Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil and Gas Exploration, Appraisal and Early Production in AA-ONHP-2017/3 Block in Tinsukia District of Assam
(b)Name of the Company / Organisation M/s Vedanta Limited(Division Cairn Oil & Gas)
(c)Registered Address 4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dilip Kumar Bera
(b)Designation (Owner/ Partner/ CEO) Sr. Manager - Environment
(c)Address
(d)Pin code 122002
(e)E-mail dilipkumar.bera@cairnindia.com
(f)Telephone No. 124-4594176
(g)Fax No. 4145612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B2
(d)Proposal Number SIA/AS/IND2/191148/2021
(e)Master Proposal Number(Single Window) SW/191145/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. G46/11, 83M15
(b)Pincode 786181
(c)Bounded Latitudes (North)
From
Degree 27.416664
Minutes
Second
From
Degree 27.449999
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 95.833329
Minutes
Second
From
Degree 95.833331
Minutes
Second
(e)Survey of India Topo Sheet No. G46/11, 83M15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 116
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamTinsukiaMargheritaTokapathar No. 2
6.
Details of Terms of Reference (ToR):
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is a Category B2 Project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)8 Well Pad60 daysFor exploration & appraisal of hydrocarbons.
(2.)EPU 2 number90 daysProduction of crude oil and associated NG
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Drilling of Exploratory and Appraisal Wells8OthersnumberOthersDrilling
(2.)Associated Natural gas0.8OthersMMSCFDOthersCaptive consumption in GEG
(3.)Crude oil4000OthersBOPDOthersRoad Tankers
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 240
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.10
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0
(e) Funds Allocated for Environment Management Capital(%) 0.04
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2098.16
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2098.16
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water Based Mud1800Othersm3/day/wellManufacturerOthersTrunks0 OthersManufacturerCopy of Linkage
(2.)HSD15Kilo Litre per DayLocalRoad0 OthersLocalCopy of Linkage
(3.)Natural gas283.16Othersm3/hrLocalRoad0 OthersLocalCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 10 Mar 2019 To 07 Jun 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube81.7033.7077100
(2.)PM2.5Micro Gram per Meter Cube46.3015.3043.0760
(3.)SO2Micro Gram per Meter Cube968.0680
(4.)OthersCOMili Gram per Meter Cube0.780.170.714
(5.)NOxMicro Gram per Meter Cube37.4013.9031.1680
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.366.566.58.5
(2.)TSSmg/l0000
(3.)Total Hardnessmg/l140402001000
(4.)Fluoridemg/l0.320.222501000
(5.)Chloridesmg/l2082501000
(6.)Heavy MetalsAsmg/l0.0050.0050.010.05
(7.)TDSmg/l176585001000
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.356.82B
(2.)CODmg/l324B
(3.)DOmg/l6.35.7B
(4.)BODmg/l3.82B
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))5653.955
(2.)Leq(Night)A-weighted decibels(dB(A))4543.745
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare25511487
(2.)pH5.584.96
(3.)N(Nitrogen)Kilogram per hectare156806426
(4.)K(Potassium)Kilogram per hectare55602501
(5.)Electric ConductivityOthersµmhos /cm92.929
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersApproved supplier during E&A870Copy of Permission LettermodeOthersRoad TankersOthersLocalNA21 Oct 201987
(2.)OthersApproved supplier during EP150Copy of Permission LettermodeOthersTanker supplyOthersLocalNA21 Oct 201915
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Trade effluent during EP1010ETPOthersDischarged as per CPCB / SPCB Standards100
(2.)Domestic Wastewater during EP22Septic tank and soak pitOthersDisposal through soak pit20
(3.)Effluent from drill head wash during E&A4050Mobile effluent treatment plantOthersre-used or disposal1030
(4.)Domestic water during E&A1212STPOthersRe-used for dust suppression, green belt120
(5.)Produced Water during EP225250ETPOthersdischarged as per CPCB / SPCB standards0225
16.1.
(a)Total Waste Water Generation 289
(b)Total Discharged Water 255
(c)Total Reused Water 34
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Drilling Mud with OilOthersHazardous Waste Cat – 2.3500Tons0RoadOthersAs per Hazardous Waste Rule 2016
(2.)Oily Sludge during EPOthersHazardous Waste Cat – 1.3, Sch 120Tons0RoadOthersWaste Rule 2016
(3.)Used or Spent OilOthersHazardous Waste Cat – 5.1, Sch 12Tons0RoadOthersDisposal with registered recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube37.4022865.480
(2.)PM2.5Microgram per Meter Cube46.302046.3060
(3.)PM10Microgram per Meter Cube81.7020.982.60100
(4.)SO2Microgram per Meter Cube920.089.0880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Drilling siteHSD100.2PM10,NOx2.04
(2.)Diesel Fired Heater or IWBHHSD60.15PM10,SO2,NOx ,OthersCO, HC2.04
(3.)Flare Well or extended well testingNG300.21PM10,SO2,NOx2.04
(4.)GEG 1 MWNG100.21SO2,NOx ,OthersHC, CO2.04
(5.)Liquid Mud PumpHSD60.21PM10,NOx2.04
(6.)DG Emergency during EPHSD60.15PM10,SO2,NOx2.04
(7.)Dual fuel fired Heater Treater for EPHSD60.15PM10,SO2,NOx ,OthersCO. HC2.04
(8.)Flaring for EPNG300.21PM10,SO2,NOx2.04
(9.)Camp SiteHSD60.21PM10,NOx2.04
(10.)Radio RoomHSD60.305PM10,NOx2.04
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2450
(b)Source DG sets exploration and appraisal
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 x 350 KVA DG Sets (camp site) (1 S), 1 x 1000 KV
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 9
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 9
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 6945
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 25
(e)Settlements 538
(f)Industrial 9
(g)Forest 8606
(h)Mangroves 0
(i)Marine Area 0
(j)Others : River (1398), Tea Estate (414), Natural Vegetation 10,700
    Total 16133
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersOnshore Oil and Gas E&A and EP9
Total 9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not present
(2.)WLSNA0Not present
(3.)Wildlife CorridorsNA0Not present
(4.)ESAsNA0Not present
(5.)ESZsNA0Not present
(6.)CorridorsNA0Not present
(7.)NPANA0Not present
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRF Upper Dihing,BuriDihing,Tinkopani0Within Block
(2.)Archaeological SitesNA0Not present
(3.)Defence InstallationsNA0Not present
(4.)OthersReserve ForestRF Namphai,Tirap,Kotha0Within Block
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Select
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land acquisition not started yet
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Schedule I Species has been recorded i.e. Asiatic Elephant, Hoolock Gibbon
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Yes
(iii)Period of Implementation During drilling
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Buri Dihing river flows diagonally within the block, from north east to south west
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 80
(e)No. of working days 60
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.97
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 4455
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialRevenue will be generated for both State and country during production phase
(2.)SocialThe community will be benefited through induced socio-economic development, employment generation and CSR activity
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0108
(ii)Name of the EIA Consultant AECOM India Private Limited
(iii)Address 9th Floor, Infinity Tower C DLF Cyber City, DLF Phase II Gurgaon, HR 122002, India
(iv)Mobile No. 9819068877
(v)Landline No. 0124487140
(vi)Email Id Chetan.Zaveri@aecom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 Jan 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)16/02/2021•Land use, land cover map with report and, also showing block boundaries of the leased area and well sites proposed in 1:50000 map scale. •Relief map in the form of shaded relief or classified. •Satellite images from which land use land cover map prepared with data of acquisition, and block boundary and proposed well site marked. Please submit following documents for further reconsideration.
(2.)17/03/2021EDS submittedADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDilip Kumar Bera
DesignationSr. Manager - Environment
Name of Company (Applicant Name should not be given here)M/s Vedanta Limited(Division Cairn Oil & Gas)
Address4th Floor, Vipul Plaza, Suncity Sector 54, Gurgaon, Haryana - 122002
Print