Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Evalyni Kharbani's Randhigopa Boulderstone Mine. Area- 10 ha.
(b)Name of the Company / Organisation EVALYNI KARBANI
(c)Registered Address MAWRYNGKANG, EAST KHASI HILLS, MEGHALAYA,,East Khasi Hills,Meghalaya-793109
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant EVALYNI KHARBANI
(b)Designation (Owner/ Partner/ CEO) PROPRIETOR
(c)Address MAWRYNGKANG, EAST KHASI HILLS, MEGHALAYA,,Selsella,West Garo Hills,Meghalaya-793109
(d)Pin code 793109
(e)E-mail kharbanievalyni@gmail.com
(f)Telephone No. 141-2353332
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/ML/MIN/49376/2018
(e)Master Proposal Number(Single Window) SW/134864/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Randhigopa
(b)Pincode 794105
(c)Bounded Latitudes (North)
From
Degree 25.652833
Minutes
Second
From
Degree 25.656222
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 89.953444
Minutes
Second
From
Degree 89.958194
Minutes
Second
(e)Survey of India Topo Sheet No. 78G/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 85
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.7
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Meghalaya
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MeghalayaWest Garo HillsDadenggiriRandhigopa
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEIAA(2018)/PP/01/Pt./2018/46/241.
(b)Date of Apply of TOR 25 Jul 2018
(c)Date of Issue of TOR / Standard ToR 22 Apr 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Oct 2019
Distance of Public Hearing Venue from the Proposed Project :2
Nokma Dorbar Hall, Cherang Songma
State :Meghalaya
District :West Garo Hills
Tehsil :Dadenggiri
Village :Randhigopa
46The project garnered support from all the participants of the public hearing.OthersExecutive Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Jack hammerPneumatic
(2.)Hydraulic ExcavatorTrack
(3.)CompressorAir
(4.)DrillLong-hole
(5.)TractorWater tank
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Boulderstone1217520Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 27 Jun 2019
(iv)Valid Upto 27 Jun 2020
(v)File No. MPCB/TB-ONLINE/CTE/2019(GH)/2019-20/5
(vi)Application No. Not Available
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 2.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.1066
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.1066
(e) Funds Allocated for Environment Management Capital(%) 4.26
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1225
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1225
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Explosive245Tons per AnnumMagazineRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2020 To 02 Jan 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube24.820.124.2660
(2.)PM10Micro Gram per Meter Cube33.8928.1333.8854100
(3.)NOxMicro Gram per Meter Cube12.659.412.62780
(4.)OthersCOMili Gram per Meter Cube246198245.544000
(5.)SO2Micro Gram per Meter Cube2.61.332.50880
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA6.86.66.58.5
(2.)Total Hardnessmg/l79.878.8300600
(3.)Chloridesmg/l33.432.82501000
(4.)TSSmg/l....
(5.)Fluoridemg/l0.560.5311.5
(6.)TDSmg/l520.45205002000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.337.32E
(2.)CODNA..E
(3.)BODmg/l8.88.4E
(4.)DOmg/l7.87.4E
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.942.445
(2.)Leq(Day)A-weighted decibels(dB(A))54.852.555
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Othersmg/100gm0.660.23
(2.)pH6.154.78
(3.)P(Phosphorus)Othersmg/100gm0.890.78
(4.)N(Nitrogen)Othersmg/100gm28.727.9
(5.)Electric ConductivityOthersmicro mhos/cm348.3344.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From . To .
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater80 Not Appliacble modeOthersWater tankerTube WellNot Available04 Jan 20208
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Silt0.Desiltation via siltation tanklDischarge into Surface Water Body0
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mineral rejectsOthersMineral Reject64080Tons0RoadOthersDump
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2NA.....
(2.)PM10Microgram per Meter Cube351.415.550.5100
(3.)PM2.5Microgram per Meter Cube.....
(4.)NOxMicrogram per Meter Cube151.47.722.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)None...PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source None
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) None
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 10
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 10
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : None 0
    Total 10
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.10
(2.)Quarry Area8.5
(3.)OB Dump Area0.15
(4.)Built Up Area0.06
(5.)OthersStorage of Top Soil0.01
Total 8.82
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone within 10 kms..
(2.)ESAsNone within 10 kms..
(3.)CorridorsNone within 10 kms..
(4.)ESZsNone within 10 kms..
(5.)Critically Polluted AreaNone within 10 kms..
(6.)WLSNone within 10 kms..
(7.)Wildlife CorridorsNone within 10 kms..
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone within 10 km..
(2.)Archaeological SitesNone within 10 km..
(3.)Defence InstallationsBorder Security Force7.6BSF along the India-Bangladesh Border
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Manis crassicaudata (Indian Pangolin), Gyps bengalensis (Oriental white-backed vulture), Gyps tenuirostris (Slender-billed vulture), Cairina scutulata (White-winged duck).
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganol River in the Southern side of the Mining Lease
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 225
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 225
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.10
(b)Percentage of Total Project Area 1.00
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 226000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe project will generate direct and indirect employment opportunities
(2.)SocialThere will be positive impact in socio-economic area due to increased economic activities, creation of new employment opportunities, infrastructural development and better educational and health facil
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)BoulderstoneMinor
2.
Mine Capacity in ROM (Run of Mine) 1217520
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. DMR/MM/179/2018/666-A
(b)Date of Approval 20 Jul 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 10
(f)Approved Capacity 1217520
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 14351690
(b)Mineable Reserves (Million Ton) 8137718
(c)Extractable Reserves(Million Ton) 8137718
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 1 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 85
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 10
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 09 May 2018
(iii)Validity of LOI 0.5
(iv)Reference No. of LOI MFG.68/20/M/LOI/2222
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 10
(iii)Validity of the lease deed From : 27 Jun 2019 To : 27 Jun 2029
(iv)Date of Execution of Mining Lese 27 Jun 2019
(v)Reference Number 8111/2019
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease deed valid for 30 years. Lease deed will be
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.15
(iii)Height (in meter) 10
(iv)Quantity (in Million Cubic meter) 0.005
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) .
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) .
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) .
11.
Details of Final Mine Void:
(a)Area (in Hectare) 4.6
(b)Depth (in meter) 36
(c)Volume (in Million Cubic meter) 0.552
12.
Details of Quarry:
(a)Final Void of 4.6 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 10
13.
Details of Transportation:
(a)In Pit/Underground to Surface Tipper
(b)Surface to Siding/Loading Tipper
(c)Transportation / Conveyor Details Transportation by Tipper/Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES000
(2.)GRAZING LAND000
(3.)SETTLEMENTS000
(4.)WASTE LAND10010
(5.)AGRICULTURE LAND000
(6.)FOREST LAND000
TOTAL10010
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)EXTERNAL OB DUMPS0000
(3.)GREEN BELT0000
(4.)VIRGIN AREA0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)TOP SOIL STORAGE0000
(7.)ROADS0000
(8.)EXCAVATION/QUARRY0.20404.2
TOTAL0.24004.2
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.15
(c)Quarry(in hectare) 8.5
(d)Safety Zone(in hectare) 1
(e)Final Void of 4.6 (hectare) at a Depth of 6 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.20
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)......
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0023
(ii)Name of the EIA Consultant Geogreen Enviro House Pvt. Ltd
(iii)Address 29, Chandraloke colony, Aliganje, Lucknow, U.P.-226024
(iv)Mobile No. 8955956927
(v)Landline No. .
(vi)Email Id environment@geogreen.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 02 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)30/01/2020EDS attached for necessary action by the PP.EDS Letter
(2.)30/01/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantEVALYNI KHARBANI
DesignationPROPRIETOR
Name of Company (Applicant Name should not be given here)EVALYNI KARBANI
AddressMAWRYNGKANG, EAST KHASI HILLS, MEGHALAYA