Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Enhancement in production capacity from 29,000 TPA MS Ingots to 86,400 TPA MS Billets and 85000 TPA TMT Bars/ structure from MS Billets
(b)Name of the Company / Organisation SHRI JINDAL TOR INDIA PVT LTD
(c)Registered Address A- 385, A- 386, A- 388, RIICO, Growth Centre, Hamirgarh, Bhilwara,,Bhilwara,Rajasthan-311001
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Anup Kumar Jindal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address A- 385, A- 386, A- 388, RIICO, Growth Centre, Hamirgarh, Bhilwara,Bhilwara,Rajasthan-311001
(d)Pin code 311001
(e)E-mail sjtbhilwara@gmail.com
(f)Telephone No. 1482-289141
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/IND/58262/2018
(e)Master Proposal Number(Single Window) SW/183047/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A-385, 386 & 388, RIICO Growth Centre, Hamirgarh,
(b)Pincode 311028
(c)Bounded Latitudes (North)
From
Degree 25.21437
Minutes
Second
From
Degree 25.2163
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.62354
Minutes
Second
From
Degree 74.62575
Minutes
Second
(e)Survey of India Topo Sheet No. 45K/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 178
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanBhilwaraBhilwaraHamirgarh
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number F1 (15459)/SEIAA/SEAC-Raj/Sectt/Project / Cat. 3(a
(b)Date of Apply of TOR 10 Sep 2018
(c)Date of Issue of TOR / Standard ToR 20 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :09 Jul 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :21 Aug 2019
Distance of Public Hearing Venue from the Proposed Project :0
A-385, 386 & 388, RIICO Growth Centre, Hamirgarh, Tehsil & District – Bhilwara, (Raj)
State :Rajasthan
District :Bhilwara
Tehsil :Bhilwara
Village :Hamirgarh
49Is there employment generate from proposed project.What impacts will be done from project.Is there any adverse impact on air cause people suffered from disease?How to be managed solid waste generatedOthersAdditional district collector and additional district Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Induction furnace2*12 TPD capacityupgraded 8 TPD Furnace to 12 TPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Bars/structure85000Tons per AnnumRoad
(2.)MS Ingots86400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Aug 2017
(iv)Valid Upto 28 Feb 2022
(v)File No. F(Tech)/Bhilwara(Bhilwara)/65(1)/2010-2011/4019-40
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 30
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.45
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.023
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.04
(e) Funds Allocated for Environment Management Capital(%) 1.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 91960
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 91960
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron Sponge23040Tons per AnnumDomestic MarketRoad10 OthersDomestic MarketCopy of Linkage
(2.)Scaling from Rolling mill1400Tons per AnnumDomestic MarketRoad10 OthersDomestic MarketCopy of Linkage
(3.)Iron Scrap66782.72Tons per AnnumDomestic MarketRoad10 OthersDomestic MarketCopy of Linkage
(4.)Silico Manganese737.28Tons per AnnumDomestic MarketRoad10 OthersDomestic MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube9.454.019.4180
(2.)NOxMicro Gram per Meter Cube19.527.8619.0680
(3.)OthersCOMili Gram per Meter Cube460240446.22000
(4.)PM10Micro Gram per Meter Cube86.5859.3680.53100
(5.)PM2.5Micro Gram per Meter Cube30.2015.7729.4760
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l401.88379.882501000
(2.)Fluoridemg/l0.730.6811.5
(3.)pHNA7.897.368.58.5
(4.)TSSmg/l8.55.20.000.00
(5.)TDSmg/l5014535002000
(6.)Total Hardnessmg/l556420200600
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.14.4C
(2.)CODmg/l24.016.0E
(3.)pHNA7.547.43A
(4.)BODmg/l6.35.8C
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))50.440.470
(2.)Leq(Day)A-weighted decibels(dB(A))60.851.570
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)OthersMicrogram per ml5.32.0
(2.)Electric ConductivityMillisiemens per Centimetre0.4400.415
(3.)pH7.847.83
(4.)P(Phosphorus)Percent00
(5.)N(Nitrogen)Percent00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBore Well300Copy of Permission LettermodeOthersN.AOthersbore well026 Jun 201824.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Activities1.61.6NAOthersDischarge into septic Tank01.6
16.1.
(a)Total Waste Water Generation 1.6
(b)Total Discharged Water 1.6
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)slagIndustrial Waste5510Tons2RoadOthersSold to Cement /bricks Industries
(2.)Domestic WasteMunicipal Solid Waste6.75Tons1.5RoadOthersDisposed as per MSW Rules
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube81.720.50.0381.75100
(2.)SO2Microgram per Meter Cube8.60.50.18.780
(3.)NOxMicrogram per Meter Cube17.660.50.117.6780
(4.)PM2.5Microgram per Meter Cube25.510.50.0825.5960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)stack 2Electricity300.7PM2.50.011
(2.)stack 2Electricity300.7PM100.021
(3.)stack 2Electricity300.7OthersCO0.0009
(4.)stack 2Electricity300.7SO20.1
(5.)stack 2Electricity300.7NO20.2
(6.)stack 1Electricity31.50.7PM2.50.01
(7.)stack 1Electricity31.50.7NO20.2
(8.)stack 1Electricity31.50.7OthersCO0.0009
(9.)stack 1Electricity31.50.7PM100.021
(10.)stack 1Electricity31.50.7SO20.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10000
(b)Source GSS RIICO Hamirgarh (Bhilwara)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 2.8530
    Total Land 2.8530
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 2.8530
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : na 0
    Total 2.853
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.9704
(2.)Green belt0.9415
(3.)Built Up Area0.2671
(4.)Othersopen area0.6740
Total 2.853
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)WLSNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)OthersNANA00
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.8530
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Banas river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0.75
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 150
(e)No. of working days 300
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.95
(b)Percentage of Total Project Area 33.30
(c)No. of Plants to be Planted 470
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIncrease in the employment for the local people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0171
(ii)Name of the EIA Consultant Global Management and Engineering Consultants Inte
(iii)Address Saharan Tower, 308, Officers Campus Extension, Sirsi Road, Khatipura, Jaipur-302012
(iv)Mobile No. 9928599571
(v)Landline No. 0141235324
(vi)Email Id info@gmecinternational.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 06 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)16/12/2020The proposals/ application is found deficient /incomplete in respect to following:- a).Form- I along with Duly filled environment sensitivity portion. b).Affidavit regarding violation of EIA notification and regarding correctness of submitted data& document by consultant as well as project proponent —Annx. c).Project area and gross built-up area. d). Land documents. e). Water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water.
(2.)24/12/2020The correction have been made as per the instruction received
(3.)30/12/2020Affidavit by consultant regarding violation of EIA notification and regarding correctness of submitted data & document has not been submitted/uploaded.
(4.)11/03/2021The correction have been made as per the instruction received
(5.)25/03/2021The proposals/ application is found deficient /incomplete in respect to following:- a). Affidavit by consultant regarding violation of EIA notification and regarding correctness of submitted data& document —Annx.
(6.)27/03/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnup Kumar Jindal
DesignationDirector
Name of Company (Applicant Name should not be given here)SHRI JINDAL TOR INDIA PVT LTD
AddressA- 385, A- 386, A- 388, RIICO, Growth Centre, Hamirgarh, Bhilwara
Print