ka mandir, Keshyawal ~3.0 NE
Shree Madhrampura Balaji ~3.0 NE
Bhairu Ji Mandir, uhana Mandi Road ~5.0 NW
Narayana Hospital ~6.5 NW
Fortis Escorts Hospital ~12.5 NNW
Eternal Health Care Center Hospital, Malviya Nagar ~11.5 NNW
Jaipuriya Hospital ~13.5 NW
Roongta Hospital ~13.0 NNW
Apex Hospital, Malviya Nagar ~12.5 NNW | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Not located within 15 km of the proposed project location | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | No Environmental damage reported from the area so far. All parameters of Air, Water, and Noise etc. will be maintained within permissible limits specified by SPCB / CPCB with proper mitigation measures. | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The area under study falls in Zone-II, according to the Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures to mitigate the seismic impacts.
There are no possibilities of the proposed project site getting flooded as per records available. | | Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 04/11/2019 | EDS | EDS Letter | (2.) | 04/11/2019 | EDS | EDS Letter | (3.) | 07/12/2019 | The correction have been made as per the instruction received | | | Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | Name of Applicant | KAPIL RAISINGHANI | Designation | authorisedsignatory | Name of Company (Applicant Name should not be given here) | MAHIMA REAL ESTATE PVT LTD | Address | 4TH FLOOR, CRYSTAL PALM, 22 GODAM CIRCLE |
|
|