Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed enhancement in production capacity from 25,200 TPA MS Billets to 32,400 TPA MS Billets
(b)Name of the Company / Organisation BONAFIDE ARTS PRIVATE LIMITED
(c)Registered Address Plot No - A-162, RIICO Industrial Area, Bagru Ext - II, Jaipur, Rajasthan,,Jaipur,Rajasthan-303007
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dharamveer Singh
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address A-162, RIICO Industrial Area, Bagru Extn. II,,Sanganer,Jaipur,Rajasthan-303007
(d)Pin code 303007
(e)E-mail bonafidearts01@gmail.com
(f)Telephone No. 141-2222064
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/IND/49668/2016
(e)Master Proposal Number(Single Window) SW/136158/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A 162
(b)Pincode 303007
(c)Bounded Latitudes (North)
From
Degree 26
Minutes 48
Second 17
From
Degree 26
Minutes 48
Second 19
(d)Bounded Longitudes (East)
From
Degree 75
Minutes 34
Second 05
From
Degree 75
Minutes 34
Second 05
(e)Survey of India Topo Sheet No. 45N/5, 45N/6, 45N/9, 45N/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 348
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJaipurSanganerBagru
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 15157
(b)Date of Apply of EC 12 Aug 2016
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :24 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :2.65
Sub Tehsil Office, Bagru
State :Rajasthan
District :Jaipur
Tehsil :Sanganer
Village :Bagru
38Drinking water, industries spread their raw material over public road, smoke problem in the local area.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. NIL
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)MS Billets25200720032400Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)MS Billets Plant25200 TPA7200 TPA32400 TPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Apr 2013
(iv)Valid Upto 31 Mar 2016
(v)File No. F(Tech)/Jaipur(Sanganer)/1627(1)/2013-2014/77-78
(vi)Application No. 2013-2014/Jaipur/3282
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 9.2776
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.06
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.18
(e) Funds Allocated for Environment Management Capital(%) 0.65
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7370
(b)Existing quantity of raw material/fuel 25800
(c)Total quantity of raw material/fuel 33170
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ferro Manganese633Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
(2.)M.S. Scrap27199Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
(3.)Ferro Silicon332Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
(4.)sponge Iron4976Tons per AnnumLocal MarketRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Jan 2017 To 31 Mar 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube19.54.219.580
(2.)OthersCOMili Gram per Meter Cube22070190--
(3.)PM2.5Micro Gram per Meter Cube52.217.551.460
(4.)PM10Micro Gram per Meter Cube98.25097.75100
(5.)SO2Micro Gram per Meter Cube32.24.532.0580
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2682105002000
(2.)Chloridesmg/l72.4453.862501000
(3.)Fluoridemg/l0.780.551.01.5
(4.)Heavy MetalsArsenicmg/l0.010.010.010.05
(5.)pHNA7.87.56.58.5
(6.)TSSNA00000000
(7.)Total Hardnessmg/l485198200600
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.18.1A
(2.)BODmg/l4.84.8B
(3.)OthersTotal Dissolved SolidsOthersµmhos/cm242242C
(4.)CODmg/l4.84.8B
(5.)DOmg/l86.5B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))69.141.270
(2.)Leq(Day)A-weighted decibels(dB(A))86.438.475
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.27.8
(2.)Electric ConductivityOthersmhos/cm0.340.23
(3.)K(Potassium)Kilogram per hectare180168
(4.)N(Nitrogen)Kilogram per hectare206183
(5.)P(Phosphorus)Kilogram per hectare42.536.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 35 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater155Copy of Permission LettermodeOtherswater TankerOthersoutsource by tanker supplyNIL01 Jan 201615
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic1.7500Soak pitOthersdisposal in soak pit001.75
16.1.
(a)Total Waste Water Generation 1.75
(b)Total Discharged Water 1.75
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid wasteMunicipal Solid Waste144Tons15RoadAuthorized Recyclers
(2.)SlagIndustrial Waste750Tons30RoadAuthorized Recyclers
(3.)Air emissionFly Ash20Tons30RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.20.50.390.2100
(2.)PM2.5Microgram per Meter Cube35.20.50.0835.260
(3.)SO2Microgram per Meter Cube12.30.51.012.380
(4.)NOxMicrogram per Meter Cube15.00.51.015.080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stackelectricity30.50.8PM2.50.0018
(2.)Stackelectricity30.50.8PM100.003
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5880
(b)Source Jaipur Vidyut Vitran Nigam Limited
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 320, 125
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 1.3727
    Total Land 1.3727
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 1.3727
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : NA 00
    Total 1.3727
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.53
(2.)OthersRoad and paved0.029
(3.)Green belt0.4537
Total 1.0127
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA00NA
(2.)Critically Polluted AreaNA00NA
(3.)NPANA00NA
(4.)ESAsNA00NA
(5.)ESZsNA00NA
(6.)CorridorsNA00NA
(7.)Wildlife CorridorsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNone00NA
(2.)ForestMuhana Reserve Forest13.3East side
(3.)Archaeological SitesNone00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.3727
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sadriya River
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 00
(d)Temporary Employment- During Operation 00
(e)No. of working days 300
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt25042874537
(2.)Percentage of Total Project Area23133
(3.)No. of Plants10172182
(4.)Funds Allocated0.22.02
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalplant run with more environment friendly
(2.)Financialincrease Govt. Revenue
(3.)SocialEmployment, area development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. AA
(ii)Name of the EIA Consultant Global Management and Engineering Consultants Inte
(iii)Address Saharan Tower, 308, Officers Campus Extension, Sirsi Road, Khatipura Jaipur - 302012
(iv)Mobile No. 9928793002
(v)Landline No. 0141235324
(vi)Email Id info@gmecinternational.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 07 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)27/01/2020The application/proposal submitted by PP has been examined and the proposals/ application is found deficient /incomplete in respect to following:-EDS Letter
(2.)09/10/2020The correction have been made as per the instruction received
(3.)13/10/2020The application/proposal submitted by PP has been examined and the proposals/ application is found deficient /incomplete in respect to following:- a). Point wise compliance report of earlier EC duly certified by RSPCB/SEIAA/MoEF. b). Affidavit by consultant regarding violation of EIA notification, correctness of submitted data & document.
(4.)07/01/2022The correction have been made as per the instruction received
(5.)10/01/2022you have not submitted the Affidavit by consultant please again submit the documents
(6.)22/07/2022The correction have been made as per the instruction received
(7.)02/08/2022The proposals/ application is found deficient /incomplete in respect to following: - a) Form 1 and PFR. b) Duly filled environment sensitivity portion of Form I clearly showing distance from national/state boundary/protected areas / sanctuaries/National park and if area falls within 10 kms. from boundary of sanctuaries /National park a copy of application submitted to NBWL c) Disclosure of the consultant engaged including the sector and serial no. in the latest QCI/NABET list. d) Water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water.
(8.)30/08/2022The correction have been made as per the instruction received
(9.)07/09/2022Please submit the following 1.Affidavit regarding violation of EIA notification and regarding correctness of submitted data& document by Consultant. 2.DCF certificate clearly showing distance from Wild life sanctuary(WLS)/National Park and NOC from NBWL if area falls within 10 Kms from boundary of wild life Sanctuary/National Park. . while uploading aforesaid documents you are required to check for any overwriting of existing files. you are advised not to overwrite existing documents.
(10.)19/05/2023The correction have been made as per the instruction received
(11.)23/05/2023kindly submit Form 1 , Form 1 A kindly submit Conceptual plan. •Copy of extended accreditation Certificate and disclosure of is not submitted. Kindly submit Previous EC and certified compliance if EC had been given before. Kindly submit Location along with KML file kindly submit Project description including drawings showing project layout, components of project. Kindly submit water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water.(if applicable) Kindly submit project description including drawing showing project layout, components of project. Submit project area and gross build up area. while uploading aforesaid documents you are required to check for any overwriting of existing files. you are advised not to overwrite existing documents
(12.)06/06/2023The correction have been made as per the instruction received
(13.)07/06/2023Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant is not submitted. Submit Certificate from concerned Deputy Conservator of Forest for proposed area not falling within 10 kms of boundary of wildlife Sanctuary/NP/ conservation reserve. •discloser of consultant is not submitted. Annexure G while uploading aforesaid documents you are required to check for any overwriting of existing files. you are advised not to overwrite existing documents. Kindly submit water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water.(if applicable) Kindly submit partnership deed / directors list, Kindly submit PFR. Copy of Form-1 duly signed by pp and consultant is not submitted. Kindly submit land documents . Kindly submit partnership deed / directors list.
(14.)14/06/2023The correction have been made as per the instruction received
(15.)30/06/2023•Submit Certificate from concerned Deputy Conservator of Forest for proposed area not falling within 10 kms of boundary of wildlife Sanctuary/NP/ conservation reserve. Annexure G Your proposal has been examined and it is found that Essential documents are not submitted , kindly submit. Kindly submit water demand and source of water with copy of application submitted to CGWA for withdrawal of ground water.(if applicable) Kindly submit partnership deed / directors list, Kindly submit project description including drawing showing project layout, components of project. Kindly submit PFR. Submit project area and gross build up area. kindly submit form 1 kindly submit previous EC & certified compliance. submit affidavit by consulatant.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDharamveer Singh
DesignationDirector
Name of Company (Applicant Name should not be given here)BONAFIDE ARTS PRIVATE LIMITED
AddressPlot No - A-162, RIICO Industrial Area, Bagru Ext - II, Jaipur, Rajasthan