Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Jankipura Granite & Masonary Stone Mine (M.L. 01/2015)
(b)Name of the Company / Organisation SHRI RAM LAL MALI
(c)Registered Address R/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk,District- Tonk,Tonk,Rajasthan-304501
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant Shri Ram Lal Mali
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address R/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk,District- Tonk,Malpura,Tonk,Rajasthan-304501
(d)Pin code 304501
(e)E-mail ramlalmali20152019@gmail.com
(f)Telephone No. 141-225226
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B2
(d)Proposal Number SIA/RJ/MIN/118049/2019
(e)Master Proposal Number(Single Window) SW/118048/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. M.L. NO. 01/2015
(b)Pincode 304501
(c)Bounded Latitudes (North)
From
Degree 26.25744
Minutes
Second
From
Degree 26.25864
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.50764
Minutes
Second
From
Degree 75.50894
Minutes
Second
(e)Survey of India Topo Sheet No. 45 N/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 295
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanTonkMalpuraNear Village Jankipura
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. RPCB/RO/KSG/TONK/TM-236/1851-1852
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MASONARY STONE3200090480122480Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)MASONARY STONE & GRANITE320009048090480 TPA (ROM)MINERAL GRANITE INCLUDE
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 29 Nov 2017
(iv)Valid Upto 31 Oct 2022
(v)File No. F(Mines)/Tonk(Malpura)/44(1)/2017-2018/3873-3874
(vi)Application No. 198797
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.86
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.086
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.172
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.086
(e) Funds Allocated for Environment Management Capital(%) NaN
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD180Kilo Litre per DayNEAR MARKETRoad12.0 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 55 To 60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 50 To 55
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBY WATER TANKER4.42.5Copy of Permission LettermodeOthersBY TRACTOROthersBY WATER TANKER0010 Sep 20194.4
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NIL000OthersSOAK PIT00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MINERAL REJECTOthersMINERAL REJECT20267Tons2.5RoadOthersRECLAMATION
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube50.540.51050.5460
(2.)SO2Microgram per Meter Cube14.850.5014.8580
(3.)NOxMicrogram per Meter Cube17.520.51017.5280
(4.)PM10Microgram per Meter Cube79.960.51079.96100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NILNIL00PM10NIL
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source NIL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NOT APPLICABLE
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.00
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.00
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : PVT. LAND 1.00
    Total 1
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersMINING ONLY1.00MINING LEASE AREA
Total 1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0DOES NOT EXIST 10 KM RADIUS.
(2.)WLSNIL0DOES NOT EXIST 10 KM RADIUS.
(3.)NPANIL0DOES NOT EXIST 10 KM RADIUS.
(4.)ESAsNIL0DOES NOT EXIST 10 KM RADIUS.
(5.)ESZsNIL0DOES NOT EXIST 10 KM RADIUS.
(6.)CorridorsNIL0DOES NOT EXIST 10 KM RADIUS.
(7.)Wildlife CorridorsNIL0DOES NOT EXIST 10 KM RADIUS.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNIL0DOES NOT EXIST 10 KM RADIUS.
(2.)Archaeological SitesNIL0DOES NOT EXIST 10 KM RADIUS.
(3.)ForestChandsen Tordi Reserve Forest4.8About 4.8 Km NW Direction.
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.00
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NOT APPLICABLE
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sodara River About 2.6 Km SW direction.
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 4
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 4
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 18
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.110.220
(2.)Percentage of Total Project Area0.110.220
(3.)No. of Plants110220330
(4.)Funds Allocated150003500050000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEMPLOYMENT GENERATE
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 2
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)MASONARY STONEMinor
(2.)GRANITEMinor
2.
Mine Capacity in ROM (Run of Mine) 90480
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/JP/MP/P-207/18/90
(b)Date of Approval 17 May 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1.00
(f)Approved Capacity 90480
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 281775
(b)Mineable Reserves (Million Ton) 717100
(c)Extractable Reserves(Million Ton) 717100
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 100 : 50
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NOT APPLICABLE
(h)Average Gradient(Degree) 30
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.00
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 09 Mar 2018
(iii)Validity of LOI 50
(iv)Reference No. of LOI NIDE/P2(H-4)GRANA/TONK/2018/80
(c)Whether Lease Deed Executed ? No
(i)Reason thereof AFTER GATING EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof AFTER GATING EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 1.00
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 1.00
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.00
(b)Depth (in meter) 40
(c)Volume (in Million Cubic meter) 405340
12.
Details of Quarry:
(a)Final Void of 0.3828 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0.2722
13.
Details of Transportation:
(a)In Pit/Underground to Surface BY PITS
(b)Surface to Siding/Loading BY EXCAVATOR
(c)Transportation / Conveyor Details BY TRUCKS/DUMPERS
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)SETTLEMENTS000
(5.)FOREST LAND000
(6.)AGRICULTURE LAND000
(7.)OTHERS(Specify)PVT. LAND1.0001
TOTAL101
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS000.070.07
(2.)GREEN BELT0.15000.15
(3.)VIRGIN AREA0.01000.01
(4.)EXCAVATION/QUARRY00.382800.3828
(5.)OtherNON UTILIZE0.100.17220.2722
(6.)BUILT UP AREA (COLONY/OFFICE)000.0050.005
(7.)TOP SOIL STORAGE0.01000.01
(8.)EXTERNAL OB DUMPS0000
(9.)INTERNAL OB DUMPS000.10.1
TOTAL0.270.38280.347201
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.01
(c)Quarry(in hectare) 0.3828
(d)Safety Zone(in hectare) 0.2722
(e)Final Void of 0.3828 (hectare) at a Depth of 40 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 330
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.33
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20190090480904800
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Accredited no. NABET/EIA/1619/IA006
(ii)Name of the EIA Consultant COGNIZANCE RESEARCH INDIA PRIVATE LTD
(iii)Address Office GT-20, Sec – 117, Noida – 201301. (U.P)
(iv)Mobile No. 9910047760
(v)Landline No. 0120421682
(vi)Email Id Cognizanceresearchindiapl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan
(b)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(c)Uploaded Cover Letter Copy of Cover Letter
(d)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 Copy of Updated Form1
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri Ram Lal Mali
DesignationOwner
Name of Company (Applicant Name should not be given here)SHRI RAM LAL MALI
AddressR/o- Village Dungari Kalan, Tehsil- Malpura, District- Tonk
Print