Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Commercial Project “Urban Square” Expansion Company/Organisation Name BHUMIKA ENTERPRISES PVT. LTD.
Registered Address 19 community centre 1st & 2nd floor East of kailash New Delhi,New Delhi,Delhi-110065 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Mohan Singh
(b)Designation (Owner/ Partner/ CEO) AS
(c)Address 19 community centre 1st & 2nd floor East of kailash New Delhi,New Delhi,Delhi-110065
(d)Pin code 110065
(e)E-mail urbansquare2019@gmail.com
(f)Telephone No. 11-41638121
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/RJ/MIS/120119/2019
(e)Master Proposal Number(Single Window) SW/120077/2019
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Expansion
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanUdaipurGirwaUdyog Vihar, Sukher
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Udaipur Rajasthan
Town / Village
(Name of more than one town may be entered by separating with)
Udyog Vihar, Sukher Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot No. F 210-F 223
State Rajasthan District Udaipur
Tehshil Girwa Pincode 313001
Nearest railway station Udaipur Railway Station Distance from the project site 7.2
Nearest airport Maharana Pratap Airport Distance from the project site 18.3
Nearest Town/City/District Headquarters Collectorate office Udaipur Distance from the project site 5.5
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) The proposed project site is under the jurisdiction of RIICO, Udaipur Rajasthan. Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 19,168.64 Existing Built Up Area(In Meter /Sqr) 70,536
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Land-use: The proposed expansion and modernization of existing project is coming up within a land duly converted for commercial purpose. No additional land is required for the proposed expansion. Copy of lease deed is enclosed as Annexure III. The project is coming up on a landconverted forcommercial complex. Copy of lease deedalong land conversion letter from RIICO is enclosed asAnnexure IV. Land cover: There will be slightchange in land cover which will not anticipate with any significant
1.2 Clearance of existing land, vegetation and buildings? No Land & Building: There will be no clearance of land or buildings for the proposed expansion of the project. Vegetation: No vegetation clearance is required for the proposed expansion project.
1.3 Creation of new land uses? Yes There will be slight change in land use which will not anticipate with any significant impact over the project. The proposal involves vertical expansion and modernization of existing block. However, the internal land-use break-up is given as under: Land use breakup S. N. Particulars Permissible Proposed 1. Total Plot Area 27,985 sq. m. 2. FAR Existing (proposed earlier in EC) FAR 3 (83,955 sq.m.) BAR 2 (55,970.00 sq. m.) Proposed Now FAR 1.24(34,872.09sq.m.)
1.4 Pre-construction investigations e.g. bore houses, soil testing? No There will be no physical impacts on the locality due to the soil testing or other pre-construction investigations.
1.5 Construction works? Yes The project will envisage a gross built up area of 89,704.64 sq. m. Anticipated Environmental Impacts on physical environment: • Increase in fugitive emissions during construction phase • Increase in traffic levels (construction & post construction phase) • Drainage • Landscape & Visual considerations The impact on physical environment will be temporary in terms of fugitive emissions. Best construction practices will be adhered to minimize the impacts.The same is tabulated as under: S
1.6 Demolition works? No There are no existing structures present at the site.
1.7 Temporary sites used for construction works or housing of construction workers? Yes The project is an expansion project and the housing facility (temporary) for construction workers will be provided, the same is used for the expansion. Adequate infrastructural facilities such as sanitation (including separate toilet (mobile) for male and female workers), drinking water, crèche, cooking fuel, cookers etc has been/will be provided to construction labours.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes The project will attain a maximum height of 42.05 m (up to up to terrace level). As it is an expansion project, no additional excavation/ earthwork are anticipated.
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? No Not Applicable
1.14 Facilities for storage of goods or materials? Yes The project is an expansion project and the temporary store room for the storage of construction materials which have been built earlier at the site are used for the proposed expansion, which will be removed later. Thus, the impact on physical environment will be temporal. During the operational phase, there will be well-designated confined storage areas within the building, which will not have impact on the physical environment.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: Waste generated during construction phase will be reutilized to the extent possible and will be disposed off through authorized vendors. About 27 kg/day of municipal solid waste will be generated which will be disposed off to the municipality disposal site. Post Construction Phase: The solid waste generated to the tune 1502 kg/day from the project considering full occupancy will be mainly municipal waste. The solid waste generated will be first segregated as plastic, g
1.16 Facilities for long term housing of operational workers? No There are no provisions of long term housing facilities for operational workers. Apart from residents there will be maintenance team along with security. The impact due to this will be negligible.
1.17 New road, rail or sea traffic during construction or operation? No There will be no new road and rail. In the post construction phase, there will be increase in the traffic levels due to proposed project. The traffic load due to the proposed project will be 1176ECUsincluding the traffic load contributed by visitors considering 100% occupancy. The parking details are as under: Parking required : 1030ECUs Parking provided : 1176ECUs Details of parking facilities envisaged within the project site is given as under: S. No. Details Cars Two wheelers Tota
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No There is no new rail, air-borne transport infrastructure required for the project.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Due to the upcoming project, there will be no closure or diversion of existing transport routes or infrastructures leading to changes in traffic movements.
1.20 New or diverted transmission lines or pipelines? No There will be no diversion of transmission and pipelines, though the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, sewer lines and internal power distribution lines.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No The project will not involve any impoundment, damming, culverting or realignment or other changes to the hydrology of watercourses or aquifers.
1.22 Stream crossings? No None
1.23 Abstraction or transfers of water from ground or surface waters? Yes The fresh water demand to the tune of about 236 KLD (86140 cu. m. / annum) will be met through Ground water supply. The area is falling under Girwa Block which is over exploited Block for ground water use. However, rain water harvesting has been devised to recharge the ground water aquifer. Provisions of capturing the maximum surface runoff and providing recharge to the tune of 13239 cu. m. per annum (maximum recharge) will be done through the5rain water harvesting pits.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Water body: There is no water body in and around project premises. Land Surface Run-off: The land surface affecting the drainage will be altered (retaining the same direction - though slope will be made gentle), however the impact will be confined to the site. There will be increase in total surface run-off during post construction phase, which will be capturing through well designed storm-water pipe network of rain-water harvesting and will be used for recharge of the aquifers.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Construction: There will be movement of personnel, materials and machineries during the construction phase. The impact due to the movement of personnel will be negligible as local people will be deployed and temporary housing facility will be provided for outside workers. The construction material and machinery required will be mobilized from the local area. Thus, there will be contribution of marginal noise & vehicular emissions which will be mitigated by implementation of effective EMP. The
1.26 Long-term dismantling or decommissioning or restoration works? No Restoration works for the project on long-term will be an ongoing activity which will not have any impact on physical environment.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No There will be no decommissioning activity related to the project.
1.28 Influx of people to an area in either temporarily or permanently? Yes During the construction phase, there will be inward and outward movement of local labour in the construction site, this will be an ongoing temporary activity and will not call for permanent influx of people. However, during the post construction phase, there will be permanent influx of persons. There will be regular movement of shopkeepers, visitors, staff related personals.
1.29 Introduction of alien species? No Only local plant species will be planted for the green belt /landscaping.
1.30 Loss of native species or genetic diversity? No No endangered, threatened or endemic species exists in the study area, so inconsequential impact is visualized on the flora and fauna of the project site.
1.31 Any other actions? No None
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes The total plot area envisaged for the project is about 27,985 sq. m.
2.2 Water (expected source & competing users) unit: KLD Yes As under: Particular Demand Source Fresh water 278 KLD Municipal/Ground water supply Treated water 303 KLD Treated water from (STP) Total- 581 KLD The competing users are varied.
2.3 Minerals (MT) Yes Bricks and stone (locally available in the market)
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The approximate quantities of construction materials to be used. Material Source Coarse aggregate Nearest market Fine aggregate Cement (PPC/ OPC) Structural Steel Bricks
2.5 Forests and timber (source – MT) Yes The use of wood in the project has been planned to the minimum extent possible. Wood with recycled content such as MDF boards will be used to the extent possible.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes As under: Source of supply 33 kV AVVNL GSS Proposed earlier Proposed Now Electrical Load Connected load 6412 KW 7299 KW Maximum demand 3888 KW 5020 KW Transformer: Number 2 nos. 3 nos. Capacity 2000kVA 2500kVA DG Sets: 5 nos. 5 nos. Number Capacity 1500 kVA: 2nos. 1500kVA:4nos 500kVA : 2nos. 1010kVA:1no. 640KVA
2.7 Any other natural resources (use appropriate standard units) No No other natural resources will be used.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes There will be storage ofLow Sulphur Diesel (HSD) for the project. This will not call for any approval from CIF&B as it is less than prescribed threshold limit. The significant hazard due to the same will be negligible as the exposure level will be confined within a small area in the consequence of unforeseen hazard.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No There will be no release of any hazardous substance in the construction as well as post-construction phase. The waste water generated to the tune of 336 KLD will be treated in STP of capacity 400 KLD based on MBBR technology. Further, storm water network will be well designed to leave no stagnant water pockets. The biodegradable as well as non- biodegradable waste will be collected at earmarked places and will be sent to the Municipality disposal sites. Proper sanitization will be done to
3.3 Affect the welfare of people e.g. by changing living conditions? No There will be proper treatment of the solid as well as liquid waste generated and the waste will not be dumped in the nearby localities thereby, causing change in the living conditions. The solid waste will be suitably treated, while the liquid effluent will be treated in the sewage treatment plant.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No The project planning will be done to avoid any adverse impact by means of proper waste management during construction as well as operation phase.
3.5 Any other causes No none
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Municipal solid waste generated during the post construction phase is 1502 kg/day. Thedetails of the various activities generating solid waste, its classification, collection facilities, treatment and disposal are given in CP& EMP.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No Construction Phase: No hazardous waste as per HWMR will be generated. Post Construction/ Operational Phase: Spent oil (<2 KL / annum) will be generated which will be carefully stored in High Density Polythene (HDPE) drums in isolated covered facility and will be disposed off to the registered actual users. Suitable care will be taken so that spills/leaks of spent oil from storage could be avoided.
4.4 Other industrial process wastes No There is no industrial process waste.
4.5 Surplus product No No surplus product is anticipated
4.6 Sewage sludge or other sludge from effluent treatment Yes About 27 KLD sludge will be generated from STP.
4.7 Construction or demolition wastes Yes About 5382 MT of the construction waste will be generated, which will be sold to the vendors for recycling and reuse at the best possible extent. Details are elaborated in CP&EMP.
4.8 Redundant machinery or equipment No There will not be any redundant machinery or equipment at site.
4.9 Contaminated soils or other materials No Proper care will be taken to avoid contaminated soil and if oil spilled soil will be found; the same will be scrapped off and stored at earmarked places and sent to disposal sites.
4.10 Agricultural wastes No There will be no agriculture waste.
4.11 Other solid wastes No There will be no other solid waste.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes There will be emissions from DG sets (used in the case of power cuts or failure only).The maximum predicted concentrations from the proposed project considering line (vehicular exhausts) as well as point source (DG set of cumulative capacity 7010kVA) emissions are as under:- Mitigation measures: • Effective stack height of 50m above roof of DG house will be provided to contain the emissions within the permissible norms. • Around 12.97 % (3630.15 sq. m.) will be under landscape which wil
5.2 Emissions from production processes No There is no production process in the project.
5.3 Emissions from materials handling including storage or transport Yes The emission expected from construction phase will be dust arising from material handling and vehicular emission from transport vehicles. These include the emissions due to idling of the vehicles during loading and unloading activities. Management: The same is explained at point no. 1.5 above, Form 1.
5.4 Emissions from construction activities including plant and equipment Yes The dust emission sources are: • Excavation • Haul-road movements • Construction • Material Handling • Finishing Emissions factors for construction equipment are given in table below: Equipment Emissions Factors (g/hr) CO VOC NOX SOX PM10 Excavator 214.09 43.99 516.18 3.31 27.21 Backhoe/ 190.05 56.69 370.13 1.58 37.64 Front end loader Rubber 161.02 39.00 464.02 2.67 23.58 tired crane Concrete 72.57 13.60 122.46 0 4.53 vibrator Pavi
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The dust etc. emanating from various construction activities are described along with the impact & mitigation measures are given in CP & EMP.
5.6 Emissions from incineration of waste No There will be no incineration of waste.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No open burning of waste will be allowed. The civil contractor along with site manager will be responsible for the same.
5.8 Emissions from any other sources No None
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise may be generated from the construction equipment’s and operation of DG set. Noise levels from the construction equipments will be as: Name of Source Noise Level Noise level at 16 m (50 ft) from at 1 m from Source in db (A) source in dB (A) Back hoe/ Loader 81 105 Cranes mobile 81 105 Dump truck 83 107 Generator Not considered 75 (as
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition Yes During construction: During construction/Demolition work D.G. Sets, Pumps, Trucks, vibrators, drilling machine, etc will be the tentative sources of noise. The same will be mitigated by effective EMP such as use of Ready mix concrete to reduce the noise & vibrations due to the operation of concrete mixer truck, etc.
6.4 From blasting or piling No Blasting operations are not envisaged in the proposed project.
6.5 From construction or operational traffic Yes There may be increase in the noise levels due to constructional /operational traffic arising due to the project, which will be minimized by: • Effective traffic management including sufficient width of drivewaysto avoid traffic congestions especially during the peak hours. • Provisions of separate entry/ exits to avoid traffic congestions during peak traffic hours. • Provisions of internalized designated parking facilities to ensure smooth traffic movement. • Effective green belt12.97 % (363
6.6 From lighting or cooling systems Yes There will be change in the light pollution level of the project area. Use of focused lights to the active areas of construction is envisaged. Further, there will be no sky-lighting during the construction as well as post-construction phase. Lighting Power Density (LPD) for the external lighting system is calculated as given below and the same is under the allowable LPD as per ASHRAE 90.1: 2007. However, solar lighting will be used for streets.
6.7 From any other sources No None
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The project will not involve any handling and storage of hazardous material.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no risk of contamination of land and water due to discharge of untreated waste-water as no untreated sewage will be discharged into the open surfaces causing the contamination of ground water. The wastewater generated will be treated in STP with capacity of 400 KLD. The excessive treated water will be supplied to the nearby farm lands.
7.3 By deposition of pollutants emitted to air into the land or into water No During construction, there will be emissions generated from excavation, material transfer, construction operations, finishing operations, road construction, exhaust from vehicles, and stationary sources, etc. The management of the same has been described at relevant sections.
7.4 From any other sources No There will not be any other sources, which will contaminate land & water resources.
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No significant contribution of long-term built-up of pollutants is envisaged from this project.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No There will be no hazardous substance or chemical used in the proposed project. However, spent oil from DG set will be generated which will be stored in the spent oil tank prior to disposal to actual users at earmarked places. The fuel used in the DG sets will be stored in the inbuilt storage tanks which will be designed to meet out all safety norms. However, Adequate fire safety measures will be adopted at site : a. Good construction practises b. All Safe construction practices & precaution
8.2 From any other causes Yes The major risks involved in the project would be working at different construction heights and mishaps due to human errors, bad construction practices and associated electric hazards. All safety measures will be in place prior to commencement of operations so as to avoid any risk to human life and as per the prevailing local by laws. Sources of Construction & Post Construction Risks along with Impact & Mitigation of the same is given in CP & EMP.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Natural Disasters- flood Occurrence Probability- As per the secondary data available no such precedents has been reported. However the possibility of such incidents cannot be ruled out. Management- • For effective functioning, pre-monsoon and post-monsoon checks of the drainage structures will be undertaken • The project has planned storm water layout in regards to the peak intensity of the rainfall so far received as recorded by IMD. Natural Disasters- Earth-quakes Occurrence Probability-
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The project may lead to adjuvant development at the site. With coming up of the project supporting infrastructure such as sewerage lines (as a part of External development) will be developed.
9.2 Lead to after-use of the site, which could have an impact on the environment No No lead to after use of the site, which could have an impact on environment
9.3 Set a precedent for later developments No There are no precedents as similar developments are proposed around.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes The cumulative effects of the other planned projects may have positive impacts such a better drainage facilities, better recharge into the ground water aquifers by capturing the run-off, tree plantation in the area, etc.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Palace of Maharana Pratap : 6.9 km towards SSW*
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Forest Dhenkli R.F.-4.8 km towards ENE Amberi P.F.-4.8 km towards NNE Nauva R.F. -7.3 km towards NE Kherad R.F.-10.0 km towards NE Rama P.F.-6.4 km towards NNW Jhindoli R.F.- 10.6 km towards NW Rama R.F.-7.8 km towards NW Tiklia P.F.- 3.4 km towards WSW ThoriaMagra P.F.-4.6 km towards SW Pandwa P.F.-5.2 km towards WSW Makreda P.F.-8.1 km towards W Paga R.F.-12.7 km towards WSW Kalir R.F.-10.3 km towards WSW Bara Magra R.F.-8.1 km towards ESE R.F.-12.0 km towards ESE Seg
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None within the study area
4 Inland, coastal, marine or underground waters No None within the study area
5 State, National boundaries No None
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes As under: Name Distance (aerial) Direction NH 8 Nearby gate - NH 76 3.3 km towards NE SH 32 2.66 km towards WSW
7 Defence installations No None
8 Densely populated or built-up area Yes Badla 1.3 km towards W
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes As under: Name Distance with Direction Educational Facilities Govt Senior Sec. School 0.42 km towards SSW Witty International School 0.85 km towards NE Govt School 1.0 km towards NE Medical Facilities Sharma Multispecialty Hospital 0.9 km towards SSW Mewar hospital Udaipur 1.7 km towards WSW Places of Worship Tarkeshwar Mahadev Temple 0.93 km towards SSW Mahadev Temple 1.0 km towards SSE
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Girwa The entire block is categorized as Over exploited for ground water use.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not Applicable
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The area is classified as Zone II (Low Damage Risk Zone) as per the BIS classification. Suitable seismic coefficients in horizontal and vertical directions respectively will be adopted while designing the structures.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)21/10/2019EDSEDS Letter
(2.)12/12/2019The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMohan Singh
DesignationAS
Name of Company (Applicant Name should not be given here)BHUMIKA ENTERPRISES PVT. LTD.
Address19 community centre 1st & 2nd floor East of kailash New Delhi
Print