Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Quartz & Feldspar Mining Project (Non-Operational); M.L.No. 613/2005, M.L. Area: 4.88 Hect. (Non -Forest); With Production Capacity: 80,496 TPA (ROM) Near Village: Gundali, Tehsil & District: Bhilwar
(b)Name of the Company / Organisation PRAMILA MANSIGHKA
(c)Registered Address r/o mansighka bhawan sarkari darwaja, bhopalganj, Bhilwara,Bhilwara,Rajasthan-311001
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant PRAMILA MANSIGHKA
(b)Designation (Owner/ Partner/ CEO) APPLICANT
(c)Address BHILWARA,,Bhilwara,Bhilwara,Rajasthan-311001
(d)Pin code 311001
(e)E-mail pramilamansighka@gmail.com
(f)Telephone No. 957-1734589
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/RJ/MIN/157366/2020
(e)Master Proposal Number(Single Window) SW/157364/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 10, 11, 14 & 10/1
(b)Pincode 311001
(c)Bounded Latitudes (North)
From
Degree 25.180859
Minutes
Second
From
Degree 74.281499
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 25.181120
Minutes
Second
From
Degree 74.281257
Minutes
Second
(e)Survey of India Topo Sheet No. 45K/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 474
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanBhilwaraBhilwaraGundali
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason This is B2 Category Mining Project
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hydraulic Excavator1
(2.)Tipper3
(3.)Jack Hammer2
(4.)Compressor1
(5.)Water tanker2
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Quartz & Feldspar/Mining/80,496/4.8880496Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.3
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.008
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.006
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.1
(e) Funds Allocated for Environment Management Capital(%) 2.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 80496
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 80496
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)QUARTZ AND FELDSPAR80496Tons per AnnumNARoad0.1 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Mar 2020 To 06 Mar 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.8144.8144.8160
(2.)SO2Micro Gram per Meter Cube11.5511.5511.5580
(3.)NOxMicro Gram per Meter Cube14.1214.1214.1280
(4.)PM10Micro Gram per Meter Cube73.5973.5973.59100
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.247.246.58.5
(2.)TSSmg/l55810
(3.)TDSmg/l135913595002000
(4.)Chloridesmg/l340.18340.182501000
(5.)Total Hardnessmg/l342.10342.10200600
(6.)Fluoridemg/l0.50.511.5
(7.)Heavy MetalsFemg/l0.960.960.31
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l8282B
(2.)pHNA7.247.24B
(3.)DOmg/l55B
(4.)BODmg/l1515B
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))39.839.855
(2.)Leq(Day)A-weighted decibels(dB(A))57.657.675
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Others% by mass0.0770.077
(2.)K(Potassium)Kilogram per hectare237.40237.40
(3.)Electric ConductivityOthersmhos/cm0.340.34
(4.)pH7.207.20
(5.)P(Phosphorus)Kilogram per hectare20.2020.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 42
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 45 To 47
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply33 Not Appliacble modeOthersTanker SupplyOthersWATER TANKERN/A12 Jun 20203
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.10Soak Pit via septic tankOtherssoak pit via septic tank00.1
16.1.
(a)Total Waste Water Generation 0.1
(b)Total Discharged Water 0.1
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mine waste/OverburdenOthersMineral Reject13741Tons0.1RoadOtherswill be used for Plantation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube73.590.10.5074.09100
(2.)PM2.5Microgram per Meter Cube44.810.10.5045.3160
(3.)SO2Microgram per Meter Cube11.550.10.5012.0580
(4.)NOxMicrogram per Meter Cube14.120.10.5014.6280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 4.88
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0.0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Govt. Land 4.88
    Total 4.88
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.3254
(2.)Water Reservoir2.2325
(3.)Built Up Area0.022
(4.)Othersunworked area1.3422
(5.)OB Dump Area.9579
Total 4.88
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone10None within 10 km radius
(2.)NPANone10None within 10 km radius
(3.)ESAsnone10None within 10 km radius
(4.)Critically Polluted AreaNone10None within 10 km radius
(5.)ESZsnone10None within 10 km radius
(6.)Wildlife CorridorsNone10None within 10 km radius
(7.)Corridorsnone10None within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKobra Reserved Forest3.65SE direction
(2.)Defence Installationsnone10None within 10 km radius
(3.)OthersModa Magra Reserve ForestModa Magra Reserve Forest4.96South direction
(4.)Archaeological SitesNone10None within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kothari River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 6
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 6
(e)No. of working days 300
(f)Total Manpower 22
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.3254
(b)Percentage of Total Project Area 6.67
(c)No. of Plants to be Planted 520
(d)Funds Allocated for Plantation 15000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThere will be sufficient plantation during and after the conceptual stage of the project and the the pit will be converted into water reservoir which will enhance environmental status around the proje
(2.)SocialEmployment opportunities will also create Infrastructure development with upcoming project in the backward area of Gundali.
(3.)FinancialThe proposed project will create direct employment opportunities for 30 persons and indirect employment for a substantial number of persons. This will initiate and sustain significant improvement.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Quartz & FeldsparMinor
2.
Mine Capacity in ROM (Run of Mine) 80496
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/RAJ-CIRCLE/C.C.1/BHIL/M.L. 613/2005/1157
(b)Date of Approval 10 Jun 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 4.88
(f)Approved Capacity 80496
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 639444
(b)Mineable Reserves (Million Ton) 479583
(c)Extractable Reserves(Million Ton) 479583
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 1 : 0.9
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.88
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease Agreement Done
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 4.88
(iii)Validity of the lease deed From : 05 May 2007 To : 04 May 2057
(iv)Date of Execution of Mining Lese 05 May 2007
(v)Reference Number 613/05
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof LEASE DEED WILL BE NOT RENEWED AT PRESENT
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 4.88
(iii)Height (in meter) 5
(iv)Quantity (in Million Cubic meter) 0.0175
(v)No. of year back fill up 7
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 4.88
(iii)Height (in meter) 5
(iv)Quantity (in Million Cubic meter) 7167
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 7167
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 7167
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 2.2325
(b)Depth (in meter) 25
(c)Volume (in Million Cubic meter) 558125
12.
Details of Quarry:
(a)Final Void of 2.2325 (hectare) at a Depth of 25 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 4.88
13.
Details of Transportation:
(a)In Pit/Underground to Surface 1
(b)Surface to Siding/Loading 1
(c)Transportation / Conveyor Details Mineral will be transported through trucks
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND4.8804.88
(2.)FOREST LAND000
(3.)GRAZING LAND000
(4.)SURFACE WATER BODIES000
(5.)SETTLEMENTS000
(6.)AGRICULTURE LAND000
TOTAL4.8804.88
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY02.232502.2325
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)VIRGIN AREA001.34221.3422
(5.)INTERNAL OB DUMPS0.9579000.9579
(6.)BUILT UP AREA (COLONY/OFFICE)000.0220.022
(7.)GREEN BELT0.3254000.3254
(8.)ROADS0000
TOTAL1.28332.23251.364204.88
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.9579
(c)Quarry(in hectare) 2.2325
(d)Safety Zone(in hectare) 7.5
(e)Final Void of 2.2325 (hectare) at a Depth of 25 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 320
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 1560
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20208049608049600
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026
(ii)Name of the EIA Consultant Gaurang Environmental Solutions Pvt. Ltd.
(iii)Address 501 Soni's Pais Point, Collectorate Circle, Bani Park, Jaipur
(iv)Mobile No. 9571734589
(v)Landline No. 9571734589
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 22 Jan 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)15/06/2020After examination of the proposal, following discrepancies are found:- 1. Accreditation of consultant is valid upto 22.01.2020 only. 2. Copy of approved mining plan is not submitted. 3. Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant as well as by PP is not submitted.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPRAMILA MANSIGHKA
DesignationAPPLICANT
Name of Company (Applicant Name should not be given here)PRAMILA MANSIGHKA
Addressr/o mansighka bhawan sarkari darwaja, bhopalganj, Bhilwara
Print