Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Quartz, Feldspar & Masonry Stone Mining Project (ML Area 4.8599 ha and M L No-07/1999) with production capacity of 300253 TPA located Near Village – Tiwari Ki Dhani, Tehsil- Khandela, Distt- Sikar, (R
(b)Name of the Company / Organisation Smt. Usha Sharma W/o Shri B.S. Sharma
(c)Registered Address
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Usha Sharma
(b)Designation (Owner/ Partner/ CEO) owner
(c)Address Village-Tiwari ki Dhani, Tehsil-Khandela, District-Sikar (raj.),Sikar,Rajasthan-332709
(d)Pin code 332709
(e)E-mail ushasharma7199@gmail.com
(f)Telephone No. 141-2295815
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B2
(d)Proposal Number SIA/RJ/MIN/149665/2020
(e)Master Proposal Number(Single Window) SW/149661/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No- 1617, 1618, 1624, 1625, 1626, 1627, 162
(b)Pincode 332709
(c)Bounded Latitudes (North)
From
Degree 27.70306111
Minutes
Second
From
Degree 27.7051778
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.53250000
Minutes
Second
From
Degree 75.5372222
Minutes
Second
(e)Survey of India Topo Sheet No. 45 M/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 483
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 400
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanSikarSri MadhopurTiwari Ki Dhani
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Cluster area is less tan 5 ha
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Quartz, feldspar& Masonry Stone300253 TPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Area- 4.8599300253Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 Feb 2020
(iv)Valid Upto 21 Feb 2020
(v)File No. 00
(vi)Application No. 00
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.50
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.050
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.080
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.055
(e) Funds Allocated for Environment Management Capital(%) 10.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 20
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD20Tons per AnnumNear By MarketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 13 Feb 2020 To 27 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube00000000
(2.)PM10Micro Gram per Meter Cube00000000
(3.)SO2Micro Gram per Meter Cube00000000
(4.)PM2.5Micro Gram per Meter Cube00000000
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA00000000
(2.)TSSmg/l00000000
(3.)Chloridesmg/l00000000
(4.)Total Hardnessmg/l00000000
(5.)Heavy MetalsIronmg/l00000000
(6.)TDSmg/l0000000
(7.)Fluoridemg/l00000000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l0000E
(2.)pHNA0000E
(3.)BODmg/l0000E
(4.)CODmg/l0000E
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))0000000
(2.)Leq(Day)A-weighted decibels(dB(A))000000
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare0000
(2.)P(Phosphorus)Kilogram per hectare0000
(3.)pH0000
(4.)Electric ConductivityMillisiemens per Centimetre0000
(5.)N(Nitrogen)Kilogram per hectare0000
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 80 To 90
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherswater tanker500Copy of Permission LettermodeOthersBy RoadOthersWater tanker0006 Feb 20205
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)00000000Others000000
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sub Grade MineralOthersSub Grade Mineral23920Tons10RoadOthersBackfilled
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10NA0000000000
(2.)PM2.5Microgram per Meter Cube0000000000
(3.)SO2Microgram per Meter Cube0000000000
(4.)NOxMicrogram per Meter Cube0000000000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000000PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 00
(b)Source 00
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 00
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 4.8599
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 00
    Total Land 4.8599
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 00
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : Pvt Land 4.8599
    Total 4.8599
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Water Reservoir0.9888
(2.)Green belt0.6
(3.)OB Dump Area0.3074
(4.)Built Up Area0.0073
(5.)OthersUndisturb0.9564
Total 2.8599
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone00None within 15 Km Radius
(2.)Wildlife CorridorsNone00None within 15 Km Radius
(3.)ESAsNone00None within 15 Km Radius
(4.)CorridorsNone00None within 15 Km Radius
(5.)NPANone00None within 15 Km Radius
(6.)WLSNone00None within 15 Km Radius
(7.)Critically Polluted AreaNone00None within 15 Km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone00None within 15 Km Radius
(2.)Defence InstallationsNone00None within 15 Km Radius
(3.)Archaeological SitesNone00None within 15 Km Radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 4
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 10
(e)No. of working days 300
(f)Total Manpower 14
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.60
(b)Percentage of Total Project Area 32.92
(c)No. of Plants to be Planted 1280
(d)Funds Allocated for Plantation 30000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Quartz, feldspar, Masonry StoneMinor
2.
Mine Capacity in ROM (Run of Mine) 300253
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/JAI/ M.P./P-140/2017/35
(b)Date of Approval 02 Feb 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 4.8599
(f)Approved Capacity 300253
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.100980
(b)Mineable Reserves (Million Ton) 0.668291
(c)Extractable Reserves(Million Ton) 0.300253
(d)Percent(%) of Extraction 90
(e)Grade of Coal /Ore /Mineral 00
(f)Stripping Ratio 10 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 00
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 3
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.8599
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 19 Jan 2016
(iii)Validity of LOI 1.6
(iv)Reference No. of LOI SME/Jai/Sikar/CC-III/M.P./07/99
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After GR
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof After GR
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 00
(ii)Total Area (in Hectare) 00
(iii)Height (in meter) 00
(iv)Quantity (in Million Cubic meter) 00
(v)No. of year back fill up 00
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 00
(ii)Total Area (in Hectare) 00
(iii)Height (in meter) 00
(iv)Quantity (in Million Cubic meter) 00
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 00
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 00
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 00
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0.9888
(b)Depth (in meter) 30
(c)Volume (in Million Cubic meter) 00
12.
Details of Quarry:
(a)Final Void of 0.9888 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0.9888
13.
Details of Transportation:
(a)In Pit/Underground to Surface pit
(b)Surface to Siding/Loading Dumper
(c)Transportation / Conveyor Details Excavator
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND00000
(2.)FOREST LAND00000
(3.)WASTE LAND00000
(4.)GRAZING LAND00000
(5.)SURFACE WATER BODIES0000
(6.)SETTLEMENTS00000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000000
(2.)EXTERNAL OB DUMPS00000.30740.3074
(3.)BUILT UP AREA (COLONY/OFFICE)00000.00730.0073
(4.)GREEN BELT0.600000.6
(5.)ROADS0000000
(6.)VIRGIN AREA00002.95642.9564
(7.)EXCAVATION/QUARRY000.9888000.9888
(8.)INTERNAL OB DUMPS0000000
TOTAL0.60.98883.271104.8599
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 00
(b)Internal Dump(in hectare) 00
(c)Quarry(in hectare) 00
(d)Safety Zone(in hectare) 00
(e)Final Void of 0.9888 (hectare) at a Depth of 30 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1280
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 00
(h)Total afforestation plant (in hectare) 1.60
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2020000030025330025300
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant NA
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)11/05/2020Pl. submit 1.Covering letter 2.Form no.1 includind duly filled environment sensitivity portion clearly showing distance from National/state boundary,protected areas/Sanctuaries/National parks. 3.Aravali certificate 4.Cluster certificate 5.Approved modified mining plan 6.Distt. Survey Report 7.Map showing general location/specific location/Project boundaries and project site lay out 8.Affidevit regarding non violation of EIA notification and correctness of data & document by consultant as well as Project proponent 9.Land documents including Jama bandi 10.Disclosure of consultant engaged 11. E mail id of PP. 12.Certifiate of Forest Deptt. 13.Compliance of earlier EC !4.Production figures since inception of mine ceertified by Mines Deptt.
(2.)26/08/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUsha Sharma
Designationowner
Name of Company (Applicant Name should not be given here)Smt. Usha Sharma W/o Shri B.S. Sharma
AddressVillage-Tiwari ki Dhani, Tehsil-Khandela, District-Sikar (raj.)
Print