Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Steel Manufacturing Unit namely “Salsan Steels Pvt. Ltd.”
(b)Name of the Company / Organisation M/S SALSAN STEELS PVT. LTD.
(c)Registered Address Ram Nagar Ind. Area Gagret, Tehsil- Amb, District- Una, Himachal Pardesh,,Una,Himachal Pradesh-144008
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ranjan Rana
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address Ram Nagar Ind. Area Gagret, Tehsil- Amb, District- Una, Himachal Pardesh,Una,Himachal Pradesh-144008
(d)Pin code 144008
(e)E-mail steelssalsan2@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/HP/IND/57758/2015
(e)Master Proposal Number(Single Window) SW/209231/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Ram Nagar, Industrial Area, Gagret, Tehsil Amb, Di
(b)Pincode 144008
(c)Bounded Latitudes (North)
From
Degree 31.66
Minutes
Second
From
Degree 76.06
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 31.67
Minutes
Second
From
Degree 76.07
Minutes
Second
(e)Survey of India Topo Sheet No. H43E2 & H43D14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1041
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Himachal Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Himachal PradeshUnaAmbRam Nagar Industrial Area
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number HPSEIAA/2015/438
(b)Date of Apply of EC 03 Oct 2015
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Mar 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Apr 2021
Distance of Public Hearing Venue from the Proposed Project :0.5
Open ground opposite to M/s MBD Printographics Pvt. Ltd.
State :Himachal Pradesh
District :Una
Tehsil :Amb
Village :Ram Nagar, Industrial area Gagret
60Employment, smoke emission, air, water and noise pollutionDeputy Commissioner
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Dehradun
(iii)Letter No. NC-RO/ENV/IND/HP/9/2016/2403
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT Saria & MS Bars etc7913227788106920Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Steel manufacturing unit having plot area3.53 acres8.4 acres11.93 acres
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Aug 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. HPSPCB/PCB-ID18733/2397-99
(vi)Application No. HPSPCB/PCB-ID18733/2397-99
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 60.6579
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.145
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.27
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.11
(e) Funds Allocated for Environment Management Capital(%) 1.89
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 36194
(b)Existing quantity of raw material/fuel 82180
(c)Total quantity of raw material/fuel 118374
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Scrap & ferro alloys118374Tons per AnnumLocal MarketRoad4.5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2020 To 30 Nov 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube56.928.645.360
(2.)SO2Micro Gram per Meter Cube13.98.310.680
(3.)PM10Micro Gram per Meter Cube95.750.779.8100
(4.)NOxMicro Gram per Meter Cube29.116.122.280
(5.)OthersCOMili Gram per Meter Cube0.770.410.654
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.876.58.5
(2.)Chloridesmg/l48252501000
(3.)Fluoridemg/l0.890.6511.5
(4.)Heavy MetalsCoppermg/l0.020.020.051.5
(5.)TSSmg/l0000
(6.)Total Hardnessmg/l18670200600
(7.)TDSmg/l3942335002000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.787.73E
(2.)DOmg/l7.16.9E
(3.)BODmg/l22E
(4.)CODmg/l88E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.446.875
(2.)Leq(Night)A-weighted decibels(dB(A))57.535.670
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram176101
(2.)pH8.597.74
(3.)N(Nitrogen)Percent1610
(4.)K(Potassium)Milligram per Kilogram55122
(5.)Electric ConductivityMilliequivalents per 100 Gram0.3210.179
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.00 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.50 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater41.50Copy of Permission LetterPipelineTube WellIPH-SE-P&I-II-EE-GWA/2018:-790-9329 May 201841.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater710STPReuse within the Plant & Recycling7
16.1.
(a)Total Waste Water Generation 7
(b)Total Discharged Water 0
(c)Total Reused Water 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic solid wasteMunicipal Solid Waste11.2Tons0RoadOthersAs per solid waste management rules, 2016
(2.)SlagIndustrial Waste1960Tons7RoadCo-Processing
(3.)APCD DustHazardous Waste (as per Hazardous and Other Waste Management rules 2016)280Tons7RoadAuthorized Recyclers
(4.)Spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Kilolitre7RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube38.223.441.760
(2.)Others(Specify)CONA0.774.40.01550.7854
(3.)SO2Microgram per Meter Cube144.43.8517.8580
(4.)NOxMicrogram per Meter Cube294.413.342.380
(5.)PM10Microgram per Meter Cube95.728.65104.35100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD50.4PM100.096
(2.)IF of 12 TPHElectricity321.0PM100.58
(3.)IF of 12 TPHElectricity321.0PM100.58
(4.)Rolling millElectricity261.0PM100.35
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 16000
(b)Source HPSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG set of 500 kVA capacity
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 4.82962
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.82962
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 4.82962
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 4.82962
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersPlant area including green area4.82962
Total 4.82962
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0None
(2.)ESAsNA0None
(3.)CorridorsNA0None
(4.)Wildlife CorridorsNA0None
(5.)Critically Polluted AreaNA0None
(6.)ESZsNA0None
(7.)WLSNA0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0None
(2.)Defence InstallationsNA0None
(3.)Archaeological SitesNA0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.8296
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 110
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 350
(f)Total Manpower 130
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt012961296
(2.)Percentage of Total Project Area02.62
(3.)No. of Plants10604614
(4.)Funds Allocated0500000500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalLandscaping
(2.)SocialEmployment
(3.)FinancialRevenue to society
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0032
(ii)Name of the EIA Consultant Eco Laboratories & Consultants Pvt. Ltd.
(iii)Address E-207, Industrial Area, phase VIII-B, Mohali, Punjab
(iv)Mobile No. 9814003103
(v)Landline No. 0172461622
(vi)Email Id md@ecoparyavaran.org
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 09 Jun 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRanjan Rana
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)M/S SALSAN STEELS PVT. LTD.
AddressRam Nagar Ind. Area Gagret, Tehsil- Amb, District- Una, Himachal Pardesh