Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Proposed Expansion of API’s and Bulk Drug Manufacturing unit at Plot No. 10A&B, Industrail Area, Phase II, Gwalthai, Tehsil-Naina Devi, Dist. Bilaspur Himachal Pradesh by M/s S R Bio Chem. Company/Organisation Name S R BIO CHEM PVT LTD
Registered Address Plot No. 10 A , 10 B, Gwalthai Industrial estate, Phase II, Gwalthai, Tehsil: Shree Naina deviji, Dist: Bilaspur Himachal Pradesh 174201 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Bhanubhai Vaghashia
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. 10 A , 10 B, Gwalthai Industrial estate, Phase II, Gwalthai, Tehsil: Shree Naina deviji, Dist: Bilaspur,Bilaspur,Himachal Pradesh-174201
(d)Pin code 174201
(e)E-mail gm@srbiochem.in
(f)Telephone No. 261-6158056
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/HP/IND2/207118/2021
(e)Master Proposal Number(Single Window) SW/207108/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type(New/Expansion/Modernization) Expansion
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshBilaspurNaina Devi(S.T)Industrail Area, Phase II, Gwalthai
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Plot No. 10A&B, Industrail Area, Phase II, Gwalthai, Tehsil-Naina Devi, Dist. Bilaspur Himachal Pradesh
Town / Village
(Name of more than one town may be entered by separating with)
Industrail Area, Phase II, Gwalthai Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot No. 10A&B
State Himachal Pradesh District Bilaspur
Tehshil Naina Devi(S.T) Pincode 174201
Nearest railway station BBMB Bhakhra Railway Station Distance from the project site 4.28
Nearest airport Bilaspur Airport Distance from the project site 41.23
Nearest Town/City/District Headquarters Gwalthai Distance from the project site 1.65
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Bilaspur Zilla Parishad Bilaspur, Excise Colony, Bilaspur, Himachal Pradesh 174001 01978-284035 Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 551 Existing Built Up Area(In Meter /Sqr) 551
Does it attract any of the general conditions given below? Yes
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No Expansion is proposed within the existing Manufacturing unit located in Notified Industrial Area having a valid CC&A. Existing landuse of the plot is already industrial, so there shall be no change in the landuse or land cover of the site.
1.2 Clearance of existing land, vegetation and buildings? No No clearance work is involved as proposed expansion shall be carried out within the existing unit and no construction involved
1.3 Creation of new land uses? No The land is for industrial purpose only, hence no further change in land use is required. Not required
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not required
1.5 Construction works? No Proposed expansion shall be carried out within the existing unit and no major construction shall be involved.
1.6 Demolition works? No None
1.7 Temporary sites used for construction works or housing of construction workers? No Minor equipment installation work might be involved. Local labors shall be hired. Hence no temporary housing facilities proposed within the unit.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations No Expansion proposed being within existing unit no construction involved.
1.9 Underground works including mining or tunneling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes Industry is manufacturing Ascorbic acid (vitamin-c) and Glycerine Monostearate with existing production capacity of 20 MT/Month. Proposed proposal involve addition of new products and enhance production of Ascorbic Acid. Total Proposed Production Capacity after expansion will be 55 MT/Month. Detail List of products with its manufacturing process is mentioned in PFR attached with this application
1.14 Facilities for storage of goods or materials? Yes Facilities for storage of raw material & finished goods are already provided at site separately. Provision of Warehouses and storage rooms for storage of finished product already exist. No additional construction required
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste: Existing Phase Industrial Waste: The hazardous waste generated in the factory as listed in The Hazardous & Other Waste (Management and Trans boundary Movement) Amendment Rules, 2021 is disposed as per Hazardous Waste Management Authorization received vide Authorization No BIL-53 (HPSPCB-HWMR(903)SR Biochem (P) Ltd/ID-10343/2018/2265-68 dated 10/08/2018 valid till 31/03/2023 for operation of facility for generation, reception, storage & transport of hazardous wastes for disposal
1.16 Facilities for long term housing of operational workers? No Not Required. Local people shall be preferred for the employment.
1.17 New road, rail or sea traffic during construction or operation? No Existing Road / Rail facility will be used. Site is well connected to SH22 (4.53 km SW).
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No additional transport infrastructure is required due to the proposed project.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Applicable
1.20 New or diverted transmission lines or pipelines? No Not Applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No None
1.23 Abstraction or transfers of water from ground or surface waters? No Existing freshwater demand is sourced from Gwalthai industries estate. Similarly after proposed expansion Fresh water demand of (32.6 KLD) shall be sourced by Gwalthai industries estate. Thus there shall be no direct ground water abstraction or surface water transfers by the industry.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No None
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The raw material & finished product is being transported through trucks same shall be done after expansion. During operation, workforce will use road for transportation.
1.26 Long-term dismantling or decommissioning or restoration works? No None.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Operation Phase Existing Phase: The total no. of employees is 36 nos. Expansion Phase: Additional employment requirement of 10 Nos. shall be generated. Thus the total no. of employee for the project after expansion shall be 46 no.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No None
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Proposed project being in notified industrial area and existing 4000 m2 plot has already been developed into API manufacturing industry. There will be no requirement of further land for the proposed expansion.
2.2 Water (expected source & competing users) unit: KLD Yes Source – Gwalthai industries estate Existing Phase: The total water requirement of the unit is 23.56 KLD. Out of total, 23.56 KLD fresh water requirement is 22.75 KLD being sourced by Gwalthai industries estate which is being used for process and industrial amenities. Rest 0.8 KLD of the water requirement is being sufficed by reusing distillate/condensate from evaporator/spray drier. Expansion Phase: There shall be Total water requirement of 35.6 KLD out of which 32.6 shall be fresh water req
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) No Proposed expansion shall be carried out within existing unit and no construction required.
2.5 Forests and timber (source – MT) No Not Required
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Source : Electricity: Himachal Pradesh state electricity board limited Fuel: Coal/lignite and Diesel – Local market Existing Phase: The total power requirement of the unit is 150 KW. Boiler of 3Ton is installed requiring 5 MT/d of wood or 7.5 MT/d of Coal or 5 MT/d of Lignite. Expansion Phase: There will be no increase in power requirement for the proposed expansion. However, DG set of 50 KVA is proposed as power backup in proposed expansion. In proposed expansion additional 2T Boile
2.7 Any other natural resources (use appropriate standard units) No None
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Increase in use of substances which are hazardous is envisaged. Material will be handled and stored as per the MSIHC rules and the hazardous waste rules 2016 / amendment.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and wastewater management measures are already adopted in the plant and same shall be maintained after expansion. This restricts stagnation of water or accumulation of water. No occurrence of diseases is anticipated.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes During implementation of schemes local people will be benefited due to generation of temporary and indirect employment. As well there shall be generation of 10 nos. of additional employment due to proposed expansion
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Since proposed site is already developed in the notified industrial area and the nearest densely populated area is Gwalthai located at a distance of 1.65 km, Nearest hospital is NFL hospital, Nangal at a distance of 5.24 km and nearest School/ is BBMB DAV Public School Nangal located at a distance of 3.49 km. Hence no vulnerable group of people is observed within the immediate vicinity or in 1 km area. Thus, no vulnerable groups of people shall be affected by the project.
3.5 Any other causes No No other cause
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes The municipal solid waste generation at the plant area is being segregated in biodegradable waste and recyclable waste. Recyclable waste is being sold off to recycler. Biodegradable waste is being collected and disposed to Municipal Corporation
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous waste generated in the factory as listed in The Hazardous & Other Waste (Management and Trans boundary Movement) Amendment Rules, 2021 is disposed as per Hazardous Waste Management Authorization received vide Authorization No BIL-53 (HPSPCB-HWMR(903)SR Biochem (P) Ltd/ID-10343/2018/2265-68 dated 10/08/2018 valid till 31/03/2023 for operation of facility for generation, reception, storage & transport of hazardous wastes for disposal at CHWTSDF Site, Shivalik solid Waste management L
4.4 Other industrial process wastes Yes Ash from coal-based boiler and empty barrels, scrap metals is being disposed as per applicable norms.
4.5 Surplus product No No surplus product.
4.6 Sewage sludge or other sludge from effluent treatment Yes ETP sludge will be collected and disposed to CHWTSDF-Shivalik solid Waste management Limited for further treatment and disposal
4.7 Construction or demolition wastes No Proposed expansion shall be carried out within the existing facilities and no additional construction shall be carried out.
4.8 Redundant machinery or equipment No None
4.9 Contaminated soils or other materials No None
4.10 Agricultural wastes No No agriculture waste will be generated during construction / operation of the plant.
4.11 Other solid wastes No None
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes PM, SO2, NOx emissions from Stacks attached to existing 3T Boiler, 2T Boiler (Proposed) and 50 KVA DG sets (Proposed) are envisaged. Wood/Coal/Lignite and HSD will be used in Boiler and DG sets respectively. Multicyclone separator, and wet scrubber with stack height of 30 m shall be installed for dispersion of particulate matter from Boiler. DG set with adequate stack height is proposed.
5.2 Emissions from production processes Yes In plant, expected pollutants are CO2 from Process stacks. The existing process stack of 11 m will vent the CO2 generated from the process. The plant is maintaining all emission norms prescribed by MoEF&CC/HPPCB/CPCB. All vents will be routed through dedicated APCD system. Similarly, all the reaction vessels have been connected with the individual scrubbing system so that any toxic fumes and vapours generated during reaction get neutralised. Similar practices will be maintained in expansion phas
5.3 Emissions from materials handling including storage or transport Yes Leak Detection and Repair System has been installed within the facility. Regular maintenance of valves, pumps and other equipment’s is being done to prevent leakage. High efficiency equipment’s have been installed to prevent leakage within the unit. All critical vessels, pumps and reactors which have potential to generate odour have been fitted with mechanical seals to prevent leakage and therefore odour. De-odorizer solution is regularly being sprayed through special network, which is laid arou
5.4 Emissions from construction activities including plant and equipment No Proposed expansion shall be carried out within the existing facilities and no additional construction is required to be carried out
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes The dust generated from vehicular, equipment movement (but will be minimal). The emission generated from the unit are thoroughly processed in APCD before release in the atmosphere. All appropriate measures are taken to control odor and dust. No problem of odor is noted in the plant.
5.6 Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not Applicable as there will be no burning of waste in open air
5.8 Emissions from any other sources No None
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes The plant has various machines like compressors, blowers, pumps and Boiler, which generates noise. These machines are already inbuilt with appropriate control measures to maintain the noise levels within limits. The equipment like Compressors, blowers, fans, various drums and elevators are provided with Acoustic pad insulation / Acoustic enclosures to limit the noise level as per the standard. Noise level at Boundary Fence is controlled by providing green belt throughout the boundary wall of pla
6.2 From industrial or similar processes Yes Noise is expected to be generated from running machineries in manufacturing process and DG sets but within CPCB limit. All the workers are equipped with PPE’s. to protect them from the noise pollution. All Machinery/Equipment are such that noise levels is in within permissible limits. Same shall be maintained after expansion.
6.3 From construction or demolition No No construction proposed
6.4 From blasting or piling No Blasting and piling are not envisaged
6.5 From construction or operational traffic Yes During operational phase noise is being generated due to traffic influx in the company premises due to material and personal transport. But it is minimal and for a short term only. Greenbelt around the plant is provided for reducing the noise level.
6.6 From lighting or cooling systems Yes There is slight generation of Noise from cooling Towers
6.7 From any other sources No None
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Occasional & minor oil / chemicals spills may occur. These doesn’t affect water or land because of appropriate flooring & presence of spill control procedures. All applicable precautions are taken in storing and handling of hazardous chemicals. Solid material is stored in bags and Liquid material in stored in drums or storage tanks. Drums and bags are stored in warehouses with RCC non-permeable flooring.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No Treating the sewage/ effluent as per HPPCB guideline. Domestic Sewage is treated in septic tank and disposed to soak pit. Existing Industrial effluent generated evaporated in the evaporator at site. After proposed expansion the domestic sewage and industrial effluent generated shall be treated in ETP and further sent to Evaporator for further treatment. Condensate shall be reused within unit and solid/salts generated shall be sent to TSDF site for disposal.
7.3 By deposition of pollutants emitted to air into the land or into water No Possible air pollutants are being scrubbed in the plant before emitting into atmosphere. The norms are maintained through regular monitoring and analysis of vent gases. The emission confirms the HPPCB / CPCB norms and same shall be followed after expansion.
7.4 From any other sources No Not envisaged
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No such effect is envisaged.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes The proposed project envisages handling of flammable and Hazardous materials, which in case of leakage may pose fire and explosion. • However suitable mitigation measures are implemented as under: Preventive measures like SOP, Work Permit System, and Physical Monitoring are taken to eliminate the chance of accident on account of explosion, spillages, fire or hazardous substances etc. • Proper maintenance, operation and leak proof condition of machinery on regular basis are taken. • Sensors
8.2 From any other causes No Not envisaged
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The area falls in Zone-V (Least Prone to earthquake), according to the Indian Standard Seismic Zoning Map (As per IS 1893 (Part I): 2002). This area is having moderate rainfall and there is no history of cloudburst.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Common infrastructure facility is already available within and near the project site. No change is envisaged
9.2 Lead to after-use of the site, which could have an impact on the environment No None
9.3 Set a precedent for later developments Yes This brown field project will reduce the cost of production of APIs as compared to the cost of production of new plant. This will set a precedent for other manufacturer to explore the possibility of implementing such schemes. This project would encourage other industries to implement such project.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes • Deotsidh Forest -• 14.51 km NE direction
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes • Sutlej River - 1.32 km NE direction • Gobind Sagar water reservoir-2.44 km in NW Direction
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters Yes • Sutlej River - 1.32 km NE direction • Gobind Sagar water reservoir-2.44 km in NW Direction
5 State, National boundaries Yes Punjab Boundary -2.79 Km
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No None
7 Defence installations No None
8 Densely populated or built-up area Yes • Gwalthai- 1.65 Km in SE direction • Nangal- 3.09 Km in SW direction • Naina Deviji- 15.56 Km in SSE direction
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes • NFL hospital, Nangal-5.24 km in W direction • BBMB DAV Public school, Nangal -3.49 km in W direction
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Sutlej River - 1.32 km NE direction
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Unit is located in industrial area.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Project area is categorized in the seismic zone – V, which is least prone to earthquakes.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)20/09/2021Kindly submit the hard copy and softcopy of proposal number SIA/HP/IND2/207118/2021 size less than 50mb.
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhanubhai Vaghashia
DesignationDirector
Name of Company (Applicant Name should not be given here)S R BIO CHEM PVT LTD
AddressPlot No. 10 A , 10 B, Gwalthai Industrial estate, Phase II, Gwalthai, Tehsil: Shree Naina deviji, Dist: Bilaspur