Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) United Spirits Limited, unit Alwar
(b)Name of the Company / Organisation UNITED SPIRITS LIMITED ALWAR
(c)Registered Address UNITED SPIRITS LIMITED PLOT NO. 201-202, MIA, ALWAR-301030, RAJASTHAN,,Alwar,Rajasthan-301030
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant AKSHAY RALLAN
(b)Designation (Owner/ Partner/ CEO) GM
(c)Address UNITED SPIRITS LIMITED PLOT NO. 201-202, MIA ALWAR-301030, RAJASTHAN,,Ramgarh,Alwar,Rajasthan-301030
(d)Pin code 301030
(e)E-mail uslalwar18@gmail.com
(f)Telephone No. 144-2881353
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(g) Distilleries
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/IND2/52459/2007
(e)Master Proposal Number(Single Window) SW/149368/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.-201-202
(b)Pincode 301030
(c)Bounded Latitudes (North)
From
Degree 273014.92
Minutes
Second
From
Degree 27305.26
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 764027.74
Minutes
Second
From
Degree 764036.50
Minutes
Second
(e)Survey of India Topo Sheet No. 54A/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 395
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F1 (4)/SEIAA/SEAC-Raj/Sectt/Project/Cat.5 (g) B1 (
(b)Date of Apply of EC 06 Dec 2018
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Nov 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Dec 2019
Distance of Public Hearing Venue from the Proposed Project :1.4
Matasya Udhyog Sangh, Sangh Bhawan, road No. 2, M.I.A., Alwar
State :Rajasthan
District :Alwar
Tehsil :Ramgarh
Village :MIA
621. the employment opportunities to be generated by the proposed expansion of the unit. 2. • Will the ground water level be affected due to the proposed expansion, if yes, what will be the status of peOthers
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. NIL
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)IMFL cases production8000640014400Otherscases/dayRoad
(2.)Fresh Malt Spirit8000400012000OthersBL/ DayRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)LAND47,803 sq.m.none47,803 sq.m.No additional land required for proposed expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Dec 2018
(iv)Valid Upto 30 Apr 2023
(v)File No. F(PLG)/Alwar(Alwar)/37(1)/2016-2017/5600-5602
(vi)Application No. 6169
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 111.09
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.47
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.247
(e) Funds Allocated for Environment Management Capital(%) 2.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal/ Biofuel5760Tons per Annumkg/annumlocal marketRoad10 Open MarketCopy of Linkage
(2.)Sodium Hypo Chloride2304Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
(3.)food flavor4800Otherslt/annumlocal marketRoad10 Open MarketCopy of Linkage
(4.)MALT8640Tons per Annumlocal marketRoad10 Open MarketCopy of Linkage
(5.)Steam requirement38400Tons per AnnumIn house BoilerPipe Conveyor0 OthersnoneCopy of Linkage
(6.)Yeast (Active Dry Yeast/Distiller’s Yeast8320Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
(7.)power2304000Otherskw/hrJVVNL, JaipurOthersJVVNL, Jaipur15 OthersJVVNL, JaipurCopy of Linkage
(8.)ENA.18432000OthersBL/ANNUMinhousePipe Conveyor0 OthersinhouseCopy of Linkage
(9.)D M Water23040000Otherslt/annuminhousePipe Conveyor0 OthersinhouseCopy of Linkage
(10.)Special Spirit460800OthersBL/ANNUMlocal marketRoad10 Open MarketCopy of Linkage
(11.)Caramel30080Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
(12.)Hydrochloric acid46400Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
(13.)Caustic Soda8640Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
(14.)INDION 8111576Otherskg/annumlocal marketRoad15 Open MarketCopy of Linkage
(15.)enzyme.1920Otherskg/annumlocal marketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube25.4011.7025.4080
(2.)PM2.5Micro Gram per Meter Cube72.6034.9072.6060
(3.)PM10Micro Gram per Meter Cube151.9057.50151.90100
(4.)NOxMicro Gram per Meter Cube42.9029.5042.9080
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.776.706.58.5
(2.)Total Hardnessmg/l639.5203200600
(3.)Chloridesmg/l617.349.02501000
(4.)Heavy MetalsTotal Arsenic (as As)mg/l0.0050.0050.010.05
(5.)TSSmg/l0000
(6.)Fluoridemg/l0.620.1011.5
(7.)TDSmg/l20235925002000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.31.8C
(2.)BODmg/l2000452C
(3.)pHNA6.716.37C
(4.)CODmg/l46051677C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.737.945
(2.)Leq(Day)A-weighted decibels(dB(A))72.444.255
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram436198
(2.)Electric ConductivityOthersµmhos/cm410198
(3.)pH8.347.04
(4.)K(Potassium)Milligram per Kilogram24198
(5.)N(Nitrogen)Percent0.0610.043
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 50
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater3700Copy of Permission LetterPipelineTube Well21-4/5495/RJ/IND/201707 Sep 2017370
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)trade effluent120125ETPDischarge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant1200
(2.)domestic sewage420STPDischarge into Surface Water Body,Reuse within the Plant & Recycling40
16.1.
(a)Total Waste Water Generation 124
(b)Total Discharged Water 0
(c)Total Reused Water 124
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)oil filterHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.3Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)oil wetted clothHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.60Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)spent grainIndustrial Waste9000Tons0RoadOtherscattle feed
(4.)used or spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3000Kilolitre0RoadAuthorized Recyclers
(5.)plastic containersPlastic Waste3.2Tons0RoadAuthorized Recyclers
(6.)HDPE bagsIndustrial Waste15.5Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)plastic wastePlastic Waste110Tons0RoadAuthorized Recyclers
(8.)glass culletsConstruction & Demolition Waste750Tons0RoadAuthorized Recyclers
(9.)glass culletsConstruction & Demolition Waste750Tons0RoadAuthorized Recyclers
(10.)plastic/polythene bagsPlastic Waste160Tons0RoadAuthorized Recyclers
(11.)boiler ashBottom Ash620Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)LDPE bagsIndustrial Waste110Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(13.)paper waste cartonOtherspaper waste1760Tons0RoadAuthorized Recyclers
(14.)Discarded asbestosHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5.0Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)empty barrels/containersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6000.0Tons0.1RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)ETP sludgeIndustrial Waste40Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube72.602.31.0773.6760
(2.)SO2Microgram per Meter Cube25.4000.0001225.4001280
(3.)PM10Microgram per Meter Cube151.902.31.07152.97100
(4.)NOxMicrogram per Meter Cube42.902.39.4152.3180
(5.)Others(Specify)COMicrogram per Meter Cube22904.637026604000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BOILERmultifuel404PM10,SO2,NO2,NO3
(2.)DG sets: 500 k VAHSD80.5PM10,SO2,NOx ,OthersCO
(3.)DG set: 759 kVAHSD100.5PM10,SO2,NOx ,OthersCO
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source JVVNL, Jaipur
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 nos (500 kVA & 750 kVA)
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 4.78
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.78
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 4.78
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : No additional land required for proposed expansion 0
    Total 4.78
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant4.78
Total 4.78
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 km0None within 10 km
(2.)NPANone within 10 km0None within 10 km
(3.)ESZsNone within 10 km0None within 10 km
(4.)CorridorsNone within 10 km0None within 10 km
(5.)ESAsNone within 10 km0None within 10 km
(6.)WLSNone within 10 km0None within 10 km
(7.)Wildlife CorridorsNone within 10 km0None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km0None within 10 km
(2.)Defence InstallationsNone within 10 km0None within 10 km
(3.)Archaeological SitesNone within 10 km0None within 10 km
(4.)OthersNone within 10 kmNone within 10 km0None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.78
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo cristatus
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 200000
(iii)Period of Implementation 1year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 300
(e)No. of working days 330
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1577547816253
(2.)Percentage of Total Project Area331.034
(3.)No. of Plants63119650
(4.)Funds Allocated360000200000560000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialemployment oppurtunities & overall gross income
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0026
(ii)Name of the EIA Consultant GAURANG ENVIRONMENTAL SOLUTIONS PVT. LTD.
(iii)Address 102, SNG Shree Ratna Apartments, Peetal Factory, Jhotwara Road, Bani Park, Jaipur, Rajasthan, 302016
(iv)Mobile No. 9782074776
(v)Landline No. 0141402911
(vi)Email Id gaurangenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)15/10/2022The proposals/ application is found deficient /incomplete in respect to following: - 1. Location (maps showing general location / specific location /project boundaries and project site layout). 2. Project area and gross built-up area. 3. Affidavit regarding violation of EIA notification and regarding correctness of submitted data & document by consultant as well as project proponent. 4. Duly filled environment sensitivity portion of Form I clearly showing distance from national/state boundary/protected areas / sanctuaries/National Park and if area falls within 10 kms. from boundary of sanctuaries /National Park a copy of application submitted to NBWL, New Delhi. 5. Land Document. 6. Partnership deed/Directors list. (if applicable) 7. Disclosure of the consultant engaged including the sector and serial no. in the latest QCI/NABET list.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAKSHAY RALLAN
DesignationGM
Name of Company (Applicant Name should not be given here)UNITED SPIRITS LIMITED ALWAR
AddressUNITED SPIRITS LIMITED PLOT NO. 201-202, MIA, ALWAR-301030, RAJASTHAN