APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) KCCBUILDCON PII
(b)Name of the Company / Organisation KCCBUILDCONP2
(c)Registered Address Airport road, jammu,,Jammu,Jammu and Kashmir-180001
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant kcc build con
(b)Designation (Owner/ Partner/ CEO) owner
(c)Address Airport road, jammu,,Jammu,Jammu,Jammu and Kashmir-180001
(d)Pin code 180001
(e)E-mail kccbuildconp2@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/JK/MIN/165896/2020
(e)Master Proposal Number(Single Window) SW/165893/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 5468/4611/3019, forelane colony kuthua
(b)Pincode 180001
(c)Bounded Latitudes (North)
From
Degree 322712.35
Minutes
Second
From
Degree 32278.45
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75251.38
Minutes
Second
From
Degree 75251.79
Minutes
Second
(e)Survey of India Topo Sheet No. 43p/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 335
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirKathuaKathuaFourlain
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason A B2 project of minor mineral with an area of unde
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)nonenoneN0ne
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)0.9548000Tons per AnnumRoad
(2.)0.000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.12
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.012
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.012
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.010
(e) Funds Allocated for Environment Management Capital(%) 10.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)0000Tons per AnnumNARoad00 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Apr 2020 To 08 Jun 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 00
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube0.000.000.0000
(2.)PM10Micro Gram per Meter Cube0.000.000.0000
(3.)PM2.5Micro Gram per Meter Cube0.000.000.0000
(4.)OthersmgMicro Gram per Meter Cube00.0000.000.0000
(5.)SO2Micro Gram per Meter Cube0.000.000.0000
    14.2.     No. of Ground Water Monitoring Locations : 0.0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0.000.000.0000
(2.)Total Hardnessmg/l0.000.000.000.00
(3.)Fluoridemg/l0.000.000.000.00
(4.)TDSmg/l0.000.000.000.00
(5.)pHmg/l0.000.000.000.00
(6.)Chloridesmg/l0.000.000.0000
    14.3.     No. of Surface Water Monitoring Locations : 0.0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l0.000.0B
(2.)DOmg/l0.000.00B
(3.)CODmg/l0.000.00B
(4.)BODmg/l0.000.00B
    14.4.     No. of Ambient Noise Monitoring Locations : 0.0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))0.000.000.00
(2.)Leq(Day)A-weighted decibels(dB(A))0.000.000.00
    14.5.     No. of Soil Sample Monitored Locations : 0.0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHMillisiemens per Centimetre0.000.00
(2.)P(Phosphorus)Millisiemens per Centimetre0.000.00
(3.)K(Potassium)Millisiemens per Centimetre0.000.00
(4.)Electric Conductivity0.000.00
(5.)N(Nitrogen)Millisiemens per Centimetre0.000.00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 8 To 6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface30.10Copy of Permission LetterPipelineTube WellPHEK/C/9286-8725 Jul 202000
(2.)Surface30.1 Not Appliacble PipelineOpen Wellapplied02 Jul 20200.00
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA0000NADischarge into Surface Water Body0.00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAHazardous Waste (as per Hazardous and Other Waste Management rules 2016)00Tons00RoadOthersN/A
(2.)NABottom Ash00Tons00RoadOthersN/A
(3.)NABio-Medical Waste00Tons00RoadOthersN/A
(4.)NAPlastic Waste00Tons00RoadSanitary LandfillsN/A
(5.)NAE Waste00Tons00RoadOthersN/A
(6.)naFly Ash00Tons00RoadSanitary Landfills
(7.)NAConstruction & Demolition Waste00Tons00RoadOthersN/A
(8.)NABottom Ash00Tons00RoadOthersN/A
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube0000000000
(2.)PM2.5Microgram per Meter Cube0000000000
(3.)SO2Microgram per Meter Cube0000000000
(4.)NOxMicrogram per Meter Cube0000000000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000000000
(2.)00000000SO200
(3.)00000000HBR00
(4.)00000000HBR00
(5.)00000000CL200
(6.)00000000CS200
(7.)00000000H2S00
(8.)00000000SO300
(9.)00000000PM2.500
(10.)00000000H2S00
(11.)0000000000
(12.)00000000NH300
(13.)00000000NH300
(14.)0000000000
(15.)00000000HCL00
(16.)00000000CL200
(17.)00000000CL200
(18.)00000000BR200
(19.)00000000CS200
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0.00
(b)Source NA
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0.00
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 00
(c)Government Land 0.95
(d)Revenue Land 00
(e)Other Land 00
    Total Land 0.95
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 00
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : NA 00
    Total 0
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Township00NA
(2.)Green belt00
(3.)Ash Pond00
(4.)Quarry Area00
(5.)OB Dump Area00
(6.)Safety Zone00
(7.)Tailing Pond00
(8.)LandFill00
(9.)Water Reservoir00
(10.)Desalination Plant00
(11.)Area for Solid Waste Management00
(12.)Built Up Area00
Total 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Wildlife CorridorsNIL0.00nil
(2.)ESZsNIL0.00nil
(3.)WLSNIL0.00nil
(4.)Critically Polluted AreaNIL0.00nil
(5.)ESAsNIL0.00nil
(6.)NPANIL0.00nil
(7.)CorridorsNIL0.00nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnil0.00nil
(2.)Defence Installationsnil0.00nil
(3.)Archaeological Sitesnil0.00nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0.00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired STATE LAND
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0.00
(b)No. of Households 0.00
(c)No. of PDFs (Project Displaced Families) 0.00
(d)No. of PAFs (Project Affected Families) 0.00
(e)Funds Allocated for R&R(in Rs) 0.00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area River Ujh and extraction is to be done in river Ujhis to be
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. PHEK C 9280 81
(iii)Date of issue 25 Jul 2020
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0.00
(b)Permanent Employment-During Operation 0.00
(c)Temporary Employment- During Construction 0.00
(d)Temporary Employment- During Operation 12
(e)No. of working days 90
(f)Total Manpower 12
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.00
(b)Percentage of Total Project Area 0.00
(c)No. of Plants to be Planted 0.00
(d)Funds Allocated for Plantation 0.00
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will be helpful in channelization of the nallah at the spot for free flow of water that shall provide better environment for aquatic life in the nallah.
(2.)SocialThe project will be helpful in channelization of the nallah at the spot for free flow of water that shall provide better environment for aquatic life in the nallah.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)River bed materialMinor
2.
Mine Capacity in ROM (Run of Mine) 00
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. JDJ/P-STP/K/2019-20/2685-87
(b)Date of Approval 02 Jan 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 0.95
(f)Approved Capacity 50
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.0641
(b)Mineable Reserves (Million Ton) 0.0620
(c)Extractable Reserves(Million Ton) 0.0620
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 00
(f)Stripping Ratio 00 : 00
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 00
(i)Mining Method Opencast
(j)Life of Mine (Years) 0.25
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 0.95
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 26 Jan 2020
(iii)Validity of LOI 0.5
(iv)Reference No. of LOI 494/MCC/DGM/LOI/3/20/476-82
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NON AVAILABILITY OF EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Fresh application
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 00
(ii)Total Area (in Hectare) 00
(iii)Height (in meter) 00
(iv)Quantity (in Million Cubic meter) 00
(v)No. of year back fill up 00
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 00
(ii)Total Area (in Hectare) 00
(iii)Height (in meter) 00
(iv)Quantity (in Million Cubic meter) 00
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 00
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 00
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 00
11.
Details of Final Mine Void:
(a)Area (in Hectare) 00
(b)Depth (in meter) 00
(c)Volume (in Million Cubic meter) 00
12.
Details of Quarry:
(a)Final Void of 00 (hectare) at a Depth of 00 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 00
13.
Details of Transportation:
(a)In Pit/Underground to Surface 00
(b)Surface to Siding/Loading 00
(c)Transportation / Conveyor Details 00
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS00000
(2.)SURFACE WATER BODIES001010
(3.)FOREST LAND00000
(4.)WASTE LAND00000
(5.)AGRICULTURE LAND00000
(6.)GRAZING LAND00000
TOTAL01010
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000000
(2.)TOP SOIL STORAGE0000000
(3.)EXTERNAL OB DUMPS0000000
(4.)GREEN BELT0000000
(5.)ROADS0000000
(6.)BUILT UP AREA (COLONY/OFFICE)0000000
(7.)INTERNAL OB DUMPS0000000
(8.)VIRGIN AREA0000000
TOTAL00000
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 00
(b)Internal Dump(in hectare) 00
(c)Quarry(in hectare) 00
(d)Safety Zone(in hectare) 00
(e)Final Void of 00 (hectare) at a Depth of 00 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 00
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 00
(h)Total afforestation plant (in hectare) 00
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant The area is small one, 0.95 hectares and needs nohas been engaged for the pre environment assessment
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)06/08/2020pl upload shortcoming documents which are tick marked on the check list (check list is enclosed) and your LoI is already expired pl revalidate and submit.EDS Letter
(2.)10/08/2020The correction have been made as per the instruction received
(3.)11/08/2020Pl upload shortcoming documents as mentioned below as they are not visible on portal,kindly upload them properly. 1: Form 1M 2:affidavits(as per checklist). 3:Joint inspection report/NOC. 4:DVD (as per checlist point no. 8).
(4.)17/08/2020The correction have been made as per the instruction received
(5.)18/08/2020pl upload all document for part 2 not part 1. (Approved Mining Plan, PFR etc.)
(6.)18/08/2020The correction have been made as per the instruction received
(7.)19/08/2020Pl Upload F 1 M as per check point (a).
(8.)21/08/2020The correction have been made as per the instruction received
(9.)24/08/2020Pl upload Joint Inspection report or NOC's (as per check list Point No.9)
(10.)21/09/2020The correction have been made as per the instruction received
(11.)22/09/2020Pl upload form 1M, RQP certificate and Affidavit as per checklist point no. 5.
(12.)22/09/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantkcc build con
Designationowner
Name of Company (Applicant Name should not be given here)KCCBUILDCONP2
AddressAirport road, jammu
Print