Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Thob Selenite Mine, M.L. No. 02/1998 (M.L. Area –90.4966 Ha) with existing Selenite production capacity 50,000 TPA and 25 TPH Rotary Screen at Village: Thob, Tehsil: Pachpadra, District: Barmer (Raja
(b)Name of the Company / Organisation JK WHITE CEMENT WORKS GOTAN UNIT OF JK CEMENT LTD
(c)Registered Address VOP- Gotan, Teh-Merta City,,Nagaur,Rajasthan-342902
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Sharma
(b)Designation (Owner/ Partner/ CEO) Unit Head
(c)Address VOP- Gotan, Teh- Mertacity, District-Nagaur, 342902,,Mertacity,Nagaur,Rajasthan-342902
(d)Pin code 342902
(e)E-mail environment@jkcement.com
(f)Telephone No. 1591-231324
(g)Fax No. 01591230206
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/52329/2018
(e)Master Proposal Number(Single Window) SW/148743/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 02/1998 and ML Area 90.4966
(b)Pincode 342902
(c)Bounded Latitudes (North)
From
Degree 26.033353
Minutes
Second
From
Degree 26.04.1915
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.240165
Minutes
Second
From
Degree 72.250215
Minutes
Second
(e)Survey of India Topo Sheet No. 4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 144
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanBarmerPachpadraThob
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number F1 (4)/SEIAA/SEAC-Raj /Sectt/Project/Cat. 1(a) .B1
(b)Date of Apply of TOR 31 Jan 2019
(c)Date of Issue of TOR / Standard ToR 07 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :1.0
Village Panchayat Headquarter Thob
State :Rajasthan
District :Barmer
Tehsil :Pachpadra
Village :Thob
80Employment, Plantation, Pollution, Health facilityOthersShri Krishan Kanhiya Goyal, Additional Director, Public Service, Barmer (Nominated representative by District Collector)
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)JCB0.6 cum 1 Number
(2.)Dumpers20 MT 5 Numbers
(3.)Tractor Scrappers40 HP 1 Number
(4.)Rotary screen with 2 conveyors, Screen 6mm sieve25 TPH 1 Number
(5.)Hydraulic Excavator0.9 cum 1 Number
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Selenite50000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 16 Jan 2016
(iv)Valid Upto 31 Dec 2018
(v)File No. F(Mines)/Barmer (Pachpadra)/1847(1)/2015-2016/6490
(vi)Application No. 26102015
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.20
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.050
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0020
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.020
(e) Funds Allocated for Environment Management Capital(%) 25.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel10Kilo Litre per DayLocalRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 Mar 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube85.766.985.324100
(2.)PM2.5Micro Gram per Meter Cube52.635.952.26660
(3.)SO2Micro Gram per Meter Cube11.35.411.18280
(4.)NOxMicro Gram per Meter Cube24.413.424.1880
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l311.1814.142501000
(2.)Total Hardnessmg/l354.9091.0200600
(3.)TSSmg/l0.00.01.01.0
(4.)Fluoridemg/l1.090.261.01.5
(5.)pHOthersOther7.086.906.58.5
(6.)TDSmg/l12161845002000
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersOthers0.00.0A
(2.)BODmg/l00C
(3.)DOmg/l00B
(4.)CODmg/l00D
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.251.4I 70-75, C 55-65, R 45-55, S 40-50
(2.)Leq(Night)A-weighted decibels(dB(A))44.140.2I 70-75, C 55-65, R 45-55, S 40-50
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare32.4012.66
(2.)pH8.587.49
(3.)N(Nitrogen)Kilogram per hectare156.2953.29
(4.)K(Potassium)Kilogram per hectare656.37129.66
(5.)Electric ConductivityMillisiemens per Centimetre20.870.07
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 27 To 32
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 17 To 27
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPHED WELLS AND MINE SUMP50Copy of Permission LetterPipelineOthersMINE SUMPNOT APPLICABLE24 Sep 20185
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water0.40.4Waste will be disposed into soak pit via septic tank, if generatedGreen Belt Renewal Plant0.4
16.1.
(a)Total Waste Water Generation 0.4
(b)Total Discharged Water 0
(c)Total Reused Water 0.4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersOverburden92857.2Tons0OthersUsed in backfillingOthersBackfilling
(2.)SoilOthersTop Soil127380.29Tons0Road,OthersUsed in Plantation purposeOthersUsed in plantation purpose
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube000080
(2.)PM2.5Microgram per Meter Cube000060
(3.)PM10Microgram per Meter Cube51.70.111.4853.18100
(4.)NOxMicrogram per Meter Cube000080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11
(b)Source Rajasthan State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 63.0266
(c)Government Land 27.4700
(d)Revenue Land 0
(e)Other Land 0
    Total Land 90.4966
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 63.0266
(b)Waste/Barren Land 27.4700
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : No Other Land 0
    Total 90.4966
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt32.327Back filled and Greenbelt area
(2.)LandFill58.1696Public use
Total 90.4966
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNone10No Corridors within 10 km radius of Mine Site
(2.)ESZsNone10No ESZs within 10 km radius of Mine Site
(3.)ESAsNone10No ESAs within 10 km radius of Mine Site
(4.)NPANone10No NPA within 10 km radius of Mine Site
(5.)Critically Polluted AreaNone10No CPA within 10 km radius of Mine Site
(6.)Wildlife CorridorsNone10No Wildlife Corridors within 10 km radius of Mine Site
(7.)WLSNone10No WLS within 10 km radius of Mine Site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone10None
(2.)Archaeological SitesNone10None
(3.)Defence InstallationsNone10None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 90.4966
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jojri Naadi
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 9
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 39
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 32.327
(b)Percentage of Total Project Area 35.72
(c)No. of Plants to be Planted 30837
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAt the conceptual stage, out of the total mining lease area (i.e. 90.4966 ha), total mined-out area will be around 85.6396 ha, About 32.327 ha (35%), out of which 27.4700 ha area will be developed in
(2.)EnvironmentalAt the conceptual, out of the total lease area (90.4966 ha), total mined-out area will be 85.6396 ha, About 32.327 ha (35%), out of which 27.4700 ha in Afforestation on backfilled area and 4.857 ha in
(3.)SocialPP will undertake activities for the upliftment of the social community through community development in Education, Health, Women Empowerment & Vocational Training, Infrastructure development etc
(4.)FinancialThe Mining project will provide the direct & indirect Job opportunities to the local people who will improve the earning and spending capacity of the people. The project will contribute additional rev
(5.)FinancialThe Mining project will provide the direct & indirect Job opportunities to local for improve the earning, spending capacity of people, also will contribute add revenue to State, Central Govt. in form
(6.)OthersThe project has positive employment and income effects, both direct as well as indirect. Manpower (39) is required for mining operations & other mining related activities and Preference will be given
(7.)EnvironmentalAt the conceptual, out of the total lease area (90.4966 ha), total mined-out area will be 85.6396 ha, About 32.327 ha (35%), out of which 27.4700 ha area will be developed in Afforestation on backfill
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SeleniteMajor
2.
Mine Capacity in ROM (Run of Mine) 50000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1762)/2018-RCM-AJM
(b)Date of Approval 05 Dec 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 90.4966
(f)Approved Capacity 50000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.38
(b)Mineable Reserves (Million Ton) 0.35
(c)Extractable Reserves(Million Ton) 0.35
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 35
(f)Stripping Ratio 1 : 0.538
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 7.6
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area Yes
(b)Beneficiation / Washing Technology Rotary screen with 2 conveyors, Screen 6 mm size s
(c)Capacity 25
(d)Whether it is proposed to install crusher within the mining lease area Yes
(e)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)125 Rotary screen with 2 conveyors, Screen 6 mm size sieve
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 90.4966
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 02 Jul 1998
(iii)Validity of LOI 50
(iv)Reference No. of LOI P (17) (19) Khan/Gr. I/98
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 169.48
(iii)Validity of the lease deed From : 12 Mar 2015 To : 12 Mar 2065
(iv)Date of Execution of Mining Lese 12 Mar 2015
(v)Reference Number kha/baad/pradhan/ML/2/98/95
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 25 Mar 2015 From : 13 Mar 2015 To : 12 Mar 2065 Copy of Earlier Leasekha/baad/pradhan/ML/2/98/95 90.4966
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 856394
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 856394
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 85.6396 (hectare) at a Depth of 4 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 90.4966
13.
Details of Transportation:
(a)In Pit/Underground to Surface Nil
(b)Surface to Siding/Loading Nil
(c)Transportation / Conveyor Details Minerals will be transported to cement plant by du
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND63.0266063.0266
(2.)OTHERS(Specify)Government Land27.47027.47
(3.)GRAZING LAND000
(4.)SURFACE WATER BODIES000
(5.)SETTLEMENTS000
(6.)WASTE LAND000
(7.)FOREST LAND000
TOTAL90.4966090.4966
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY27.470058.169685.6396
(2.)INTERNAL OB DUMPS0000
(3.)BUILT UP AREA (COLONY/OFFICE)0000
(4.)GREEN BELT4.857004.857
(5.)TOP SOIL STORAGE0000
(6.)ROADS0000
(7.)VIRGIN AREA0000
(8.)EXTERNAL OB DUMPS0000
TOTAL32.327058.1696090.4966
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 90.4966
(d)Safety Zone(in hectare) 3.753
(e)Final Void of 0 (hectare) at a Depth of 4 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 32.327
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20110.050.00.0500
(2.)20130.050.00.0500
(3.)20150.050.00.0500
(4.)20140.050.00.0500
(5.)20120.050.00.0500
(6.)20170.050.050.050.0085750
(7.)20160.050.050.050.0003000
(8.)20180.050.050.050.0001500
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Rajasthan
(d)Case No. Civil Writ No. 10618/2016 dated 29.09.2016
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Stay on effect and operation of letter issued by M
(f)Case Details NA
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 097
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)27/04/2020Your proposal/project has been examined and you are requested to submit hard copy via speedpost directly to SEIAA because of covid-19 lockdown.
(2.)25/06/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Sharma
DesignationUnit Head
Name of Company (Applicant Name should not be given here)JK WHITE CEMENT WORKS GOTAN UNIT OF JK CEMENT LTD
AddressVOP- Gotan, Teh-Merta City