Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance as per MoEFCC Notification dated 06th April, 2018 for Existing Karnisar Gypsum (Minor Mineral) Mining project (ML No 03/85, R-04/02), ML Area 48.73 ha. with production capacity
(b)Name of the Company / Organisation MS FCI ARAVALI GYPSUM AND MINERALS INDIA LTD
(c)Registered Address Mangu Singh Rajvi Marg, (Paota B Road), Jodhpur, Rajasthan,,Sri Ganganagar,Rajasthan-342006
(d)Legal Status of the Company Central PSU
2.
Address for the correspondence:
(a)Name of the Applicant Surendra Singh Shekhawat
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address Mangu Singh Rajvi Marg, (Paota B Road), Jodhpur, Rajasthan,Sri Ganganagar,Rajasthan-342006
(d)Pin code 342006
(e)E-mail aravalifci@outlook.com
(f)Telephone No. 141-2983404
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/45791/2018
(e)Master Proposal Number(Single Window) SW/123876/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 211/16(52),212/9(57), 211/15 (41), 211/14(36), 211
(b)Pincode 335804
(c)Bounded Latitudes (North)
From
Degree 29.145055
Minutes
Second
From
Degree 29.152025
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.415249
Minutes
Second
From
Degree 73.421263
Minutes
Second
(e)Survey of India Topo Sheet No. 44G12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 168
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.64
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanSri GanganagarSuratgarhKarnisar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number F1(4)SEIAA/SEAC-Raj/Sectt/PROJECT/Cat.1(a)B1(15100
(b)Date of Apply of TOR 22 Oct 2018
(c)Date of Issue of TOR / Standard ToR 07 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Jun 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Jul 2019
Distance of Public Hearing Venue from the Proposed Project :0.64
Govt. Higher Primary School
State :Rajasthan
District :Sri Ganganagar
Tehsil :Suratgarh
Village :Karnisar
40Public Hearing was held on 05.07.2019 at 2.00 P.M. at venue Government Senior Secondary School, Karnisar under the chairmanship of Ganaganagar District Collector’s representative, Sh. Subahsh Sharma,OthersADDITIONAL DISTRICT MAGISTRATE
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Diesel Pump4000 LTR1 NOS
(2.)Dumper20 TONNE2 NOS
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MINERAL-GYPSUM, ML AREA-48.73 Ha.40000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 01 May 2017
(iv)Valid Upto 31 Mar 2019
(v)File No. F(Mines)/Shri Ganganagar(Suratgarh)/19(1)/2017-201
(vi)Application No. 25854
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.10
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.17
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.10
(e) Funds Allocated for Environment Management Capital(%) 170.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 200
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 200
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD200OthersLPDNEAR MARKETRoad0.64 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube79.5051.077.15100
(2.)SO2Micro Gram per Meter Cube9.85.29.1080
(3.)PM2.5Micro Gram per Meter Cube43.125.043.0560
(4.)NOxMicro Gram per Meter Cube25.3012.024.7180
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l11110
(2.)pHNA7.827.506.58.5
(3.)TDSmg/l4263365002000
(4.)Total Hardnessmg/l318186.30200600
(5.)Chloridesmg/l60.1145.102501000
(6.)Fluoridemg/l0.860.6611.50
(7.)Heavy MetalsIRONmg/l0.290.220.300.30
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.507.50E
(2.)BODmg/l0.010.01E
(3.)DOmg/l5.85.8A
(4.)CODmg/l10.4310.43E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.247.3075
(2.)Leq(Night)A-weighted decibels(dB(A))44.2039.1070
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.807.38
(2.)Electric ConductivityMillisiemens per Centimetre0.4510.328
(3.)N(Nitrogen)Kilogram per hectare313.0264.10
(4.)P(Phosphorus)Kilogram per hectare20.4414.20
(5.)K(Potassium)Kilogram per hectare201.3085.01
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTANKER WATER SUPPLY5.00.64 Not Appliacble modeOthersTANKER WATER SUPPLYOthersTANKER WATER SUPPLYNA01 Oct 20195.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NOT ANY00NAOthersNA00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OB wasteOthersMINERAL WASTE159995Tons0OthersNAOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube77.1000.081177.1811100
(2.)SO2Microgram per Meter Cube9.8000.0029.8280
(3.)NOxMicrogram per Meter Cube18.1000.00518.10580
(4.)PM2.5Microgram per Meter Cube42.1000.0007942.1007960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 20
(c)Government Land 28.73
(d)Revenue Land 0
(e)Other Land 0
    Total Land 48.73
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : MINE LEASE AREA 48.73
    Total 48.73
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt7.41for plantation
(2.)Quarry Area41.25FOR MINING
(3.)Built Up Area0.07NA
Total 48.73
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNOT ANY0NOT ANY
(2.)ESAsNOT ANY0NOT ANY
(3.)ESZsNOT ANY0NOT ANY
(4.)CorridorsNOT ANY0NOT ANY
(5.)Wildlife CorridorsNOT ANY0NOT ANY
(6.)NPANOT ANY0NOT ANY
(7.)WLSNOT ANY0NOT ANY
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNOT ANY0NIL
(2.)Archaeological SitesNOT ANY0NIL
(3.)Defence InstallationsNOT ANY0NIL
(4.)OthersNANOT ANY0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl (Peacock) Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 5 lakhs
(iii)Period of Implementation 10
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Indra Gandhi Canal Project
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 6.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 24.0
(b)Percentage of Total Project Area 49.25
(c)No. of Plants to be Planted 9500
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEMPLOYMENT GENERATION
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)GypsumMinor
2.
Mine Capacity in ROM (Run of Mine) 40000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 1358
(b)Date of Approval 28 Apr 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 48.73
(f)Approved Capacity 40000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 533077
(b)Mineable Reserves (Million Ton) 507352
(c)Extractable Reserves(Million Ton) 507352
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 52
(f)Stripping Ratio 1 : 3.8
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 13
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 48.73
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof SANCTIONED LEASE
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 48.73
(iii)Validity of the lease deed From : 06 Mar 1967 To : 31 Mar 2025
(iv)Date of Execution of Mining Lese 20 Jul 1966
(v)Reference Number 3212
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 02 May 2017 From : 06 Mar 1967 To : 31 Mar 2025 Copy of Earlier LeaseME/GANGA/ML/3/1985 48.73 NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 41.25
(iii)Height (in meter) 1.4
(iv)Quantity (in Million Cubic meter) 577500
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 41.25
(b)Depth (in meter) 1.4
(c)Volume (in Million Cubic meter) 577500
12.
Details of Quarry:
(a)Final Void of 41.25 (hectare) at a Depth of 1.4 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 48.73
13.
Details of Transportation:
(a)In Pit/Underground to Surface from pits
(b)Surface to Siding/Loading by JCB
(c)Transportation / Conveyor Details transported to end user by trucks/dumpers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)SURFACE WATER BODIES000
(3.)FOREST LAND000
(4.)SETTLEMENTS000
(5.)OTHERS(Specify)pvt land20020
(6.)AGRICULTURE LAND000
(7.)WASTE LAND28.73028.73
TOTAL48.73048.73
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY240024
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)GREEN BELT0000
(7.)EXTERNAL OB DUMPS0000
(8.)VIRGIN AREA0000
TOTAL2400024
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 41.25
(d)Safety Zone(in hectare) 3.65
(e)Final Void of 41.25 (hectare) at a Depth of 1.4 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 24
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2009400004000040000269870
(2.)2014400004000040000400000
(3.)2016400004000040000400000
(4.)201140000400004000000
(5.)2013400004000040000120000
(6.)2015400004000040000400000
(7.)201740000400004000050000
(8.)201940000400004000013814.470
(9.)2008400004000040000297750
(10.)2012400004000040000400000
(11.)201840000400004000013461.690
(12.)201040000400004000045000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant VARDAN ENVIRONET
(iii)Address D-142, SUSHANT LOK-III, GURGAON, HARYANA
(iv)Mobile No. 9929108691
(v)Landline No. 0141298340
(vi)Email Id jaipur@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 09 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)04/11/20191. Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant as well as by PP not submitted. 2. Copy of approval letter of mining plan is not uploaded. 3. Copy of Green belt plan is not uploaded. 4. Cluster certificate is not submitted duly certified by ME/AME in prescribed format. 5. Aravali certificate is not submitted in prescribed format. 6. Copy of letter of intent is not submitted.
(2.)09/11/2019The correction have been made as per the instruction received
(3.)14/11/2019Clarification regarding mining lease area should be taken from PP.
(4.)15/11/2019The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurendra Singh Shekhawat
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)MS FCI ARAVALI GYPSUM AND MINERALS INDIA LTD
AddressMangu Singh Rajvi Marg, (Paota B Road), Jodhpur, Rajasthan
Print