1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Onshore Oil and Gas Exploration, Appraisal and Early Production in AA-ONHP-2017/3 Block in Tinsukia District of Assam | (b)Name of the Company / Organisation | M/s Vedanta Limited(Division Cairn Oil & Gas) | (c)Registered Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002,Gurgaon,Haryana-122002 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Kumar Bera | (b)Designation (Owner/ Partner/ CEO) | Sr. Manager - Environment | (c)Address | | (d)Pin code | 122002 | (e)E-mail | dilipkumar.bera@cairnindia.com | (f)Telephone No. | 124-4594176 | (g)Fax No. | 4145612 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Minor Project/Activity | 1(a) Mining of minerals
| (c)Category | B2 | (d)Proposal Number | SIA/AS/IND2/191148/2021 | (e)Master Proposal Number(Single Window) | SW/191145/2021 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | G46/11, 83M15 | (b)Pincode | 786181 | (c)Bounded Latitudes (North) | | From | | Degree | 27.416664 | Minutes | | Second | | From | | Degree | 27.449999 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 95.833329 | Minutes | | Second | | From | | Degree | 95.833331 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G46/11, 83M15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 116 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Assam | Tinsukia | Margherita | Tokapathar No. 2 | |
|
6. | Details of Terms of Reference (ToR): | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | It is a Category B2 Project | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | 8 Well Pad | 60 days | For exploration & appraisal of hydrocarbons. | (2.) | EPU 2 number | 90 days | Production of crude oil and associated NG | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Drilling of Exploratory and Appraisal Wells | 8 | Others | number | Others | Drilling | (2.) | Associated Natural gas | 0.8 | Others | MMSCFD | Others | Captive consumption in GEG | (3.) | Crude oil | 4000 | Others | BOPD | Others | Road Tankers | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 240 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.10 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0 | (e) Funds Allocated for Environment Management Capital(%) | 0.04 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2098.16 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2098.16 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Water Based Mud | 1800 | Others | m3/day/well | Manufacturer | Others | Trunks | 0 | Others | Manufacturer | Copy of Linkage | (2.) | HSD | 15 | Kilo Litre per Day | | Local | Road | | 0 | Others | Local | Copy of Linkage | (3.) | Natural gas | 283.16 | Others | m3/hr | Local | Road | | 0 | Others | Local | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 10 Mar 2019 To 07 Jun 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 81.70 | 33.70 | 77 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 46.30 | 15.30 | 43.07 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 9 | 6 | 8.06 | 80 | (4.) | Others | CO | Mili Gram per Meter Cube | 0.78 | 0.17 | 0.71 | 4 | (5.) | NOx | | Micro Gram per Meter Cube | 37.40 | 13.90 | 31.16 | 80 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.36 | 6.56 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Total Hardness | | | mg/l | | 140 | 40 | 200 | 1000 | (4.) | Fluoride | | | mg/l | | 0.32 | 0.22 | 250 | 1000 | (5.) | Chlorides | | | mg/l | | 20 | 8 | 250 | 1000 | (6.) | Heavy Metals | | As | mg/l | | 0.005 | 0.005 | 0.01 | 0.05 | (7.) | TDS | | | mg/l | | 176 | 58 | 500 | 1000 | |
14.3. No. of Surface Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.35 | 6.82 | B | (2.) | COD | | mg/l | | 32 | 4 | B | (3.) | DO | | mg/l | | 6.3 | 5.7 | B | (4.) | BOD | | mg/l | | 3.8 | 2 | B | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 56 | 53.9 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45 | 43.7 | 45 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 2551 | 1487 | (2.) | pH | | | 5.58 | 4.96 | (3.) | N(Nitrogen) | Kilogram per hectare | | 15680 | 6426 | (4.) | K(Potassium) | Kilogram per hectare | | 5560 | 2501 | (5.) | Electric Conductivity | Others | µmhos /cm | 92.9 | 29 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Approved supplier during E&A | 87 | 0 | Copy of Permission Letter | modeOthers | Road Tankers | Others | Local | NA | 21 Oct 2019 | 87 | (2.) | Others | Approved supplier during EP | 15 | 0 | Copy of Permission Letter | modeOthers | Tanker supply | Others | Local | NA | 21 Oct 2019 | 15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Trade effluent during EP | 10 | 10 | ETP | Others | Discharged as per CPCB / SPCB Standards | 10 | 0 | (2.) | Domestic Wastewater during EP | 2 | 2 | Septic tank and soak pit | Others | Disposal through soak pit | 2 | 0 | (3.) | Effluent from drill head wash during E&A | 40 | 50 | Mobile effluent treatment plant | Others | re-used or disposal | 10 | 30 | (4.) | Domestic water during E&A | 12 | 12 | STP | Others | Re-used for dust suppression, green belt | 12 | 0 | (5.) | Produced Water during EP | 225 | 250 | ETP | Others | discharged as per CPCB / SPCB standards | 0 | 225 | |
|
16.1. | (a)Total Waste Water Generation | 289 | (b)Total Discharged Water | 255 | (c)Total Reused Water | 34 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drilling Mud with Oil | Others | Hazardous Waste Cat – 2.3 | 500 | Tons | 0 | Road | | Others | As per Hazardous Waste Rule 2016 | (2.) | Oily Sludge during EP | Others | Hazardous Waste Cat – 1.3, Sch 1 | 20 | Tons | 0 | Road | | Others | Waste Rule 2016 | (3.) | Used or Spent Oil | Others | Hazardous Waste Cat – 5.1, Sch 1 | 2 | Tons | 0 | Road | | Others | Disposal with registered recyclers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 37.40 | 2 | 28 | 65.4 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 46.30 | 2 | 0 | 46.30 | 60 | (3.) | PM10 | | Microgram per Meter Cube | 81.70 | 2 | 0.9 | 82.60 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 9 | 2 | 0.08 | 9.08 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Drilling site | HSD | 10 | 0.2 | PM10,NOx | | 2.04 | (2.) | Diesel Fired Heater or IWBH | HSD | 6 | 0.15 | PM10,SO2,NOx ,Others | CO, HC | 2.04 | (3.) | Flare Well or extended well testing | NG | 30 | 0.21 | PM10,SO2,NOx | | 2.04 | (4.) | GEG 1 MW | NG | 10 | 0.21 | SO2,NOx ,Others | HC, CO | 2.04 | (5.) | Liquid Mud Pump | HSD | 6 | 0.21 | PM10,NOx | | 2.04 | (6.) | DG Emergency during EP | HSD | 6 | 0.15 | PM10,SO2,NOx | | 2.04 | (7.) | Dual fuel fired Heater Treater for EP | HSD | 6 | 0.15 | PM10,SO2,NOx ,Others | CO. HC | 2.04 | (8.) | Flaring for EP | NG | 30 | 0.21 | PM10,SO2,NOx | | 2.04 | (9.) | Camp Site | HSD | 6 | 0.21 | PM10,NOx | | 2.04 | (10.) | Radio Room | HSD | 6 | 0.305 | PM10,NOx | | 2.04 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2450 | (b)Source | DG sets exploration and appraisal | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 x 350 KVA DG Sets (camp site) (1 S), 1 x 1000 KV | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 9 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 6945 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 25 | (e)Settlements | 538 | (f)Industrial | 9 | (g)Forest | 8606 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : River (1398), Tea Estate (414), Natural Vegetation | 10,700 | Total | 16133 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Others | Onshore Oil and Gas E&A and EP | 9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | Not present | (2.) | WLS | NA | 0 | Not present | (3.) | Wildlife Corridors | NA | 0 | Not present | (4.) | ESAs | NA | 0 | Not present | (5.) | ESZs | NA | 0 | Not present | (6.) | Corridors | NA | 0 | Not present | (7.) | NPA | NA | 0 | Not present | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | RF Upper Dihing,BuriDihing,Tinkopani | 0 | Within Block | (2.) | Archaeological Sites | | NA | 0 | Not present | (3.) | Defence Installations | | NA | 0 | Not present | (4.) | Others | Reserve Forest | RF Namphai,Tirap,Kotha | 0 | Within Block | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Select | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Land acquisition not started yet | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Schedule I Species has been recorded i.e. Asiatic Elephant, Hoolock Gibbon | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | Yes | (iii)Period of Implementation | During drilling | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Buri Dihing river flows diagonally within the block, from north east to south west | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 80 | (e)No. of working days | 60 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 2.97 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 4455 | (d)Funds Allocated for Plantation | 1000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue will be generated for both State and country during production phase | (2.) | Social | The community will be benefited through induced socio-economic development, employment generation and CSR activity | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0108 | (ii)Name of the EIA Consultant | AECOM India Private Limited | (iii)Address | 9th Floor, Infinity Tower C DLF Cyber City, DLF Phase II Gurgaon, HR 122002, India | (iv)Mobile No. | 9819068877 | (v)Landline No. | 0124487140 | (vi)Email Id | Chetan.Zaveri@aecom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 13 Jan 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 16/02/2021 | •Land use, land cover map with report and, also showing block boundaries of the leased area and well sites proposed in 1:50000 map scale.
•Relief map in the form of shaded relief or classified.
•Satellite images from which land use land cover map prepared with data of acquisition, and block boundary and proposed well site marked.
Please submit following documents for further reconsideration. | | (2.) | 17/03/2021 | EDS submitted | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Kumar Bera | Designation | Sr. Manager - Environment | Name of Company (Applicant Name should not be given here) | M/s Vedanta Limited(Division Cairn Oil & Gas) | Address | 4th Floor, Vipul Plaza, Suncity
Sector 54, Gurgaon, Haryana - 122002 |
|