Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) BORKHERI LIMESTONE (DIMENSIONAL), BAJRI & MASONARY STONE MINING PROJECT (REF. NO. 2019100004461)
(b)Name of the Company / Organisation SHRI MANGI LAL
(c)Registered Address R/o- 67, Near Khal, Kanwandi, Tehsil- Pirawa, District- Jhalawar (Raj.),District- Jhalawar,Jhalawar,Rajasthan-326501
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant Shri Mangi Lal
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address R/o- 67, Near Khal, Kanwandi, Tehsil- Pirawa, District- Jhalawar (Raj.),Jhalawar,Rajasthan-326501
(d)Pin code 326501
(e)E-mail mangilaljhalawar2019@gmail.com
(f)Telephone No. 141-225226
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B2
(d)Proposal Number SIA/RJ/MIN/44269/2019
(e)Master Proposal Number(Single Window) SW/120596/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Ref. No. 2019100004461
(b)Pincode 306034
(c)Bounded Latitudes (North)
From
Degree 24.46525
Minutes
Second
From
Degree 24.46713
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.01029
Minutes
Second
From
Degree 76.01094
Minutes
Second
(e)Survey of India Topo Sheet No. 54 D/03
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 334
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 10.8
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJhalawarPirawaNEAR VILLAGE – BORKHERI
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 0000
(b)Date of Apply of TOR 01 Sep 2019
(c)Date of Issue of TOR / Standard ToR 03 Oct 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason After Gatting EC
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Mining Mineral Of Limestone, Bajri &Masonary Stone114407 TPA(ROM)Mineral Limestone ,Bajri &Masonary Stone
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Mining Mineral Of Limestone, Bajri &Masonary Stone114407Tons per AnnumOthersRoad, Construction, Building. ETC
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Oct 2019
(iv)Valid Upto 04 Oct 2019
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.53
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.053
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.106
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.053
(e) Funds Allocated for Environment Management Capital(%) NaN
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD150Kilo Litre per DayNear MarketRoad0.8 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 12 Sep 2019 To 16 Sep 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube78.4578.4578.45100
(2.)SO2Micro Gram per Meter Cube10.4610.4610.4680
(3.)OthersSPMMicro Gram per Meter Cube374.23374.23374.23500
(4.)PM2.5Micro Gram per Meter Cube35.8735.8735.8760
(5.)NOxMicro Gram per Meter Cube14.1314.1314.1380
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l165716575002000
(3.)Fluoridemg/l0.920.921.01.5
(4.)pHNA7.137.136.58.5
(5.)Total Hardnessmg/l265265200600
(6.)Chloridesmg/l223.5223.52501000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.357.35C
(2.)DOmg/l6.206.20C
(3.)BODmg/l6.86.8C
(4.)CODmg/l34.034.0C
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))35.035.070
(2.)Leq(Day)A-weighted decibels(dB(A))56.256.275
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.257.25
(2.)P(Phosphorus)Milligram per Kilogram0.03240.0324
(3.)K(Potassium)Milligram per Kilogram45.145.1
(4.)Electric Conductivity362362
(5.)N(Nitrogen)Milligram per Kilogram0.12460.1246
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3.90.8Copy of Permission LettermodeOthersWATER TANKEROthersBY WATER TANKER004 Oct 20193.9
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NIL000OthersSOAK PIT00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MINERAL REJECTOthersMineral Reject37838Tons0.8RoadOthersReclamation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)SPMMicrogram per Meter Cube374.230.810500374.23
(2.)SO2Microgram per Meter Cube10.460.8108010.46
(3.)PM10Microgram per Meter Cube78.450.81010078.45
(4.)NOxMicrogram per Meter Cube14.130.8108014.13
(5.)PM2.5Microgram per Meter Cube35.870.835.876035.87
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.00
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : PVT. LAND 1
    Total 1
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersMINING ONLY1.00MINING LEASE ARESA
Total 1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANIL0Does Not Exist 15 Km Radius
(2.)ESZsNIL0Does Not Exist 15 Km Radius
(3.)CorridorsNIL0Does Not Exist 15 Km Radius
(4.)Wildlife CorridorsNIL0Does Not Exist 15 Km Radius
(5.)ESAsNIL0Does Not Exist 15 Km Radius
(6.)Critically Polluted AreaNIL0Does Not Exist 15 Km Radius
(7.)WLSNIL0Does Not Exist 15 Km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNIL0Does Not Exist 15 Km Radius
(2.)Defence InstallationsNIL0Does Not Exist 15 Km Radius
(3.)ForestPROTECTED FORESTAT KALAKOT10.8About 10.8 Km NE direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NOT APPLICABLE
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area AU Or AHU River About 0.75 Km West Direction
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.75
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 8
(b)Permanent Employment-During Operation 8
(c)Temporary Employment- During Construction 8
(d)Temporary Employment- During Operation 9
(e)No. of working days 300
(f)Total Manpower 33
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.33
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 330
(d)Funds Allocated for Plantation 30000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEmployment Generate
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 3
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LIMESTONE (DIMENSIONAL)Minor
(2.)MASONARY STONEMinor
(3.)BAJRIMinor
2.
Mine Capacity in ROM (Run of Mine) 114407
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/KOTA-CIRCLE/JHALAWAR/M.PLAN-2019/1268
(b)Date of Approval 13 Sep 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1.00
(f)Approved Capacity 114407
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1225246
(b)Mineable Reserves (Million Ton) 236722
(c)Extractable Reserves(Million Ton) 236722
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 100 : 95
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 30
(i)Mining Method Opencast
(j)Life of Mine (Years) 05
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.00
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 01 Mar 2019
(iii)Validity of LOI 50
(iv)Reference No. of LOI AKA/KOTA-V./CC/P-18(2019)/2019/34
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After Gattin EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof After Gatting EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.00
(b)Depth (in meter) 19
(c)Volume (in Million Cubic meter) 368841
12.
Details of Quarry:
(a)Final Void of 1.00 (hectare) at a Depth of 19 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0.3361
13.
Details of Transportation:
(a)In Pit/Underground to Surface By Pits
(b)Surface to Siding/Loading By Excavator
(c)Transportation / Conveyor Details Truc & Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)GRAZING LAND000
(3.)AGRICULTURE LAND000
(4.)FOREST LAND000
(5.)SURFACE WATER BODIES000
(6.)SETTLEMENTS000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY00.336100.3361
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)INTERNAL OB DUMPS0000
(5.)OtherNon Utilized000.26510.2651
(6.)ROADS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)GREEN BELT0.3988000.3988
(9.)VIRGIN AREA0000
TOTAL0.39880.33610.265101
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0.3361
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 19 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0.33
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 330
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2019001144071144070
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA006, Valid up to Nov. 15, 2019
(ii)Name of the EIA Consultant COGNIZANCE RESEARCH INDIA PRIVATE LTD
(iii)Address Office GT-20, Sec – 117, Noida – 201301. (U.P)
(iv)Mobile No. 9910047760
(v)Landline No. 0120421689
(vi)Email Id Cognizanceresearchindiapl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)17/10/2019After examination of the proposal, following discrepancies are found:- 1. Copy of pre-feasibility report is not submitted.
(2.)24/10/2019The correction have been made as per the instruction received
(3.)24/10/20191. Copy of pre-feasibility report is not submitted.
(4.)30/10/2019The correction have been made as per the instruction received
(5.)30/10/2019The correction have been made as per the instruction received
(6.)16/01/2023Your proposal/application has been examined and it is found that following documents are not submitted: 1. Copy of Form-1 duly signed by pp and consultant is not submitted. 2. Submit Certificate from concerned Deputy Conservator of Forest for proposed area not falling within 10 kms of boundary of wildlife Sanctuary/NP/ conservation reserve. 3. Cluster certificate is not submitted duly certified by ME/AME in prescribed format. 4. Aravali certificate is not submitted in prescribed format. 5. Submit a Copy of valid letter of intent . While uploading aforesaid documents you are required to check for any overwriting of existing files, you are advised not to overwrite existing documents.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri Mangi Lal
DesignationOwner
Name of Company (Applicant Name should not be given here)SHRI MANGI LAL
AddressR/o- 67, Near Khal, Kanwandi, Tehsil- Pirawa, District- Jhalawar (Raj.)
Print