Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) New API and Intermediate Bulk Drug Manufacturing Unit namely "M/S Kinvan Private Limited" at Village- Plasra, Industrial Area /Kirpalpur Proposed Industrial Area, Tehsil- Nalagarh, Distt. - Solan, H.P.
(b)Name of the Company / Organisation M/S KINVAN PRIVATE LIMITED
(c)Registered Address Village- Plasra, Industrial area Kirpal/proposed Industrial area, Tehsil- Nalagarh,,Solan,Himachal Pradesh-174101
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Devang Manharlal Ajmera
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 314, 3rd floor, Exim link, Opposite- Link Container yard, Bhandup, Mumbai,,Nalagarh(T),Solan,Himachal Pradesh-174101
(d)Pin code 174101
(e)E-mail kinvan17@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/HP/IND2/206326/2021
(e)Master Proposal Number(Single Window) SW/206325/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 203,202,207,240/208,201,41,42,43
(b)Pincode 174101
(c)Bounded Latitudes (North)
From
Degree 310407.67
Minutes
Second
From
Degree 310424.78
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 764255.93
Minutes
Second
From
Degree 764310.07
Minutes
Second
(e)Survey of India Topo Sheet No. H43E12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 368
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshSolanNalagarh(T)Plasra, Industrial area Kirpal/Proposed Industrial area
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason B2
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)API and Intermediate Bulk Drug manufacturing unitManufacturing of API and BUlk Drug
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Avicil Stabilised Pot Clav400Tons per AnnumRoad
(2.)Sio2 Stabilised Pot Clav240Tons per AnnumRoad
(3.)Pot Clav+ Amoxy Sterile1:5120Tons per AnnumRoad
(4.)Pot Clav+Amoxy 1:5 Dc120Tons per AnnumRoad
(5.)Total1120Tons per AnnumRoad
(6.)Pot Clav + Amoxy 1:5240Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 447.1699
(b) Funds Allocated for Environment Management (Capital) (in crores) 8.5
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 8.0
(e) Funds Allocated for Environment Management Capital(%) 1.90
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 22652
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 22652
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Table 2.1, Page 12,PFR22652Tons per AnnumLocalRoad15 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 22 Mar 2021 To 23 Mar 2021
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube7.40080
(2.)NOxMicro Gram per Meter Cube20.80080
(3.)PM10Micro Gram per Meter Cube75.400100
(4.)PM2.5Micro Gram per Meter Cube41.20060
    14.2.     No. of Ground Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l0000
(2.)Fluoridemg/l0000
(3.)Heavy MetalsfeNA0000
(4.)TDSNA0000
(5.)pHNA0000
(6.)TSSmg/l0000
(7.)Chloridesmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)CODNA00E
(3.)DONA00E
(4.)BODNA00E
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))45.742.370
(2.)Leq(Day)A-weighted decibels(dB(A))57.253.675
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare4.80
(2.)Electric ConductivityOthersumhos/cm4100
(3.)pH7.890
(4.)N(Nitrogen)Kilogram per hectare1420
(5.)K(Potassium)Milligram per Kilogram18.40
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Others000Copy of Permission LetterPipelineOthers0020 Mar 20210
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial effluent000Reuse within the Plant & Recycling0
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid wasteMunicipal Solid Waste29.952Tons15RoadOthersAuthorized co-processors
(2.)Hazardous wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)322Tons15RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5NA00000
(2.)NOxNA00000
(3.)PM10NA00000
(4.)SO2NA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 18.700
(b)Source HPSEBL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1000KVA
(e)Stack Height (in m) 3.5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 25.4952
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 25.4952
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 25.4952
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 25.4952
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant25.4952
Total 25.4952
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area000
(2.)WLS000
(3.)NPA000
(4.)ESAs000
(5.)ESZs000
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest000
(2.)Defence Installations000
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 25.4952
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 25
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 312
(f)Total Manpower 425
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 9.1783
(b)Percentage of Total Project Area 36.00
(c)No. of Plants to be Planted 22946
(d)Funds Allocated for Plantation 10
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0146
(ii)Name of the EIA Consultant Chandigarh Pollution Testing Laboratory -EIA Divis
(iii)Address E-126, INDUSTRIAL AREA, PHASE-7, MOHALI
(iv)Mobile No. 9988577295
(v)Landline No. 0172466929
(vi)Email Id cptleia@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 12 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDevang Manharlal Ajmera
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S KINVAN PRIVATE LIMITED
AddressVillage- Plasra, Industrial area Kirpal/proposed Industrial area, Tehsil- Nalagarh
Print