1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Jankipura Granite & Masonary Stone Mine (M.L. 01/2015) | (b)Name of the Company / Organisation | SHRI RAM LAL MALI | (c)Registered Address | R/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk,District- Tonk,Tonk,Rajasthan-304501 | (d)Legal Status of the Company | State Government | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri Ram Lal Mali | (b)Designation (Owner/ Partner/ CEO) | Owner | (c)Address | R/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk,District- Tonk,Malpura,Tonk,Rajasthan-304501 | (d)Pin code | 304501 | (e)E-mail | ramlalmali20152019@gmail.com | (f)Telephone No. | 141-225226 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 1(a) Mining of minerals
| (b)Minor Project/Activity | 1(a) Mining of minerals
| (c)Category | B2 | (d)Proposal Number | SIA/RJ/MIN/118049/2019 | (e)Master Proposal Number(Single Window) | SW/118048/2019 | (f)EAC concerned (for category A Projects only) | Non-Coal Mining | (g)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | M.L. NO. 01/2015 | (b)Pincode | 304501 | (c)Bounded Latitudes (North) | | From | | Degree | 26.25744 | Minutes | | Second | | From | | Degree | 26.25864 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.50764 | Minutes | | Second | | From | | Degree | 75.50894 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45 N/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 295 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Tonk | Malpura | Near Village Jankipura | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | RPCB/RO/KSG/TONK/TM-236/1851-1852 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | N/A | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | MASONARY STONE | 32000 | 90480 | 122480 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | MASONARY STONE & GRANITE | 32000 | 90480 | 90480 TPA (ROM) | MINERAL GRANITE INCLUDE | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 29 Nov 2017 | (iv)Valid Upto | 31 Oct 2022 | (v)File No. | F(Mines)/Tonk(Malpura)/44(1)/2017-2018/3873-3874 | (vi)Application No. | 198797 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 0.86 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.086 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.172 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.086 | (e) Funds Allocated for Environment Management Capital(%) | NaN | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 180 | Kilo Litre per Day | | NEAR MARKET | Road | | 12.0 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 55 To 60 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 50 To 55 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | BY WATER TANKER | 4.4 | 2.5 | Copy of Permission Letter | modeOthers | BY TRACTOR | Others | BY WATER TANKER | 00 | 10 Sep 2019 | 4.4 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | NIL | 0 | 0 | 0 | Others | SOAK PIT | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation | 0 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MINERAL REJECT | Others | MINERAL REJECT | 20267 | Tons | 2.5 | Road | | Others | RECLAMATION | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 50.54 | 0.5 | 10 | 50.54 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 14.85 | 0.5 | 0 | 14.85 | 80 | (3.) | NOx | | Microgram per Meter Cube | 17.52 | 0.5 | 10 | 17.52 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 79.96 | 0.5 | 10 | 79.96 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NIL | NIL | 0 | 0 | PM10 | | NIL | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NIL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NOT APPLICABLE | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 1.00 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 1.00 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 0 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 0 | (e)Settlements | 0 | (f)Industrial | 0 | (g)Forest | 0 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : PVT. LAND | 1.00 | Total | 1 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Others | MINING ONLY | 1.00 | MINING LEASE AREA | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (2.) | WLS | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (3.) | NPA | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (4.) | ESAs | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (5.) | ESZs | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (6.) | Corridors | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (7.) | Wildlife Corridors | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (2.) | Archaeological Sites | | NIL | 0 | DOES NOT EXIST 10 KM RADIUS. | (3.) | Forest | | Chandsen Tordi Reserve Forest | 4.8 | About 4.8 Km NW Direction. | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1.00 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NOT APPLICABLE | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sodara River About 2.6 Km SW direction. | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 2.6 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 4 | (b)Permanent Employment-During Operation | 5 | (c)Temporary Employment- During Construction | 4 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 300 | (f)Total Manpower | 18 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.11 | 0.22 | 0 | (2.) | Percentage of Total Project Area | 0.11 | 0.22 | 0 | (3.) | No. of Plants | 110 | 220 | 330 | (4.) | Funds Allocated | 15000 | 35000 | 50000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | EMPLOYMENT GENERATE | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 2 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | MASONARY STONE | Minor | (2.) | GRANITE | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 90480 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | SME/JP/MP/P-207/18/90 | (b)Date of Approval | 17 May 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | State | (e)Approved Mining Lease Area | 1.00 | (f)Approved Capacity | 90480 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 281775 | (b)Mineable Reserves (Million Ton) | 717100 | (c)Extractable Reserves(Million Ton) | 717100 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | 0 | (f)Stripping Ratio | 100 : 50 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NOT APPLICABLE | (h)Average Gradient(Degree) | 30 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 7 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 1.00 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 09 Mar 2018 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | NIDE/P2(H-4)GRANA/TONK/2018/80 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | AFTER GATING EC | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | AFTER GATING EC | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 1.00 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 1.00 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 1.00 | (b)Depth (in meter) | 40 | (c)Volume (in Million Cubic meter) | 405340 | |
|
12. | Details of Quarry: | (a)Final Void of 0.3828 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 0.2722 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | BY PITS | (b)Surface to Siding/Loading | BY EXCAVATOR | (c)Transportation / Conveyor Details | BY TRUCKS/DUMPERS | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | WASTE LAND | | 0 | 0 | 0 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | FOREST LAND | | 0 | 0 | 0 | (6.) | AGRICULTURE LAND | | 0 | 0 | 0 | (7.) | OTHERS(Specify) | PVT. LAND | 1.00 | 0 | 1 | |
TOTAL | 1 | 0 | 1 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | ROADS | | 0 | 0 | 0.07 | | 0.07 | (2.) | GREEN BELT | | 0.15 | 0 | 0 | | 0.15 | (3.) | VIRGIN AREA | | 0.01 | 0 | 0 | | 0.01 | (4.) | EXCAVATION/QUARRY | | 0 | 0.3828 | 0 | | 0.3828 | (5.) | Other | NON UTILIZE | 0.1 | 0 | 0.1722 | | 0.2722 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0.005 | | 0.005 | (7.) | TOP SOIL STORAGE | | 0.01 | 0 | 0 | | 0.01 | (8.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (9.) | INTERNAL OB DUMPS | | 0 | 0 | 0.1 | | 0.1 | |
TOTAL | 0.27 | 0.3828 | 0.3472 | 0 | 1 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0.01 | (c)Quarry(in hectare) | 0.3828 | (d)Safety Zone(in hectare) | 0.2722 | (e)Final Void of 0.3828 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 330 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 0.33 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2019 | 0 | 0 | 90480 | 90480 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Accredited no. NABET/EIA/1619/IA006 | (ii)Name of the EIA Consultant | COGNIZANCE RESEARCH INDIA PRIVATE LTD | (iii)Address | Office GT-20, Sec – 117, Noida – 201301. (U.P) | (iv)Mobile No. | 9910047760 | (v)Landline No. | 0120421682 | (vi)Email Id | Cognizanceresearchindiapl@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 15 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri Ram Lal Mali | Designation | Owner | Name of Company (Applicant Name should not be given here) | SHRI RAM LAL MALI | Address | R/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk |
|