1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposed Common Biomedical Waste Treatment Facility at Kahara Pathar village, Barpeta district, Assam by Ksepya Environment Management Private Limited | (b)Name of the Company / Organisation | KSEPYA ENVIRONMENT MANAGEMENT PRIVATE 1 LIMITED | (c)Registered Address | Kahara Pathar, Bhawanipur, Dist Barpeta, Assam,,Barpeta,Assam-781352 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Golam Mustafa Kamal | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | 293, Helanarpam, Howly, District- Barpeta,,,Sarthebari,Barpeta,Assam-781316 | (d)Pin code | 781316 | (e)E-mail | ksepyabmw@gmail.com | (f)Telephone No. | 361-2517840 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 7(d)(a)Common Bio-Medical Waste Treatment Facility
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/AS/MIS/49659/2020 | (e)Master Proposal Number(Single Window) | SW/226464/2021 | (f)EAC concerned (for category A Projects only) | INFRA-1 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Dag No 69,576,571,572; Patta No. 26,91,87 | (b)Pincode | 781316 | (c)Bounded Latitudes (North) | | From | | Degree | 91 | Minutes | 05 | Second | 33.3 | From | | Degree | 91 | Minutes | 05 | Second | 37.2 | (d)Bounded Longitudes (East) | | From | | Degree | 26 | Minutes | 28 | Second | 15.9 | From | | Degree | 26 | Minutes | 28 | Second | 17.4 | (e)Survey of India Topo Sheet No. | 78J14,78J15,78N2,78N3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 42.97 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.5 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Assam | Barpeta | Sarupeta | Kahara Pathar | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | | (c)Date of Apply of TOR | 10 Jan 2020 | (d)Date of Issue of TOR / Standard ToR | 29 Feb 2020 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Dec 2020 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Sri Rabendra Baishya’s land, village Banglipara, P.O Bhawanipur, Dist Barpeta, Assam | State : | Assam | District : | Barpeta | Tehsil : | Sarupeta | Village : | Banglipara |
| 40 | disposal of waste material from the proposed project and Green Belt development in proposed site | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Incinerator- 1+1 | 50 kg/hr | 1+1 (Standby Incinerator) | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Biomedical Waste from HCFs within 75 Km | 10000 | Others | Beds | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 0.48 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.25 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.0625 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.045 | (e) Funds Allocated for Environment Management Capital(%) | 52.08 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 10000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Biomedical Waste | 10000 | Others | Beds | HCFs within 75 Km | Road | | 75 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2021 To 31 May 2021 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 45.32 | 24.53 | 44.61 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 22.89 | 11.25 | 21.86 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 8.3 | 3.9 | 8.09 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 85.96 | 50.24 | 85.81 | 100 | |
14.2. No. of Ground Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | Total Hardness | | | mg/l | | 112 | 95 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 17.23 | 14.05 | 250 | 1000 | (4.) | Heavy Metals | | cd | mg/l | | 0 | 0 | 0.003 | 0.003 | (5.) | TDS | | | mg/l | | 372.4 | 245 | 500 | 2000 | (6.) | pH | | | NA | | 7.58 | 7.18 | 6.5 | 8.5 | (7.) | Fluoride | | | mg/l | | 0.23 | 0.18 | 1 | 1.5 | |
14.3. No. of Surface Water Monitoring Locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 2 | 2 | C | (2.) | COD | | mg/l | | 12.5 | 10 | C | (3.) | pH | | NA | | 7.57 | 7.33 | C | (4.) | DO | | mg/l | | 8.6 | 8.2 | C | |
14.4. No. of Ambient Noise Monitoring Locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.6 | 50.2 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 47.8 | 38.8 | 55 | |
14.5. No. of Soil Sample Monitored Locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.56 | 6.9 | (2.) | P(Phosphorus) | Kilogram per hectare | | 142.5 | 32.5 | (3.) | K(Potassium) | Kilogram per hectare | | 260.5 | 89.5 | (4.) | N(Nitrogen) | Kilogram per hectare | | 88.5 | 45.4 | (5.) | Electric Conductivity | Others | µmhos/cm | 758 | 356 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.83 To 6.55 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.52 To 5.92 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 3 | 0 | Copy of Permission Letter | modeOthers | Tube well | Tube Well | | NOC will be applied after EC application | 27 Aug 2021 | 3 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Floor Wash, Vehicle Wash, Process | 0.5 | 3 | ETP | Reuse within the Plant & Recycling | | 0.5 | | (2.) | Domestic Waste water | 0.8 | 1 | Soak pit | Others | Soak pit | 0.8 | 0 | |
|
16.1. | (a)Total Waste Water Generation | 1.3 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 1.3 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Incineration Ash | Bottom Ash | | 18.2 | Tons | 75 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 22.89 | 1 | 0.01 | 22.89 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 85.96 | 1 | 0.01 | 85.97 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 8.3 | 5 | 0.01 | 8.31 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 45.32 | 1 | 0.01 | 45.33 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Incinerator stack | Diesal | 30 | 1.5 | PM10 | | 0.01 | (2.) | DG set | Diesal | 6 | 0.1 | PM10 | | 0.01 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | APDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 0.98 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 0.98 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 26289 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 821 | (e)Settlements | 4305 | (f)Industrial | 0 | (g)Forest | 0 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : 0 | 0 | Total | 31415 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Main Plant | | 0.2 | | (2.) | Green belt | | 0.35 | | (3.) | Others | open area | 0.43 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | ESZs | NA | 0 | NA | (3.) | ESAs | NA | 0 | NA | (4.) | NPA | NA | 0 | NA | (5.) | Corridors | NA | 0 | NA | (6.) | Wildlife Corridors | NA | 0 | NA | (7.) | WLS | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Forest | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pahumara River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 16 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 21 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 0.35 | (b)Percentage of Total Project Area | 35.71 | (c)No. of Plants to be Planted | 1000 | (d)Funds Allocated for Plantation | 50000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Scientific Management of BMW | (2.) | Environmental | Scientific Management of BMW | (3.) | Social | Employment generation | (4.) | Social | Employment generation | (5.) | Social | Employment generation | (6.) | Social | Employment generation | (7.) | Social | Employment generation | (8.) | Environmental | Scientific Management of BMW | (9.) | Environmental | Scientific Management of BMW | (10.) | Environmental | Scientific Management of BMW | (11.) | Environmental | Scientific Management of BMW | (12.) | Environmental | Scientific Management of BMW | (13.) | Environmental | Scientific Management of BMW | (14.) | Environmental | Scientific Management of BMW | (15.) | Environmental | Scientific Management of BMW | (16.) | Environmental | Scientific Management of BMW | (17.) | Environmental | Scientific Management of BMW | (18.) | Environmental | Scientific Management of BMW | (19.) | Environmental | Scientific Management of BMW | (20.) | Environmental | Scientific Management of BMW | (21.) | Social | Employment generation | (22.) | Social | Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0.98 | (e)Total built up area (sqm) | 0.2 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 1 | Capacity | 1000 | (b)No. of Recharge Pits | 1 | Capacity | 1000 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 0.43 hectare open space is available | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED light, Solar Lights | (b)Percentage | 20 | (c)Quantity | 50 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1922/RA 0128 REV 01 | (ii)Name of the EIA Consultant | Shivalik Solid Waste Management Limited | (iii)Address | SCO 20-21, Ist Floor,Baltana, Zirakpur, 140604 | (iv)Mobile No. | 9417746337 | (v)Landline No. | 0176250949 | (vi)Email Id | drranjnasswm@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 16 Feb 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 07/11/2022 | Land use map and cartosat/IKONOS satellite images of the area from which land use map is prepared. A write up on the classes required. •Correct names of the Board of Directors. •Flood inundation map for 100 years return period. •Details of residential and other houses within 500 mt. radius from the proposed location.
The Site visit has been attached please furnished all the documents which is asked in page- 6 of site visit. | EDS Letter | (2.) | 30/01/2023 | The correction have been made as per the instruction received | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Golam Mustafa Kamal | Designation | Partner | Name of Company (Applicant Name should not be given here) | KSEPYA ENVIRONMENT MANAGEMENT PRIVATE 1 LIMITED | Address | Kahara Pathar, Bhawanipur, Dist Barpeta, Assam |
|