Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mehboob Cement Industries Pvt. Ltd.
(b)Name of the Company / Organisation MEHBOOB CEMENT INDUSTRIES
(c)Registered Address
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ubaid Hussain Lala
(b)Designation (Owner/ Partner/ CEO) Managing Director
(c)Address 308,Baba Building,Polo View,Residency Road,Srinagar,Rajouri,Jammu and Kashmir-190001
(d)Pin code 190001
(e)E-mail bashirahmadd48@gmail.com
(f)Telephone No. 194-2403406
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(b) Cement plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/JK/IND/45732/2012
(e)Master Proposal Number(Single Window) SW/123601/2019
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village Wuyan Bala Tehsil Pampore District Pulwama
(b)Pincode 190001
(c)Bounded Latitudes (North)
From
Degree 34.032367
Minutes
Second
From
Degree 34.037056
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.981912
Minutes
Second
From
Degree 74.985965
Minutes
Second
(e)Survey of India Topo Sheet No. 43J/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4072
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 6
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Jammu and Kashmir
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Jammu and KashmirPulwamaPamporeWuyan Bala
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number (SEAC)/SECY./13/41/111-17
(b)Date of Apply of TOR 20 Dec 2012
(c)Date of Issue of TOR / Standard ToR 23 Feb 2013
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Jan 2015
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Feb 2015
Distance of Public Hearing Venue from the Proposed Project :0
Village-Wuyan Bala, Tehsil- Pampore District- Pulwama, Srinagar
State :Jammu and Kashmir
District :Pulwama
Tehsil :Pampore
Village :Wuyan Bala
203No issue raisedDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Cement Plant600 TPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)OPC Cement360OthersTPDRoad
(2.)PPC Cement240OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 135.095
(b) Funds Allocated for Environment Management (Capital) (in crores) 4.7
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 6.775
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.047
(e) Funds Allocated for Environment Management Capital(%) 3.48
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 350460
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 350460
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone221760Tons per AnnumJammu kashmir and ladakhRoad10 Open MarketCopy of Linkage
(2.)IRON ORE6336Tons per AnnumLocal AgencyRoad5 Open MarketCopy of Linkage
(3.)Pet Coke38016Tons per AnnumReliance Petro ChemicalRoad10 Open MarketCopy of Linkage
(4.)Clay50688Tons per AnnumLocal AgencyRoad5 Open MarketCopy of Linkage
(5.)Flyash dry23760Tons per AnnumThermal Power PlantRoad10 Open MarketCopy of Linkage
(6.)Gypsum9900Tons per AnnumJ &K Minerals LtdRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2013 To 27 Jun 2013
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube11.402.211.1780
(2.)NOxMicro Gram per Meter Cube23.8013.8022.5480
(3.)PM10Micro Gram per Meter Cube83.2050.1081.5100
(4.)PM2.5Micro Gram per Meter Cube51.6020.0050.560
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l23182525
(2.)OthersTurbidityOthersNTU1115
(3.)pHNA8.547.468.58.5
(4.)Chloridesmg/l42.4472501000
(5.)Fluoridemg/l0.200.101.01.5
(6.)TDSmg/l5183905002000
(7.)Total Hardnessmg/l267.91234.92200600
(8.)Heavy MetalsIronmg/l0.300.150.300.30
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.86.8B
(2.)BODmg/l44B
(3.)Othersturbiditymg/l1.61.6B
(4.)pHNA7.397.39B
(5.)CODmg/l9.69.6B
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.634.770
(2.)Leq(Day)A-weighted decibels(dB(A))54.147.575
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre0.2900.210
(2.)P(Phosphorus)Milligram per Kilogram36.022.0
(3.)N(Nitrogen)Milligram per Kilogram28.322.0
(4.)K(Potassium)Milligram per Kilogram93.055.0
(5.)pH6.395.42
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.00 To 3.00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.50 To 2.50
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1000Copy of Permission LetterPipelineOthersborewellNA26 Oct 2016100
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste1010Sewage Treatment PlantGreen Belt Renewal Plant,OthersPollution Control measure9.50.5
16.1.
(a)Total Waste Water Generation 10
(b)Total Discharged Water 0.5
(c)Total Reused Water 9.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Kitchen and Domestic utilizationOthersDomestic10.23Tons0OthersNAOthersRecycling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube83.22.511.3094.50100
(2.)SO2Microgram per Meter Cube11.42.52.4413.8480
(3.)PM2.5Microgram per Meter Cube51.62.51.1352.7360
(4.)NOxMicrogram per Meter Cube23.803.2627.0680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coal mill stackcoal301.5PM10,PM2.50.15
(2.)DG set Capacity 1 X 500 (KVA)Diesel17.60.14PM10,SO2,NOx0.913
(3.)Raw mill and kiln stackcoal302.0PM10,SO2,NOx ,PM2.514.54
(4.)Clinker Cooler stackpet coke302.0PM10,PM2.52.6
(5.)Cement millpet coke150.5PM10,PM2.51.05
(6.)DG set capacity 1 x 50 (KVA)diesel100.7PM10,SO2,NOx0.456
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4500
(b)Source J&K Power development dept
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 DG sets of 50 KVA and 500 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 13.66
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 13.66
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 9.24
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 9.24
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant.92
(2.)Green belt3.92Greenbelt+ Other unused area
(3.)Built Up Area1.85Non Plant Building +Storage+Auxiliaries
(4.)OthersRoad and car+ truck parking2.55
Total 9.24
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)ESZsNA0NA
(3.)Wildlife CorridorsDachigam National Park6NA
(4.)Critically Polluted AreaNA0NA
(5.)WLSNA0NA
(6.)CorridorsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OtherswildlifeDachigam National Park6NA
(2.)ForestNA0NA
(3.)Defence InstallationsNA0NA
(4.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.24
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Leopard,Asiatic Black Bear,Lepard Cat, Hangul,Himalayan Musk Deer,Mainland Serow
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 450
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jhelam river
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 124
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 400
(e)No. of working days 330
(f)Total Manpower 774
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 4.5481
(b)Percentage of Total Project Area 33.30
(c)No. of Plants to be Planted 1100
(d)Funds Allocated for Plantation 8700000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAwareness towards the environment in the region will improve considerably
(2.)SocialPrimary education and agriculture improvement will be there
(3.)FinancialIncreased Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 101
(ii)Name of the EIA Consultant Mantras Green Resources Ltd.
(iii)Address Hall no. 1, 1st Floor, Nice sankul, plot no. A-9 opp. Nashik Merchant Co-op Bank Ltd., ITI Signal, MIDC Satpura, Nasik-422007
(iv)Mobile No. 9460478338
(v)Landline No. 0253235566
(vi)Email Id vgcpl2001@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 Mar 2018
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUbaid Hussain Lala
DesignationManaging Director
Name of Company (Applicant Name should not be given here)MEHBOOB CEMENT INDUSTRIES
Address308,Baba Building,Polo View,Residency Road,Srinagar
Print