1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil & Gas Exploration, Appraisal and Early Production in RJ-ONHP-2017/2 Block, Barmer & Jalore District, Rajasthan | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)Telephone No. | 124-4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Minor Project/Activity | 1(a) Mining of minerals
| (c)Category | B2 | (d)Proposal Number | SIA/RJ/IND2/187977/2020 | (e)Master Proposal Number(Single Window) | SW/187975/2020 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 40O/15, 45C/3, 45C/4, 40O/15 | (b)Pincode | 343032 | (c)Bounded Latitudes (North) | | From | | Degree | 25.166624 | Minutes | | Second | | From | | Degree | 25.501433 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 71.833039 | Minutes | | Second | | From | | Degree | 72.167099 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 40O/15, 45C/3, 45C/4, 40O/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 75 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Rajasthan | Barmer | gudhamalani | Galanadi | (2.) | Rajasthan | Jalore | Bhinmal | Khetlawas | |
|
6. | Details of Terms of Reference (ToR): | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | It is a B2 Category Project. Hence, the Project is | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 64 well pad | 60 days | For exploitation of hydrocarbons | (2.) | EPU 12 number | 90 days | For Production of Crude Oil and Associated NG | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Drilling of Exploratory & Appraisal wells | 64 | Others | Numer | Others | Drilling | (2.) | Associated Natural Gas | 3.6 | Others | MMSCFD | Others | Self-Consumption in GEG | (3.) | Crude Oil | 24000 | Others | BOPD | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 1616 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.10 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0 | (e) Funds Allocated for Environment Management Capital(%) | 0.01 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2110.16 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2110.16 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | High speed diesel | 27 | Kilo Litre per Day | | Local | Road | | 0 | Others | Local | Copy of Linkage | (2.) | Water Based Mud | 1000 | Others | m3/well | Manufacturer | Others | Truck | 0 | Others | Manufacturer | Copy of Linkage | (3.) | Natural gas | 283.16 | Others | m3/hr | Local | Road | | 0 | Others | Local | Copy of Linkage | (4.) | Synthetic Based Mud | 800 | Others | m3/well | Manufacturer | Others | Truck | 0 | Others | Manufacturer | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 10 Mar 2019 To 31 May 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 55.4 | 12 | 53.8 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 19 | 7.4 | 18.2 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 93.23 | 45.92 | 92.68 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 47 | 10 | 40.56 | 60 | (5.) | Others | CO | Mili Gram per Meter Cube | 1 | 0.4 | 0.7 | 4 | |
14.2. No. of Ground Water Monitoring Locations : 11 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | As | mg/l | | 0.001 | 0.001 | 0.01 | 0.05 | (2.) | Chlorides | | | mg/l | | 1889 | 622 | 250 | 1000 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Fluoride | | | mg/l | | 1.18 | 0.32 | 1 | 1.5 | (5.) | pH | | | NA | | 7.6 | 7.3 | 6.5 | 8.5 | (6.) | Total Hardness | | | mg/l | | 760 | 200 | 300 | 600 | (7.) | TDS | | | mg/l | | 4524 | 1640 | 500 | 2000 | |
14.3. No. of Surface Water Monitoring Locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.7 | 7.6 | C | (2.) | DO | | mg/l | | 7.0 | 6.8 | C | (3.) | BOD | | mg/l | | 624 | 3.7 | E | (4.) | COD | | mg/l | | 4104 | 26.35 | E | |
14.4. No. of Ambient Noise Monitoring Locations : 11 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.8 | 55.5 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 57.5 | 43.7 | 45 | |
14.5. No. of Soil Sample Monitored Locations : 11 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 10974.44 | 5833.76 | (2.) | Electric Conductivity | Others | micro mhos/cm | 376 | 70.9 | (3.) | P(Phosphorus) | Kilogram per hectare | | 256.99 | 71.73 | (4.) | pH | | | 8.8 | 6.9 | (5.) | N(Nitrogen) | Percent | | 1.44 | 0.9 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.9 To 36.18 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 38.07 To 4.9 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Approved supplier during E&A | 87 | 0 | Copy of Permission Letter | modeOthers | Road tanker | Others | Locally | NA | 21 Oct 2019 | 87 | (2.) | Others | Approved supplier during EPU | 15 | 0 | Copy of Permission Letter | modeOthers | Road tanker | Others | Locally | NA | 21 Oct 2019 | 15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent from drill head wash during E&A | 40 | 50 | ETP | Others | re-used or disposal | 10 | 30 | (2.) | Domestic Wastewater during early production | 12 | 20 | ETP | Others | Re-used for dust suppression, green belt | 12 | 0 | (3.) | Produced Water during early production | 225 | 250 | ETP | Discharge into Surface Water Body,Others | discharge as per CPCB standards | 0 | 225 | (4.) | Domestic water during exploration and appraisal | 12 | 20 | STP | Others | Re-used for dust suppression, green belt | 12 | 0 | |
|
16.1. | (a)Total Waste Water Generation | 289 | (b)Total Discharged Water | 255 | (c)Total Reused Water | 34 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Oily Sludge / Residues during Ep | Others | Hazardous Waste Cat – 1.3 | 20 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (2.) | ETP Sludge during EP | Others | Hazardous Waste Cat – 34.2 | 120 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (3.) | Spent Carbon during EP | Others | Hazardous Waste Cat – 34.2 | 3 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (4.) | Waste / residue containing oil during EP | Others | Hazardous Waste Cat – 5.2 | 0.5 | Kilolitre | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (5.) | Used oil / Spent Oil during EP | Others | Hazardous Waste Cat – 5.1 | 1 | Kilolitre | 0 | Road | | Others | Will be sent CPCB authorized recyclers. | (6.) | Waste oil (Slop Oil) during EP | Others | Hazardous Waste Cat – 4.3 | 2 | Tons | 0 | Road | | Others | Will be sent CPCB authorized recyclers. | (7.) | Spent Chemicals during EP | Industrial Waste | | 0.6 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 18.1 | 5 | 0.06 | 18.16 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 47 | 5 | 0 | 47 | 60 | (3.) | NOx | | Microgram per Meter Cube | 53.8 | 5 | 20.0 | 73.8 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 92.68 | 5 | 0.48 | 93.16 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | EPU 1x500 KVA (Emergency Backup)) | HSD | 9 | 0.15 | PM10,SO2,NOx | | 0.023 | (2.) | Camp Site | HSD | 7 | 0.21 | PM10,NOx | | 0.023 | (3.) | Testing Flare Stack | Natural Gas | 30 | 0.078 | PM10,SO2,NOx | | 0.023 | (4.) | Drilling Site | HSD | 10 | 0.2 | PM10,NOx | | 0.023 | (5.) | Liquid Mud Pump | HSD7 | 7 | 0.2 | PM10,NOx | | 0.023 | (6.) | Radio Room | HSD | 10 | 0.305 | PM10,NOx | | 0.023 | (7.) | GEG 1 MW | Natural Gas | 10 | 0.305 | PM10,SO2,NOx | | 0.023 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2450 | (b)Source | DG sets exploration and appraisal and Gas Engine | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1X350,1X1000/1X1850,1X100,1X250 KVA(E&A), 1x500 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 9 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 62902.14 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 4920.26 | (e)Settlements | 844.72 | (f)Industrial | 0 | (g)Forest | 76.37 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Scrub (3086.74 ha) and fallow (35578.91 ha) land | 38665.65 | Total | 107409.13999999998 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Main Plant | | 9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NA | 0 | Not present | (2.) | Corridors | NA | 0 | Not present | (3.) | Critically Polluted Area | NA | 0 | Not present | (4.) | ESAs | NA | 0 | Not present | (5.) | ESZs | NA | 0 | Not present | (6.) | Wildlife Corridors | NA | 0 | Not present | (7.) | WLS | NA | 0 | Not present | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | Not present | (2.) | Defence Installations | | NA | 0 | Not present | (3.) | Forest | | Detakalana and Payla Khurd Forest | 0 | Within Block | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land acquisition not started yet | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Schedule I Species has been recorded i.e. Indian Gazelle (Gazella bennettii), Indain Blackbuck (Antilope cervicapra), Indian Peafowl (Pavo cristatus) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | yes | (iii)Period of Implementation | During drilling | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Luni River, Sukri River, Bandi River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 80 | (e)No. of working days | 60 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 2.97 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 4455 | (d)Funds Allocated for Plantation | 1000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue will be generated for both State and country during production phase | (2.) | Social | • Community will be benefited through induced socio-economic development, employment generation and CSR activity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA0108 | (ii)Name of the EIA Consultant | AECOM India Private Limited | (iii)Address | AECOM India Private Limited 19th Floor, Building No.5 Tower C, Cyber City Gurgaon 122002 Haryana, India | (iv)Mobile No. | 9819068877 | (v)Landline No. | 8340771980 | (vi)Email Id | chetan.zaveri@aecom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 13 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 07/01/2021 | The application/proposal submitted by PP has been examined and the proposals/ application is found deficient /incomplete in respect to following:- a).Project area and gross built-up area. b). Affidavit regarding violation of EIA notification and regarding correctness of submitted data& document by consultant as well as project proponent —Annx. c).Water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water. | | (2.) | 01/02/2021 | The correction have been made as per the instruction received | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Kumar Bera | Designation | Sr. Manager - Environment | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|