Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kantharia China Clay Mine, M.L. No. 01/2001 (M.L. Area - 51.03 Ha) with existing China Clay production capacity 1,02,000 TPA and modernization in mining method from manual to mechanized without drill
(b)Name of the Company / Organisation JK WHITE CEMENT WORKS GOTAN UNIT OF JK CEMENT LTD
(c)Registered Address VOP- Gotan, Teh-Merta City,,Nagaur,Rajasthan-342902
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Rajeev Sharma
(b)Designation (Owner/ Partner/ CEO) Unit Head
(c)Address VOP- Gotan, Teh- Mertacity, District-Nagaur, 342902,,Mertacity,Nagaur,Rajasthan-342902
(d)Pin code 342902
(e)E-mail environment@jkcement.com
(f)Telephone No. 1591-231324
(g)Fax No. 01591230206
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/51029/2018
(e)Master Proposal Number(Single Window) SW/142995/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. M.L. No. 01/2001 (M.L. Area - 51.03 Ha)
(b)Pincode 342902
(c)Bounded Latitudes (North)
From
Degree 24.7558
Minutes
Second
From
Degree 24.7591
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.5878
Minutes
Second
From
Degree 74.5991
Minutes
Second
(e)Survey of India Topo Sheet No. G43U9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 476
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanchittorgarhchittorgarhKantharia
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 15529
(b)Date of Apply of TOR 03 Oct 2018
(c)Date of Issue of TOR / Standard ToR 07 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :27 Oct 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :0
Near ML Area in Kantharia
State :Rajasthan
District :chittorgarh
Tehsil :chittorgarh
Village :Kantharia
110Employment, Social, Environmental IssuesOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Loader0.9
(2.)Dumper (OB)20
(3.)Dumper (ore)20
(4.)Excavator1.5
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Modernization in Mining Method102000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 13 Oct 2016
(iv)Valid Upto 30 Nov 2018
(v)File No. 7726
(vi)Application No. F(Mines)/Chittorgarh (Chittorgarh)/4019(1)/2016-20
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.80
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.04
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.02
(e) Funds Allocated for Environment Management Capital(%) 5.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 80
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 80
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel80Kilo Litre per DayLocalRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube88.254.287.2100
(2.)PM2.5Micro Gram per Meter Cube46.722.546.260
(3.)SO2Micro Gram per Meter Cube15.27.515.0480
(4.)NOxMicro Gram per Meter Cube2815.227.7480
(5.)OthersCOMicro Gram per Meter Cube0.750.600.744
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.226.866.58.5
(2.)Chloridesmg/l202.7435.362501000
(3.)TDSmg/l9144365002000
(4.)Total Hardnessmg/l527.80268.45200600
(5.)Fluoridemg/l0.750.251.01.5
(6.)OthersIronmg/l0.180.081.00
(7.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l8.000C
(2.)CODmg/l26.640C
(3.)pHNA7.850C
(4.)DOmg/l4.600C
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.851.8I 70-75, C 55-65, R 45-55, S 40-50
(2.)Leq(Night)A-weighted decibels(dB(A))44.540.4I 70-75, C 55-65, R 45-55, S 40-50
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.137.17
(2.)K(Potassium)Kilogram per hectare246.60104.20
(3.)Electric Conductivity00
(4.)P(Phosphorus)Kilogram per hectare23.7012.78
(5.)N(Nitrogen)Kilogram per hectare109.6878.38
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 135 To 145
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 125 To 135
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPHED WELLS AND MINE SUMP70 Not Appliacble PipelineOthersMINE SUMPNot Applicable01 Jan 20197
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water22Waste will be disposed into soak pit via septic tankGreen Belt Renewal Plant2
16.1.
(a)Total Waste Water Generation 2
(b)Total Discharged Water 0
(c)Total Reused Water 2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over BurdenIndustrial Waste49172Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)SoilIndustrial Waste16391Tons0RoadOthersGreenbelt Plantation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)COMicrogram per Meter Cube0.75000.754
(2.)PM2.5Microgram per Meter Cube46.70046.760
(3.)NOxMicrogram per Meter Cube28.00028.080
(4.)PM10Microgram per Meter Cube88.200.4488.64100
(5.)SO2Microgram per Meter Cube15.20015.280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source Not Applicable
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 30.80
(c)Government Land 20.23
(d)Revenue Land 0
(e)Other Land 0
    Total Land 51.03
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 30.8
(b)Waste/Barren Land 20.23
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Not Applicable 0
    Total 51.03
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt12.98
(2.)Safety Zone0.48Roads
(3.)Water Reservoir26.342
(4.)LandFill3.850
(5.)OthersUndisturbed Area7.378
Total 51.03
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone10No WLS within 10 km radius of Mine Site
(2.)ESZsNone10No ESZs within 10 km radius of Mine Site
(3.)CorridorsNone10No Corridors within 10 km radius of Mine Site
(4.)Critically Polluted AreaNone10No CPA within 10 km radius of Mine Site
(5.)NPANone10No NPA within 10 km radius of Mine Site
(6.)ESAsNone10No ESAs within 10 km radius of Mine Site
(7.)Wildlife CorridorsNone10No Wildlife Corridors within 10 km radius of Mine Site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestShikargarh Senva RF2.5north west
(2.)Archaeological SitesNone10None
(3.)Defence InstallationsNone10None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 16.6
(b)Land yet to be acquired(Ha) 13.59
(c)Status of Land acquisition if not acquired Land will acquired as per requirement
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area There is a seasonal Nallah flowing from North South to South West Side of the Mining Lease Area.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Satkhanda Nadi
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 6.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 24
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 29
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 16.83
(b)Percentage of Total Project Area 32.98
(c)No. of Plants to be Planted 16830
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAt the conceptual stage total excavated area will be 30.192 ha out of which 26.342ha area will be converted into water reservoir and 3.85 ha area will be backfilled. The water reservoir will be helpfu
(2.)FinancialThe Mining project will provide the direct & indirect Job opportunities to the local people who will improve the earning and spending capacity of the people. The project will contribute additional rev
(3.)OthersThe project has positive employment and income effects, both direct as well as indirect. Manpower is required for mining operations & other mining related activities such as transportation for day to
(4.)SocialM/s J.K. White Cement Works will undertake activities for the upliftment of the social community through community development in Education, Health, Women Empowerment & Vocational Training, Infrastruc
(5.)SocialM/s J.K. White Cement Works will undertake activities for the upliftment of the social community through community development in Education, Health, Women Empowerment & Vocational Training, Infrastruc
(6.)SocialM/s J.K. White Cement Works will undertake activities for the upliftment of the social community through community development in Education, Health, Women Empowerment & Vocational Training, Infrastruc
(7.)SocialM/s J.K. White Cement Works will undertake activities for the upliftment of the social community through community development in Education, Health, Women Empowerment & Vocational Training, Infrastruc
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)China ClayMinor
2.
Mine Capacity in ROM (Run of Mine) 102000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/BHL-Cir/CC1/Chitto/M.L. 01/01/657
(b)Date of Approval 14 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 51.03
(f)Approved Capacity 102000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 18.51
(b)Mineable Reserves (Million Ton) 12.74
(c)Extractable Reserves(Million Ton) 12.74
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 35
(f)Stripping Ratio 1 : 0.41
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) not applicable
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 120
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 51.03
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 23 Apr 1982
(iii)Validity of LOI 50
(iv)Reference No. of LOI 612
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Not Applicable
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 22 Apr 2002 From : 22 Apr 2002 To : 22 Apr 2022 Copy of Earlier Lease88 51.03
(2.)Renewal 22 Apr 2002 From : 22 Apr 2002 To : 22 Apr 2032 Copy of Earlier Lease339 51.03
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 16391
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 16391
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 26.342
(b)Depth (in meter) 27
(c)Volume (in Million Cubic meter) 7.11
12.
Details of Quarry:
(a)Final Void of 30.192 (hectare) at a Depth of 27 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 51.03
13.
Details of Transportation:
(a)In Pit/Underground to Surface Nil
(b)Surface to Siding/Loading Nil
(c)Transportation / Conveyor Details Minerals being/will be transported to Gotan white
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Government Land20.23020.23
(2.)SURFACE WATER BODIES000
(3.)FOREST LAND000
(4.)GRAZING LAND000
(5.)AGRICULTURE LAND30.80030.8
(6.)WASTE LAND000
(7.)SETTLEMENTS000
TOTAL51.03051.03
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS000.480.48
(2.)GREEN BELT12.980012.98
(3.)TOP SOIL STORAGE0000
(4.)EXTERNAL OB DUMPS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)OtherUndisturbed Area007.3787.378
(7.)VIRGIN AREA0000
(8.)EXCAVATION/QUARRY3.85026.342030.192
(9.)INTERNAL OB DUMPS0000
TOTAL16.8326.3427.858051.03
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 2.795
(c)Quarry(in hectare) 51.03
(d)Safety Zone(in hectare) 2.15
(e)Final Void of 26.342 (hectare) at a Depth of 27 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 16.830
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20140.1020.1020.1020.0189140
(2.)20150.1020.1020.1020.0039550
(3.)20160.1020.1020.1020.0160850
(4.)20170.1020.1020.1020.0026400
(5.)20180.1020.1020.1020.0020600
(6.)20100.1020.1020.1020.0152250
(7.)20110.1020.1020.1020.0405750
(8.)20120.1020.1020.1020.0112850
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 097
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)27/04/2020Your proposal/project has been examined and you are requested to submit hard copy directly to SEIAA via speedpost due to covid -19 lockdown.
(2.)25/06/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajeev Sharma
DesignationUnit Head
Name of Company (Applicant Name should not be given here)JK WHITE CEMENT WORKS GOTAN UNIT OF JK CEMENT LTD
AddressVOP- Gotan, Teh-Merta City
Print