Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name API Manufacturing Unit by M/s Biozenta Lifescience Private Limited Company/Organisation Name M/S BIOZENTA LIFESCIENCE PVT. LTD.
Registered Address Khasra nos. 59, 60 and 61,Una,Himachal Pradesh-174301 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Deep Narayan Sharma
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Khasra nos. 59, 60 and 61,Una,Himachal Pradesh-174301
(d)Pin code 174301
(e)E-mail biozenta@gmail.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/Activity5(f)-API
(c)Category B2
(d)Proposal Number SIA/HP/IND2/175292/2020
(e)Master Proposal Number(Single Window) SW/175283/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshUnaUna/HaroliTahliwal
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project API manufacturing unit proposed at Industrial Area - Tahliwal, Tehsil – Haroli, District – Una (HP)
Town / Village
(Name of more than one town may be entered by separating with)
Industrial Area Tahliwal Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot No. 2A, Phase I and II.
State Himachal Pradesh District Una
Tehshil Una/Haroli Pincode 174301
Nearest railway station Naya Nangal Railway Station Distance from the project site 9.17
Nearest airport Chandigarh Airport Distance from the project site 125
Nearest Town/City/District Headquarters Una Distance from the project site 18
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Industrial Area Development Agency, 0197-5223002 Address: Office of The General Manager, District Industry Center, Una, HP Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 1741.29 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) NA
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The project “Biozenta Lifescience Private Limited” is an API manufacturing unit proposed at Industrial Area - Tahliwal, Tehsil – Haroli, District – Una (HP). The project site project falls under Government industrial Area.
1.2 Clearance of existing land, vegetation and buildings? No Vacant land. Land shall be prepared as per requirement of industrial project. Land lease agreement is attached.
1.3 Creation of new land uses? No No new land use will be created as the Land acquired for the project was already under industrial purpose. Copy of lease deed is attached.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes The pre-construction investigations have already been done.
1.5 Construction works? Yes The project requires construction of industrial shed along with all necessary associated facilities such as administrative office, storage facilities, fire fighting facilities, security office, utility shed and parking
1.6 Demolition works? No Not Applicable. However, existing building under the project will be renovated and utilized for the project.
1.7 Temporary sites used for construction works or housing of construction workers? Yes The manpower required during construction period shall be around 25. Temporary hutments and sanitation facilities shall be provided for these workers within the project site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Excavation will be done out for the foundation of building. Soil excavated will be stored within project site & will be used for cutting & filling and landscaping.
1.9 Underground works including mining or tunneling? No No underground mining or tunneling would be required
1.10 Reclamation works? Yes Soil would be reclaimed wherever applicable for leveling
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes This is a pharmaceutical manufacturing process. All processes shall be carried out as per GMP.
1.14 Facilities for storage of goods or materials? Yes Construction materials shall be brought as and when required and stored at the site in a covered area. Chemicals shall be stored in a designated location inside the premises with full protection from spills, leakages and fires. Risk Assessment study for storage of hazardous materials will be carried out.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes ETP cum STP of Capacity 10 KLD Capacity for treatment of effluent generated.SW of about 15-20 kg/day There will be generation of hazardous waste which shall be categorized as - 5.1: Used or spent oil- 20 ltr/annum; 35.3: Chemical sludge from wastewater treatment- 360 kgs/annum; 37.2: Flue gas cleaning residue-25 kgs/annum; 28.1: Process Residue and wastes-40 kgs/annum; 28.2: Spent catalyst-Nil Kgs/annum. Paper waste, drum of raw materials will be transported to Hazardous Waste Management site
1.16 Facilities for long term housing of operational workers? No The employees would make their own arrangement of boarding and lodging.
1.17 New road, rail or sea traffic during construction or operation? Yes New internal connecting roads are proposed to be constructed from the existing roads.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new infrastructure for this purpose shall be required. The site has well connected roads. Only internal circulation road to be made.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There is no need of diversion of existing transport routes.
1.20 New or diverted transmission lines or pipelines? No New electrical transmission lines will be laid to get the electricity. Also in due course of time water pipelines may be laid and connected to main industrial area water connection.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers is proposed.
1.22 Stream crossings? No There is no stream crossing through or adjoining the site. A tributary of seasonal swain is following at a distance of approx. 1500 m from the project site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes Unit has obtained permission of water supply and paid charges for the same to General Manager Department of Industries.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Industry has been planned in such a way that it does not effect the existing drainage.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During construction phase, movement of 5-6 vehicles shall be there including those of supervising the work. During operation phase, the vehicles as average four LCVs and 2-3 Trucks shall be used for the transportation of raw materials and products. Arrangements would be made with minimal disturbance to existing traffic and all constructional material transportation would be covered and sprinkled with water to minimize fugitive dust.
1.26 Long-term dismantling or decommissioning or restoration works? No Not Applicable
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? No There shall be no influx but routine movement of people. The maximum number of workers engaged in construction at any time shall not be more than 25. Total number of employees of the Project will be 74.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No There will be no significant impact on the loss of native species or genetic diversity
1.31 Any other actions? No Not Applicable
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Not Applicable
2.2 Water (expected source & competing users) unit: KLD Yes During operation phase, water supply will be provided from Department of Industries. The total water requirement will be 20 KLD.
2.3 Minerals (MT) No Not Applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material is required for establishing the unit.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total Power requirement of 98 KW will be provided by HP State Electricity Board, 1 DG Set of capacity 150 KVA is proposed for standby use.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No LSD will be used as a fuel for operation of DG sets. Details regarding Hazardous waste are given in Pre-feasibility report.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not Applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes There would be employment generation for the local peoples
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not Applicable
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No It is an industrial estate hence, there is no spoil, overburden or mine waste.
4.2 Municipal waste (domestic and or commercial wastes) Yes Recyclable paper waste will be generated from the unit. This waste will be sold to the local kabadis. Approximately 25 Kg/ day solid waste will be generated which will be disposed off carefully.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes There will be generation of hazardous waste which shall be categorized as - 5.1: Used or spent oil- 20 ltr/annum; 35.3: Chemical sludge from wastewater treatment- 360 kgs/annum; 37.2: Flue gas cleaning residue-25 kgs/annum; 28.1: Process Residue and wastes-40 kgs/annum; 28.2: Spent catalyst-Nil Kgs/annum. Paper waste, drum of raw materials will be collected at a particular point from where they shall be lifted and transported to Hazardous Waste Management site.
4.4 Other industrial process wastes Yes Process wastes shall be properly categorized and disposed off as per norms
4.5 Surplus product Yes Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Sludge will be stored in HDPE bags and will be disposed to authorized TSDF site
4.7 Construction or demolition wastes Yes No demolition will take place. Construction waste generated due to construction will be disposed off as per the construction and demolition waste rules and guidelines.
4.8 Redundant machinery or equipment No Not Applicable
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes No Not Applicable
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes Emissions will be generated from DG set and boiler
5.2 Emissions from production processes Yes Stack emissions details are as provided PFR
5.3 Emissions from materials handling including storage or transport Yes At the time of transportation, there will be fugitive dust which shall be kept under control through appropriate covers
5.4 Emissions from construction activities including plant and equipment Yes During constructional phase there will be fugitive emission from constructional equipments. Water sprinkling shall be done to minimize dust suppression. And appropriate covers will be provided to control the emissions.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust/odour would be generated during handling of construction materials, paints and varnishes. Adequate precautions shall be taken to reduce those impacts on construction workers and the surrounding environment.
5.6 Emissions from incineration of waste No NA
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No Burning of waste in open air would be done
5.8 Emissions from any other sources Yes Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Unit shall install 1 DG set of 150 KVA capacity for standby use. The DG set shall be with in-built acoustic enclosure as approved by CPCB and conforming to MoEF Notification, GSR 371 (E).
6.2 From industrial or similar processes Yes All necessary engineering controls shall be deployed to keep the noise level as reasonably low
6.3 From construction or demolition No Not Applicable
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes The Operation involves the movement of 5-10 personal vehicles daily as well as 15 trucks per month. The driver are made aware from time to time not to use power horns. The unit has also planted rows of trees of suitable local varieties.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Hazardous wastes generating from the project if any, shall be disposed as per the Hazardous Waste (Management and Handling Rules), 2016
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No ETP cum STP of 10 KLD would be constructed for management of effluent
7.3 By deposition of pollutants emitted to air into the land or into water No Emission would be well treated before dispersion in air. Broad leaved trees shall be planted which would serve as pollutant sink/buffer.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Yes Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No NOC from fire department will be obtained
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes According to the Indian Seismic Zone Map, District Una lies in Seismic Zone V which means the higher risk of earthquake, thus adequate structural concepts will be adopted.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes The project will lead to both social and economic development of the area. The skilled as well as unskilled people will be employed in the industry and imparted extensive training to ensure their smooth induction and to ensure high quality services and products. The API to be produced will support treatment of Corona infections and thus supply necessary pharma materials for the same.
9.2 Lead to after-use of the site, which could have an impact on the environment No No environmental impact envisaged
9.3 Set a precedent for later developments No Not Applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No The project lies within planned Industrial Area, thus cumulative effects will be managed within Industrial area through appropriate technologies and EMP.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Swan River – 3.5 km
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No no schedule 1 species is present
4 Inland, coastal, marine or underground waters No No
5 State, National boundaries No No
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes Approx. 0.6m (Shiv Mandir)
7 Defence installations No No
8 Densely populated or built-up area No The demographic details is attached along
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Primary Health Center, Tahliwal
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No No
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No The area is not subjected to any environmental damage.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No The area has not faced any natural hazard so far.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)12/01/2021EDSEDS Letter
(2.)01/02/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDeep Narayan Sharma
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S BIOZENTA LIFESCIENCE PVT. LTD.
AddressKhasra nos. 59, 60 and 61
Print