Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) BAJRI MINING PROJECT ML. NO- 06-2019 OF SHRI BABULAL
(b)Name of the Company / Organisation SHRI BABULAL MEGHWAL
(c)Registered Address N/V- ROHISA, TEHSIL-RIYA BADI, DIST-NAGAUR, RAJASTHAN,,Nagaur,Rajasthan-341513
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant BABULAL MEGHWAL
(b)Designation (Owner/ Partner/ CEO) OWNER
(c)Address N/V- ROHISA, TEHSIL-RIYA BADI, DIST-NAGAUR, RAJASTHAN,Nagaur,Rajasthan-341513
(d)Pin code 341513
(e)E-mail babulalbajriecb2@gmail.com
(f)Telephone No. 141-2983404
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B2
(d)Proposal Number SIA/RJ/MIN/32424/2019
(e)Master Proposal Number(Single Window) SW/98298/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. M.L NO- 06-2019 & KHASRA NO-1425-3, 4
(b)Pincode 341513
(c)Bounded Latitudes (North)
From
Degree 26.283974136
Minutes
Second
From
Degree 26.284320682
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.094853535
Minutes
Second
From
Degree 74.095739635
Minutes
Second
(e)Survey of India Topo Sheet No. 45J2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 336
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.02
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanNagaurNagaurTEHSIL- RIYA BADI, VILLAGE- ROHISA
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 00
(b)Date of Apply of TOR 15 Apr 2019
(c)Date of Issue of TOR / Standard ToR 16 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PROJECT IS UNDER CATEGORY-B2
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)MINING PROJECT OF MINERAL BAJRI60039 TPA (ROM)BAJRI MINING PROJECT
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CAPACITY-60039 TPA (ROM) & AREA-1.5590 HA.60039Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Mar 2019
(iv)Valid Upto 06 Mar 2019
(v)File No. CTO APPLIED AFTER GETTING EC
(vi)Application No. CTO APPLIED AFTER GETTING EC
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.80
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.03
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.015
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.028
(e) Funds Allocated for Environment Management Capital(%) NaN
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)none00OthersNONENOT ANYRoad00 OthersNOT ANYCopy of Linkage
(2.)HSD200Kilo Litre per DayNEAR MARKETRoad3.50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Feb 2019 To 03 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube7.817.817.8180
(2.)PM10Micro Gram per Meter Cube73.573.573.5100
(3.)PM2.5Micro Gram per Meter Cube40.140.140.160
(4.)NOxMicro Gram per Meter Cube20.820.820.880
(5.)OthersSPMMicro Gram per Meter Cube421421421600
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.587.586.58.5
(2.)TSSmg/l11100100
(3.)TDSmg/l7077075002000
(4.)Fluoridemg/l0.800.8011.50
(5.)OthersSODIUMmg/l80.2980.294545
(6.)Total Hardnessmg/l452.3452.3200600
(7.)Heavy MetalsIRONmg/l0.380.380.30.3
(8.)Chloridesmg/l114.9114.92501000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)DOmg/l00E
(3.)BODmg/l00E
(4.)OthersOIL & GREASEmg/l00E
(5.)CODmg/l00E
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.446.275
(2.)Leq(Night)A-weighted decibels(dB(A))61.342.170
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.777.77
(2.)N(Nitrogen)Kilogram per hectare125125
(3.)P(Phosphorus)Kilogram per hectare55.355.3
(4.)Electric ConductivityMillisiemens per Centimetre0.3300.330
(5.)K(Potassium)Kilogram per hectare65.865.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 50 To 55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 55 To 60
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWATER TANKER SUPPLY23.50Copy of Permission LettermodeOthersWATER TANKER SUPPLYOthersWATER TANKER SUPPLY0005 Mar 20192
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NOT ANY000OthersNOT ANY00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NOT ANYOthersDOMESTIC0.5Kilolitre00OthersSOAK PITOthersSOAK PIT
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube73.51.020.2073.7100
(2.)PM2.5Microgram per Meter Cube40.11.020.1240.2460
(3.)SO2Microgram per Meter Cube7.811.020.097.9080
(4.)NOxMicrogram per Meter Cube20.81.020.1020.9080
(5.)Others(Specify)SPMMicrogram per Meter Cube421.01.021.15421.15600
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NOT ANYNOT ANY00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NOT ANY
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NOT ANY
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.5590
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.5590
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : MINE LEASE AREA 1.5590
    Total 1.559
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area1.5590NOT ANY
Total 1.559
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNOT ANY0NOT ANY
(2.)WLSNOT ANY0NOT ANY
(3.)NPANOT ANY0NOT ANY
(4.)ESAsNOT ANY0NOT ANY
(5.)Critically Polluted AreaNOT ANY0NOT ANY
(6.)ESZsNOT ANY0NOT ANY
(7.)Wildlife CorridorsNOT ANY0NOT ANY
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNOT ANY0NIL
(2.)Defence InstallationsNOT ANY0NIL
(3.)OthersAGRICULTURE AREANOT ANY0NIL
(4.)ForestNOT ANY0NIL
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.5590
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NOT ANY
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area LUNI RIVER
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0.25
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.4278
(b)Percentage of Total Project Area 27.44
(c)No. of Plants to be Planted 250
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEMPLOYMENT GENERATION
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)BAJRIMinor
2.
Mine Capacity in ROM (Run of Mine) 60039
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/AJ/MININGPLAN/F-G-41/2019/1546
(b)Date of Approval 18 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1.5590
(f)Approved Capacity 60039
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 210215
(b)Mineable Reserves (Million Ton) 190890
(c)Extractable Reserves(Million Ton) 190890
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 90
(f)Stripping Ratio 1 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 4
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.5590
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 01 Feb 2019
(iii)Validity of LOI 50
(iv)Reference No. of LOI SME/AJ/GOTAN/M.L-06/2019/1263
(c)Whether Lease Deed Executed ? No
(i)Reason thereof AFTER GETTING EC ITS A FRESH LOI
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof AFTER GETTING EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 15718.48
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 15718.48
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.1312
(b)Depth (in meter) 3
(c)Volume (in Million Cubic meter) 24948.37
12.
Details of Quarry:
(a)Final Void of 1.1312 (hectare) at a Depth of 3 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.1312
13.
Details of Transportation:
(a)In Pit/Underground to Surface from pits
(b)Surface to Siding/Loading by ecxavator
(c)Transportation / Conveyor Details transported to end user by trucks/dumpers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)OTHERS(Specify)pvt land1.559001
(3.)AGRICULTURE LAND000
(4.)FOREST LAND000
(5.)WASTE LAND000
(6.)SURFACE WATER BODIES000
(7.)SETTLEMENTS000
TOTAL1.55901
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)ROADS0000
(3.)EXCAVATION/QUARRY001.13121
(4.)OtherUNDISTURBED0.0278000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)INTERNAL OB DUMPS0000
(7.)VIRGIN AREA0000
(8.)GREEN BELT0.40000
(9.)EXTERNAL OB DUMPS0000
TOTAL0.427801.131201
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 1.1312
(d)Safety Zone(in hectare) 0
(e)Final Void of 1.1312 (hectare) at a Depth of 3 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 400
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.4278
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2018006003900
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant VARDAN ENVIRONET
(iii)Address D142, GROUND FLOOR, SUSHANT LOK-III, GOLF COURSE EXT. ROAD, SEC-57, GURGAON
(iv)Mobile No. 9929108691
(v)Landline No. 0141298340
(vi)Email Id jaipur@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBABULAL MEGHWAL
DesignationOWNER
Name of Company (Applicant Name should not be given here)SHRI BABULAL MEGHWAL
AddressN/V- ROHISA, TEHSIL-RIYA BADI, DIST-NAGAUR, RAJASTHAN
Print