Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil and Gas Exploration, Appraisal and Early Production in Block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal Pradesh
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address 4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dilip Kumar Bera
(b)Designation (Owner/ Partner/ CEO) Sr. Manager - Environment
(c)Address
(d)Pin code 122002
(e)E-mail dilipkumar.bera@cairnindia.com
(f)Telephone No. 124-4594176
(g)Fax No. 4145612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/HP/IND2/176745/2020
(e)Master Proposal Number(Single Window) SW/176729/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. H43E13, H43E14, H43E15
(b)Pincode 175019
(c)Bounded Latitudes (North)
From
Degree 31.52930028
Minutes
Second
From
Degree 31.70930889
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.95361111
Minutes
Second
From
Degree 76.95792222
Minutes
Second
(e)Survey of India Topo Sheet No. H43E13,H43E14,H43E15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1200
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshMandiS/Nagarsunder Nagar
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is a B2 Category Project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Onshore Oil & Gas Exploration and Appraisal7 wells2 exploratory 5 EPU
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Natural Gas0.6OthersMMSCFDOthersCaptive
(2.)Crude Oil4000OthersBOPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 201.835
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.40
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 3.02
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.54
(e) Funds Allocated for Environment Management Capital(%) 0.69
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1800
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1800
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)High speed diesel27Kilo Litre per DayLocalRoad0 Open MarketCopy of Linkage
(2.)Water Based Mud1000Otherscubic meter per wellsupply from local ManufacturerRoad0 Open MarketCopy of Linkage
(3.)Synthetic Based Mud800Otherscubic meter per wellsupply from local ManufacturerRoad0 Open MarketCopy of Linkage
(4.)Natural gas283.16Otherscubic meter per hourLocalRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Mar 2019 To 15 Jun 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube77.127.963.5100
(2.)PM2.5Micro Gram per Meter Cube39.71230.560
(3.)SO2Micro Gram per Meter Cube16.76.613.580
(4.)NOxMicro Gram per Meter Cube239.818.380
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l4062025002000
(3.)Chloridesmg/l122362501000
(4.)Fluoridemg/l0.50.21.01.5
(5.)Total Hardnessmg/l22892200600
(6.)pHNA7.796.686.58.5
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.15.5A
(2.)pHNA7.356.86A
(3.)BODmg/l00A
(4.)CODmg/l00A
(5.)OthersTDSmg/l262140A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))40.835.345
(2.)Leq(Day)A-weighted decibels(dB(A))45.538.655
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.855.14
(2.)N(Nitrogen)Percent0.100.06
(3.)P(Phosphorus)Kilogram per hectare63.421.8
(4.)Electric ConductivityOthersdeciSiemens per metre0.750.22
(5.)K(Potassium)Milliequivalents per 100 Gram1.450.13
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.86 To 9.92
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.37 To 5.83
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Supply10210Copy of Permission LettermodeOthersTanker SupplyOthersTanker SupplyNA24 Sep 202087
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water during early production1520Septic tank/soak pit/STPReuse within the Plant & Recycling15
(2.)Effluent from Drilling Operation4050Mobile ETPOthersdischarge as per CPCB guidelines1030
(3.)Domestic water during drilling1215Septic tank/soak pit or STPReuse within the Plant & Recycling12
(4.)waste water during early production225250Mobile ETPOthersdischarge as per CPCB guidelines0225
16.1.
(a)Total Waste Water Generation 292
(b)Total Discharged Water 255
(c)Total Reused Water 37
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drill Cutting Associated with WBMlOthersSolid/Non-hazardous waste750Tons0RoadOthersHDPE lined pit
(2.)Domestic WasteMunicipal Solid Waste0.03Tons0RoadOthersCompost pit
(3.)Spent WBMHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons0RoadOthersAs per hazardous waste rule
(4.)Drill Cutting Associated with SBMHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1500Tons0RoadOthersAs per hazardous waste rule 2016
(5.)Sludge containing oil and other drilling wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons0RoadOthersAs per hazardous waste rule 2016
(6.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons0RoadOthersAs per hazardous waste rule 2016
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube77.10.050.4177.51100
(2.)SO2Microgram per Meter Cube6.60.050.827.4380
(3.)NOxMicrogram per Meter Cube230.050.2023.2180
(4.)PM2.5Microgram per Meter Cube39.70.05039.760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1000 kVA DG set at drilling siteHSD100.2PM10,SO2,NOx0.005, 0.24,0.14
(2.)250 kVA D.G. Set AtLiquid MudPlanteeHSD70.21PM10,SO2,NOx0.0004, 0.02,0.02Camp Site
(3.)350 kVAD.G.Set AtCamp SiteHSD70.21PM10,SO2,NOx0.0004, 0.02,0.02Camp Site
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2950
(b)Source DG & GEG
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Campsite:350 kVA,Drilling:1000,RR:100,LMP:250 kVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 9
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0.0580
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0.003056
(e)Settlements 0.0017
(f)Industrial 0
(g)Forest 0.039235
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Scrub land and vegetation and plantation 0.127537
    Total 0.229528
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersEach Well Pad9
Total 9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0None in study area
(2.)Wildlife CorridorsNone0None in study area
(3.)ESZsESZ around Nargu wildlife sanctuaryl3.6ESZ around Nargu wildlife sanctuary - 3.6 km NE
(4.)ESAsESZ around Bandli wildlife sanctuary 3.6 km NE2.7South direction from block boundaryry 3.6 km NE
(5.)WLSESZ around Shikari devi wildlife sanctuarykm NE8.9ESZ around Shikari devi wildlife sanctuary - 8.9 km E from block boundaryo
(6.)Critically Polluted AreaNone0None in study area
(7.)CorridorsNone0None in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None in study area
(2.)ForestForest0Forest present within the block
(3.)Defence InstallationsNone0None in study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 9
(c)Status of Land acquisition if not acquired Land yet to be acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Suketi Khad River Beas River Uhl Rivertuarykm NE
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Suketi Khad River Beas River Uhl Rivertuarykm NE
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 80
(e)No. of working days 90
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.97
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 4800
(d)Funds Allocated for Plantation 0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social1.Employment Potential :The project has a potential to generate direct andindirect employment for unskilled, semi-skilled and skilled manpower . Indirectemployment through services for the personnel
(2.)FinancialRevenue Earning of Central & State Government: Both, State Government andGovt of India would be benefited with the hydrocarbon discovery andsubsequently its production from the block
(3.)EnvironmentalGreen Belt Development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/SA 085
(ii)Name of the EIA Consultant Eco Chem Sales & Services
(iii)Address Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health Club, Surat – 395 001
(iv)Mobile No. 9825123805
(v)Landline No. 2612231630
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 26 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)04/03/2021EDSEDS Letter
(2.)05/06/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)16/10/2021For further na.ADS Letter
(2.)22/11/2021We would like to request you to consider our project in upcoming SEAC Meeting Agenda.ADS Letter
(3.)08/12/2021Kindly resubmit with observations as per 83rd meeting of SEAC.ADS Letter
(4.)18/08/2022Request Letter to consider our project in next month SEAC Meeting AgendaADS Letter
(5.)23/09/2022As per observation of 86th meeting of HPSEACADS Letter
(6.)18/10/2022Submission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal PradeshADS Letter
(7.)05/01/2023Kindly submit the documents as per observation 86th meetingADS Letter
(8.)21/02/2023Resubmission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal PradeshADS Letter
(9.)21/02/2023Resubmission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal PradeshADS Letter
(10.)25/02/2023Kindly submit the hard copy and soft copy as per observation in 86th meeting of HPSEAC
(11.)20/03/2023Please find enclosed ADS reply..ADS Letter
(12.)20/04/2023Kindly submit the documents as per observation in 90th meeting of HPSEAC.
(13.)09/05/2023Please find enclosed ADS reply.ADS Letter
(14.)13/06/2023Kindly submit the documents as per observation in 93rd meeting of HPSEAC.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDilip Kumar Bera
DesignationSr. Manager - Environment
Name of Company (Applicant Name should not be given here)M/s Vedanta Limited(Division Cairn Oil & Gas)
Address4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002
Print