Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mining of Sand, Stone and Bajri near bed Chikni Khad,tributary of Sarsa river of Satluj River Catchment situated in Mauza/Mohal Seri,Palasra Nihala,Bhumia &Souri, Tehsil Nalagarh, Distt.Solan,H.P
(b)Name of the Company / Organisation SHRI SARDARA SINGH,S/O SH. RAKHA SINGH
(c)Registered Address Village Nayagaon Post office Panjehra,Solan,Himachal Pradesh-174101
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sardara Singh
(b)Designation (Owner/ Partner/ CEO) Contractor
(c)Address Village Nayagaon Post office Panjehra,Solan,Himachal Pradesh-174101
(d)Pin code 174101
(e)E-mail 22deepu@gmail.com
(f)Telephone No. 1795-6565422
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/HP/MIN/39898/2017
(e)Master Proposal Number(Single Window) SW/112201/2019
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 328/1,328/2/2,482/118,152/1/1,152/1/2,22,207/43,44
(b)Pincode 174101
(c)Bounded Latitudes (North)
From
Degree 31.06315
Minutes 06
Second 31
From
Degree 31.06633
Minutes 06
Second 63
(d)Bounded Longitudes (East)
From
Degree 76.22097
Minutes 22
Second 09
From
Degree 76.70633
Minutes 70
Second 63
(e)Survey of India Topo Sheet No. H43E12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 352
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshSolanNalagarh(T)Mauza/Mohal Seri, Palasra Nihala, Bhumia &Souri
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number HPSEAC / 2008,16-Vol-V
(b)Date of Apply of TOR 12 May 2017
(c)Date of Issue of TOR / Standard ToR 23 Jun 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
Open Land near Changar Stone Crusher
State :Himachal Pradesh
District :Solan
Tehsil :Nalagarh(T)
Village :Mauza/Mohal Seri, Palasra Nihala, Bhumia &Souri
75Village is located adjoining to this mining lease and this river is the main source of various water supply schemes of Villages failing in Nalagarh area.Others
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sand, Stone/Boulder and Bajri216000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 60350
(b) Funds Allocated for Environment Management (Capital) (in crores) 5500
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.34
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 3000
(e) Funds Allocated for Environment Management Capital(%) 9.11
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD6500OthersLitersIndiaRoad10 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Oct 2017 To 30 Dec 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube98.14576.3560
(2.)SO2Micro Gram per Meter Cube9.95.69.380
(3.)PM10Micro Gram per Meter Cube170.063.9119.12100
(4.)NOxMicro Gram per Meter Cube22.513.719.7580
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.367.296.58.5
(2.)Chloridesmg/l18132501000
(3.)Total Hardnessmg/l158146200600
(4.)Heavy MetalsIronmg/l0.180.130.30
(5.)TSSmg/l0000
(6.)Fluoridemg/l0.210.1611.5
(7.)TDSmg/l2251985002000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00B
(2.)DOmg/l00B
(3.)CODmg/l00B
(4.)pHNA7.217.21B
    14.4.     No. of Ambient Noise Monitoring Locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.857.670
(2.)Leq(Night)A-weighted decibels(dB(A))44.843.975
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre0.2590.221
(2.)P(Phosphorus)Kilogram per hectare00
(3.)K(Potassium)Kilogram per hectare00
(4.)pH7.997.51
(5.)N(Nitrogen)Percent00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 28.76 To 5.01
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 27.57 To 3.02
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker8.403Copy of Permission LettermodeOthersTankerOthersTankerN/A15 Jun 20178.40
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)N/A000OthersN/A00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)0OthersN/A0Tons0OthersN/AOthersN/A
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube300.1131100
(2.)PM2.5NA000060
(3.)SO2NA000080
(4.)NOxNA000080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0N/A00OthersN/A0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source N/A
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 31.5077
(d)Revenue Land 0
(e)Other Land 0
    Total Land 31.5077
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 25891.7
(b)Waste/Barren Land 1821.16
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 4386.12
(e)Settlements 654.82
(f)Industrial 0
(g)Forest 34441.54
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Residential Colony 0
    Total 67195.34000000001
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area31.5077
Total 31.5077
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaN/A0N/A
(2.)WLSN/A0N/A
(3.)Wildlife CorridorsN/A0N/A
(4.)ESZsN/A0N/A
(5.)NPAN/A0N/A
(6.)CorridorsN/A0N/A
(7.)ESAsN/A0N/A
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsN/A0N/A
(2.)ForestN/A0N/A
(3.)Archaeological SitesN/A0N/A
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 31.5077
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired N/A
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 270
(f)Total Manpower 35
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1
(b)Percentage of Total Project Area 3.17
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated
(2.)EnvironmentalGreen area will be developed
(3.)FinancialRevenue to the state
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Sand, Stone and BajriMinor
2.
Mine Capacity in ROM (Run of Mine) 3544600
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Udyog-Bhu (Khani-4) Laghu-286/95-Vol-I-331
(b)Date of Approval 12 Apr 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 31.5077
(f)Approved Capacity 216000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 3544600
(b)Mineable Reserves (Million Ton) 3544600
(c)Extractable Reserves(Million Ton) 216000
(d)Percent(%) of Extraction 6.03
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 20 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) N/A
(h)Average Gradient(Degree) 43.66
(i)Mining Method Opencast
(j)Life of Mine (Years) 0
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 31.5077
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 17 Oct 2020
(iii)Validity of LOI 0.9
(iv)Reference No. of LOI Udyog-Bhu (Khani-4) Laghu- 286/95 Vol I-4607
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Awaited for EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Awaited for EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 31.5077
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 31.5077
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)WASTE LAND000
(5.)OTHERS(Specify)N/A000
(6.)SETTLEMENTS000
(7.)AGRICULTURE LAND000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY1001
(2.)BUILT UP AREA (COLONY/OFFICE)0000
(3.)TOP SOIL STORAGE0000
(4.)VIRGIN AREA0000
(5.)INTERNAL OB DUMPS0000
(6.)ROADS0000
(7.)EXTERNAL OB DUMPS0000
(8.)GREEN BELT1001
TOTAL20002
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 31.5077
(d)Safety Zone(in hectare) 3.15
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0.20
(h)Total afforestation plant (in hectare) 1
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0032 dated 11.04.2018
(ii)Name of the EIA Consultant Eco Laboratories and Consultants Pvt. Ltd
(iii)Address Eco Bhawan, E-207, Industrial Area, Phase VIII-B (Sector-74), Mohali (Pb.) 160071, Telefax: 0172-4616225
(iv)Mobile No. 9814003103
(v)Landline No. 0172461622
(vi)Email Id consulteco@yahoo.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 13 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)22/08/2019Please resubmit the proposal as per following observations: Sr. No. 4 KML file is not valid, not indicating boundary of the site. Sr. No. 35(8) LOI is not valid Sr. No. 39. Jamabandi/Revenue Record not attached
(2.)05/11/2020The correction have been made as per the instruction received
(3.)20/09/2021Kindly submit the hard copy and softcopy of proposal number SIA/HP/MIN/39898/2017 size less than 50mb.
(4.)30/10/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSardara Singh
DesignationContractor
Name of Company (Applicant Name should not be given here)SHRI SARDARA SINGH,S/O SH. RAKHA SINGH
AddressVillage Nayagaon Post office Panjehra
Print