1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil and Gas Exploration, Appraisal and Early Production in Block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal Pradesh | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)Telephone No. | 124-4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Minor Project/Activity | NIL | (c)Category | B2 | (d)Proposal Number | SIA/HP/IND2/176745/2020 | (e)Master Proposal Number(Single Window) | SW/176729/2020 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | H43E13, H43E14, H43E15 | (b)Pincode | 175019 | (c)Bounded Latitudes (North) | | From | | Degree | 31.52930028 | Minutes | | Second | | From | | Degree | 31.70930889 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.95361111 | Minutes | | Second | | From | | Degree | 76.95792222 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43E13,H43E14,H43E15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 1200 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.5 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Himachal Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Himachal Pradesh | Mandi | S/Nagar | sunder Nagar | |
|
6. | Details of Terms of Reference (ToR): | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | It is a B2 Category Project | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Onshore Oil & Gas Exploration and Appraisal | 7 wells | 2 exploratory 5 EPU | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Natural Gas | 0.6 | Others | MMSCFD | Others | Captive | (2.) | Crude Oil | 4000 | Others | BOPD | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 201.835 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 1.40 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 3.02 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 1.54 | (e) Funds Allocated for Environment Management Capital(%) | 0.69 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1800 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1800 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | High speed diesel | 27 | Kilo Litre per Day | | Local | Road | | 0 | Open Market | | Copy of Linkage | (2.) | Water Based Mud | 1000 | Others | cubic meter per well | supply from local Manufacturer | Road | | 0 | Open Market | | Copy of Linkage | (3.) | Synthetic Based Mud | 800 | Others | cubic meter per well | supply from local Manufacturer | Road | | 0 | Open Market | | Copy of Linkage | (4.) | Natural gas | 283.16 | Others | cubic meter per hour | Local | Road | | 0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Mar 2019 To 15 Jun 2020 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 77.1 | 27.9 | 63.5 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 39.7 | 12 | 30.5 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 16.7 | 6.6 | 13.5 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 23 | 9.8 | 18.3 | 80 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 406 | 202 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 122 | 36 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.5 | 0.2 | 1.0 | 1.5 | (5.) | Total Hardness | | | mg/l | | 228 | 92 | 200 | 600 | (6.) | pH | | | NA | | 7.79 | 6.68 | 6.5 | 8.5 | |
14.3. No. of Surface Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.1 | 5.5 | A | (2.) | pH | | NA | | 7.35 | 6.86 | A | (3.) | BOD | | mg/l | | 0 | 0 | A | (4.) | COD | | mg/l | | 0 | 0 | A | (5.) | Others | TDS | mg/l | | 262 | 140 | A | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 40.8 | 35.3 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 45.5 | 38.6 | 55 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.85 | 5.14 | (2.) | N(Nitrogen) | Percent | | 0.10 | 0.06 | (3.) | P(Phosphorus) | Kilogram per hectare | | 63.4 | 21.8 | (4.) | Electric Conductivity | Others | deciSiemens per metre | 0.75 | 0.22 | (5.) | K(Potassium) | Milliequivalents per 100 Gram | | 1.45 | 0.13 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.86 To 9.92 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.37 To 5.83 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tanker Supply | 102 | 10 | Copy of Permission Letter | modeOthers | Tanker Supply | Others | Tanker Supply | NA | 24 Sep 2020 | 87 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water during early production | 15 | 20 | Septic tank/soak pit/STP | Reuse within the Plant & Recycling | | 15 | | (2.) | Effluent from Drilling Operation | 40 | 50 | Mobile ETP | Others | discharge as per CPCB guidelines | 10 | 30 | (3.) | Domestic water during drilling | 12 | 15 | Septic tank/soak pit or STP | Reuse within the Plant & Recycling | | 12 | | (4.) | waste water during early production | 225 | 250 | Mobile ETP | Others | discharge as per CPCB guidelines | 0 | 225 | |
|
16.1. | (a)Total Waste Water Generation | 292 | (b)Total Discharged Water | 255 | (c)Total Reused Water | 37 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drill Cutting Associated with WBMl | Others | Solid/Non-hazardous waste | 750 | Tons | 0 | Road | | Others | HDPE lined pit | (2.) | Domestic Waste | Municipal Solid Waste | | 0.03 | Tons | 0 | Road | | Others | Compost pit | (3.) | Spent WBM | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 0 | Road | | Others | As per hazardous waste rule | (4.) | Drill Cutting Associated with SBM | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1500 | Tons | 0 | Road | | Others | As per hazardous waste rule 2016 | (5.) | Sludge containing oil and other drilling waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 500 | Tons | 0 | Road | | Others | As per hazardous waste rule 2016 | (6.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 0 | Road | | Others | As per hazardous waste rule 2016 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 77.1 | 0.05 | 0.41 | 77.51 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 6.6 | 0.05 | 0.82 | 7.43 | 80 | (3.) | NOx | | Microgram per Meter Cube | 23 | 0.05 | 0.20 | 23.21 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 39.7 | 0.05 | 0 | 39.7 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1000 kVA DG set at drilling site | HSD | 10 | 0.2 | PM10,SO2,NOx | | 0.005, 0.24,0.14 | (2.) | 250 kVA D.G. Set AtLiquid MudPlantee | HSD | 7 | 0.21 | PM10,SO2,NOx | | 0.0004, 0.02,0.02Camp Site | (3.) | 350 kVAD.G.Set AtCamp Site | HSD | 7 | 0.21 | PM10,SO2,NOx | | 0.0004, 0.02,0.02Camp Site | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2950 | (b)Source | DG & GEG | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Campsite:350 kVA,Drilling:1000,RR:100,LMP:250 kVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 9 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 0.0580 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 0.003056 | (e)Settlements | 0.0017 | (f)Industrial | 0 | (g)Forest | 0.039235 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Scrub land and vegetation and plantation | 0.127537 | Total | 0.229528 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Others | Each Well Pad | 9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | None | 0 | None in study area | (2.) | Wildlife Corridors | None | 0 | None in study area | (3.) | ESZs | ESZ around Nargu wildlife sanctuaryl | 3.6 | ESZ around Nargu wildlife sanctuary - 3.6 km NE | (4.) | ESAs | ESZ around Bandli wildlife sanctuary 3.6 km NE | 2.7 | South direction from block boundaryry 3.6 km NE | (5.) | WLS | ESZ around Shikari devi wildlife sanctuarykm NE | 8.9 | ESZ around Shikari devi wildlife sanctuary - 8.9 km E from block boundaryo | (6.) | Critically Polluted Area | None | 0 | None in study area | (7.) | Corridors | None | 0 | None in study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | None in study area | (2.) | Forest | | Forest | 0 | Forest present within the block | (3.) | Defence Installations | | None | 0 | None in study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 9 | (c)Status of Land acquisition if not acquired | Land yet to be acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Suketi Khad River Beas River Uhl Rivertuarykm NE | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Suketi Khad River Beas River Uhl Rivertuarykm NE | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 80 | (e)No. of working days | 90 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 2.97 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 4800 | (d)Funds Allocated for Plantation | 0 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | 1.Employment Potential :The project has a potential to generate direct andindirect employment for unskilled, semi-skilled and skilled manpower . Indirectemployment through services for the personnel | (2.) | Financial | Revenue Earning of Central & State Government: Both, State Government andGovt of India would be benefited with the hydrocarbon discovery andsubsequently its production from the block | (3.) | Environmental | Green Belt Development | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 085 | (ii)Name of the EIA Consultant | Eco Chem Sales & Services | (iii)Address | Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health Club, Surat – 395 001 | (iv)Mobile No. | 9825123805 | (v)Landline No. | 2612231630 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 26 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 04/03/2021 | EDS | EDS Letter | (2.) | 05/06/2021 | The correction have been made as per the instruction received | | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 16/10/2021 | For further na. | ADS Letter | (2.) | 22/11/2021 | We would like to request you to consider our project in upcoming SEAC Meeting Agenda. | ADS Letter | (3.) | 08/12/2021 | Kindly resubmit with observations as per 83rd meeting of SEAC. | ADS Letter | (4.) | 18/08/2022 | Request Letter to consider our project in next month SEAC Meeting Agenda | ADS Letter | (5.) | 23/09/2022 | As per observation of 86th meeting of HPSEAC | ADS Letter | (6.) | 18/10/2022 | Submission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal Pradesh | ADS Letter | (7.) | 05/01/2023 | Kindly submit the documents as per observation 86th meeting | ADS Letter | (8.) | 21/02/2023 | Resubmission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal Pradesh | ADS Letter | (9.) | 21/02/2023 | Resubmission of ADS reply for Onshore Oil & Gas Exploration, Appraisal and Early Production in block HF-ONHP-2017/1 in Mandi & Bilaspur Districts, Himachal Pradesh | ADS Letter | (10.) | 25/02/2023 | Kindly submit the hard copy and soft copy as per observation in 86th meeting of HPSEAC | | (11.) | 20/03/2023 | Please find enclosed ADS reply.. | ADS Letter | (12.) | 20/04/2023 | Kindly submit the documents as per observation in 90th meeting of HPSEAC. | | (13.) | 09/05/2023 | Please find enclosed ADS reply. | ADS Letter | (14.) | 13/06/2023 | Kindly submit the documents as per observation in 93rd meeting of HPSEAC. | | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Kumar Bera | Designation | Sr. Manager - Environment | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|