(a)Name of the project(s) M/s Atlas Steel Industries Pvt. Ltd. proposed Steel Manufacturing Unit at Village Kalruhi, Tehsil Amb, District Una, Himachal Pradesh.
(b)Name of the Company / Organisation M/S ATLAS STEEL INDUSTRIES PVT. LTD.
(c)Registered Address Village Kalruhi, Tehsil Amb, Distt. Una,,Una,Himachal Pradesh-177203
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Harjinder Singh Riyar
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address M/s Atlas Steel Industries Pvt. Ltd.,Village Kalruhi, Tehsil Amb, Distt. Una,Amb,Una,Himachal Pradesh-177203
(d)Pin code 177203
(e)E-mail atlassteelindustries@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/HP/IND/68577/2021
(e)Master Proposal Number(Single Window) SW/235081/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2377/505 and 515
(b)Pincode 177203
(c)Bounded Latitudes (North)
From
Degree 31
Minutes 42
Second 6.56
From
Degree 76
Minutes 5
Second 24.90
(d)Bounded Longitudes (East)
From
Degree 31
Minutes 42
Second 14.13
From
Degree 76
Minutes 5
Second 36.04
(e)Survey of India Topo Sheet No. H43E1, H43E2, H43D13 and H43D14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1524
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshUnaAmb(T)Kalruhi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number HP SEIAA/2021/844-587
(b)Date of Apply of TOR 21 Jun 2021
(c)Date of Issue of TOR / Standard ToR 03 Jul 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :16 Aug 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :0
Open ground adjoining to project site
State :Himachal Pradesh
District :Una
Tehsil :Amb(T)
Village :Kalruhi
88Related to employmentOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rolling Mill1
(2.)Induction Furnace1
(3.)Pipe Plant1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Bars72000Tons per AnnumRoad
(2.)HR Pipes34000Tons per AnnumRoad
(3.)Flats34000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 21 Oct 2021
(iv)Valid Upto 21 Oct 2021
(v)File No. 1
(vi)Application No. 1
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 87.03
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.30
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.14
(e) Funds Allocated for Environment Management Capital(%) 1.49
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 78625
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 78625
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)MS Scrap & Ferro Alloys78625Tons per AnnumLocal market & importRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 May 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMicro Gram per Meter Cube0.770.410.744
(2.)PM10Micro Gram per Meter Cube95.75193.7100
(3.)SO2Micro Gram per Meter Cube14713.680
(4.)NOxMicro Gram per Meter Cube291628.980
(5.)PM2.5Micro Gram per Meter Cube572955.460
    14.2.     No. of Ground Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l325180200600
(2.)Chloridesmg/l48252501000
(3.)Fluoridemg/l0.890.511.01.5
(4.)Heavy MetalsIronmg/l0.290.1210
(5.)Total Hardnessmg/l18670200600
(6.)TDSmg/l3942335002000
(7.)pHNA7.8078.50
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.52.2E
(2.)pHmg/l7.787.73E
(3.)DOmg/l7.16.9E
(4.)CODmg/l88E
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))57.554.970
(2.)Leq(Day)A-weighted decibels(dB(A))68.265.675
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.697.74
(2.)P(Phosphorus)Milligram per Kilogram176101
(3.)K(Potassium)Milligram per Kilogram55122
(4.)N(Nitrogen)Percent153.4
(5.)Electric ConductivityOthersmmhos/cm0.3360.178
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.50 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater23.50Copy of Permission LetterPipelineOthersBorewell021 Oct 202123.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater10.515STPReuse within the Plant & Recycling10.5
16.1.
(a)Total Waste Water Generation 10.5
(b)Total Discharged Water 0
(c)Total Reused Water 10.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic Solid WasteOthersDomestic Solid Waste0.047Tons0RoadOthersSWM, 2016
(2.)Solid WasteIndustrial Waste6.5Tons75RoadCo-Processing
(3.)Hazardous WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Hazardous WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.4Kilolitre100RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube13.81.63.21780
(2.)PM2.5Microgram per Meter Cube93.71.66.45100.1560
(3.)PM10Microgram per Meter Cube93.71.66.45100.15100
(4.)Others(Specify)COMicrogram per Meter Cube0.741.60.01290.754
(5.)NOxMicrogram per Meter Cube28.81.619.348.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G setH.S.D50.4NOx19.3
(2.)Induction FurnaceElectricity251PM106.45
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17000
(b)Source Himachal Pradesh HP State Electricity Board Ltd.
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.84
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.84
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 21,818.5
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1,515.4
(e)Settlements 161
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Plantation 8,803
    Total 191
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.84
Total 3.84
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone0Not found within 10 km of the study area
(2.)Wildlife CorridorsNone0Not found within 10 km of the study area
(3.)NPANone0Not found within 10 km of the study area
(4.)ESZsNone0Not found within 10 km of the study area
(5.)CorridorsNone0Not found within 10 km of the study area
(6.)Critically Polluted AreaNone0Not found within 10 km of the study area
(7.)WLSNone0Not found within 10 km of the study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0Not found within 10 km of the study area
(2.)Archaeological SitesNone0Not found within 10 km of the study area
(3.)Defence InstallationsNone0Not found within 10 km of the study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.84
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Soan River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Katauhar
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 184
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 204
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.294
(b)Percentage of Total Project Area 33.70
(c)No. of Plants to be Planted 1941
(d)Funds Allocated for Plantation 5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIncrease in the green belt within the project premises and area looks athletics.
(2.)FinancialGenerate revenue to the state.
(3.)SocialGeneration of employment direct as well as indirect. Improvement of living standard of peopole.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA 0211
(ii)Name of the EIA Consultant Eco Laboratories & Consultants Pvt. Ltd.
(iii)Address E 207, Phase VIII B, Sector 74, Industrial Area, SAS Nagar, Mohali, Punjab
(iv)Mobile No. 9814003103
(v)Landline No. 0172461622
(vi)Email Id md@ecoparyavaran.org
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 17 Dec 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)27/10/2021Kindly submit the hard copy and soft copy of the proposal (Soft copy size less then 50MB)
(2.)20/11/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHarjinder Singh Riyar
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S ATLAS STEEL INDUSTRIES PVT. LTD.
AddressVillage Kalruhi, Tehsil Amb, Distt. Una