Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Ekalsingha Granite mine
(b)Name of the Company / Organisation SH.KANARAM KHATIK
(c)Registered Address Nagaur,,Nagaur,Rajasthan-341505
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Kanaram Khatik
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address Nagaur,,Makrana,Nagaur,Rajasthan-341505
(d)Pin code 341505
(e)E-mail kanaramk@hotmail.com
(f)Telephone No. 294-2492060
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/58123/2019
(e)Master Proposal Number(Single Window) SW/182169/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No.
(b)Pincode
(c)Bounded Latitudes (North)
From
Degree
Minutes
Second
From
Degree
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree
Minutes
Second
From
Degree
Minutes
Second
(e)Survey of India Topo Sheet No.
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL)
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area
(j)Seismic Zone
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanAjmerKekriEkalsingha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number F1(4) SEIAA/SEC-RAJ/Sectt/PROJECT/CAT. 1 (a) B2 (1
(b)Date of Apply of TOR 16 Jul 2019
(c)Date of Issue of TOR / Standard ToR 20 Mar 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :2
RAJIV GANDHI SEVA KENDRA
State :Rajasthan
District :Ajmer
Tehsil :Kekri
Village :LASADIYA
20RO, RPCB, Kishangarh Details on requirement of skilled- unskilled persons in the proposed mining project. Proposed each mining project will require 40-60 workers, out of which 20 will be skilled andOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Jack Hammer (1 NOS)32MM
(2.)Poklen (2 NOS)148 HP
(3.)DUMPER (4 NOS)75 HP
(4.)Compressor (1 NOS)62.5 HP
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MINING (1.0380 HA)85750Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ?
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue NA
(iv)Valid Upto NA
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores)
(b) Funds Allocated for Environment Management (Capital) (in crores)
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores)
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores)
(e) Funds Allocated for Environment Management Capital(%)
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)00Kilo Litre per DayNARoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.950.177.32100
(2.)SO2Micro Gram per Meter Cube11.98.510.8580
(3.)PM2.5Micro Gram per Meter Cube45.930.544.9860
(4.)NOxMicro Gram per Meter Cube16.712.416.3680
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)Heavy MetalsIRON (As Fe)mg/l0.2550.2150.30.3
(3.)pHNA7.237.118.58.5
(4.)TDSmg/l153012765002000
(5.)Total Hardnessmg/l502494200600
(6.)Fluoridemg/l0.980.811.01.5
(7.)Chloridesmg/l263.80228.122501000
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.84.65A
(2.)pHNA7.287.19A
(3.)BODmg/l5.604.0A
(4.)CODmg/l26.018.50A
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.651.655
(2.)Leq(Night)A-weighted decibels(dB(A))39.937.445
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram0.020.01
(2.)P(Phosphorus)Milligram per Kilogram1210.8
(3.)K(Potassium)Milligram per Kilogram238.60234.20
(4.)pH7.977.21
(5.)Electric ConductivityMillisiemens per Centimetre382.0342
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 80 To 85
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 70 To 80
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersNEARBY VILLAGES52.0 Not Appliacble modeOthersWATER TANKERSOthersPITS, OPEN WELL16542/2019-20/1202120 Mar 20205
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC1.00SEPTIC TANKOthersSOAK PIT01
16.1.
(a)Total Waste Water Generation 1
(b)Total Discharged Water 1
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MINERAL REJECTOthersOVERBURDEN40044Tons0RoadOthersDUMP
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00000
(2.)SO2Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)PM10Microgram per Meter Cube68.3003.071.3100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.0380
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.0380
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 26044.5768
(b)Waste/Barren Land 4542.11
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 832.57
(e)Settlements 595.11
(f)Industrial 60.24
(g)Forest 147.06
(h)Mangroves 0
(i)Marine Area 0
(j)Others : OPEN SCRUB 2075.64
    Total 34297.306800000006
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Water Reservoir0.7
(2.)OthersNON UTILIZED0.338
Total 1.038
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)CorridorsNA0NA
(6.)ESZsNA0NA
(7.)WLSNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.038
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area DAIN RIVER
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 2.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 11
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 10
(e)No. of working days 250
(f)Total Manpower 21
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 3.192
(b)Percentage of Total Project Area 307.51
(c)No. of Plants to be Planted 3192
(d)Funds Allocated for Plantation 120000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEMPLOYMENT GENERATION
(2.)FinancialREVENUE GENERATION
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)GRANITEMinor
2.
Mine Capacity in ROM (Run of Mine) 85750
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/Aj/Mining Plan/F-S-40/2019/1367
(b)Date of Approval 13 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1.0380
(f)Approved Capacity 85750
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 493881
(b)Mineable Reserves (Million Ton) 411567
(c)Extractable Reserves(Million Ton) 349832
(d)Percent(%) of Extraction 85
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.0380
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 15 Jan 2019
(iii)Validity of LOI 1.5
(iv)Reference No. of LOI SME/SAWAR/ML107/2018/657
(c)Whether Lease Deed Executed ? No
(i)Reason thereof LOI GRANTED
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof EC IN PROCESS
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.0435
(iii)Height (in meter) 6
(iv)Quantity (in Million Cubic meter) 14301.43
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 2950
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 2950
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0.7
(b)Depth (in meter) 20
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0.7 (hectare) at a Depth of 20 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.0380
13.
Details of Transportation:
(a)In Pit/Underground to Surface dumper
(b)Surface to Siding/Loading excavator
(c)Transportation / Conveyor Details dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND000
(3.)SETTLEMENTS000
(4.)WASTE LAND1.038001.038
(5.)SURFACE WATER BODIES000
(6.)GRAZING LAND000
TOTAL1.03801.038
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)VIRGIN AREA0.338000.338
(2.)EXTERNAL OB DUMPS0000
(3.)INTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)GREEN BELT0000
(7.)TOP SOIL STORAGE0000
(8.)EXCAVATION/QUARRY00.700.7
TOTAL0.3380.7001.038
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0.338
(e)Final Void of 0.7 (hectare) at a Depth of 20 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 2.854
(h)Total afforestation plant (in hectare) 3.192
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2019008575000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0151
(ii)Name of the EIA Consultant COGNIZANCE RESEARCH INDIA PVT LTD
(iii)Address GT-20, Sec – 117, Noida – 201301. (U.P)
(iv)Mobile No. 9414110360
(v)Landline No. 9414110360
(vi)Email Id cognizanceresearchindiapl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 03 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)10/11/2020After examination of the proposal, follo1wing discrepancies are found:- 1. District survey report as per MOEF notification is not submitted. 2. Copy of approved mining plan not submitted. 3. Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant as well as by PP is not submitted
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKanaram Khatik
DesignationOwner
Name of Company (Applicant Name should not be given here)SH.KANARAM KHATIK
AddressNagaur
Print