(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of Re-RollingMill from 22,500 TPA to 81,000 TPA for Production of MS Billets & TMT Bar by Installation of 3 Induction Furnace (1 X 15 Tonne + 2 X 6 Tonne) at Village Kadavita, P.O.-Kalyaneswari, Mouza-Mahespur, JL- 24, P.S.-Salanpur, District- Paschim Bardhaman,West Bengal. by M/s City Alloys Pvt Ltd
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/WB/IND/97521/2019
Project Cost 2460 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 81000 TPA ha.
4.
New/Expansion/ModernizationNew
5. Existing Capacity/Area etc. 22500 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage Kadavita, P.O.-Kalyaneswari, Mouza-Mahespur, JL- 24, P.S.-Salanpur, District- Paschim Bardhaman,West Bengal.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Village Kadavita, P.O.-Kalyaneswari, Mouza-Mahespur, JL- 24, P.S.-Salanpur, District- Paschim Bardhaman,West Bengal.
Town / VillageVillage Kadavita, P.O.-Kalyaneswari, Mouza-Mahespur, JL- 24, P.S.-Salanpur, District- Paschim Bardhaman,West Bengal.
State of the projectWest Bengal
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)West BengalBarddhamanSalanpur
10.
Nearest railway station along with distance in kms Salanpur Railway station, 4.6 km
Nearest airport along with distance in kms Kazi Nazrul Islam Airport, 45.6 km
11. Nearest Town/City/District Headquarters along with distance in kms Durgapur , 16 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Dendua Gram Panchayat
13. Name of the Applicant Shubhradeep
14. Registered Address 127 NS Road 4th Floor Room No 402
15.
Address for correspondance:
Name of the Company CITY ALLOYS PVT LTD
Name of the Applicant Shubhradeep
Designation (Owner/ Partner/ CEO) AuthorisedSignatory
Pin code 700002
E-mail cityalloys2019@gmail.com
Telephone No. 120-4044630
Fax No. 120-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Change in land use certificate has been obtained from the concern authority and no additional lands are required for the expansion project.
1.2 Clearance of existing land, vegetation and buildings? No Not required because the expansion will be carried out in existing land.
1.3 Creation of new land uses? No The existing land will be used.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Soil testing has already been carried out for existing project
1.5 Construction works? No The construction of new plant facilities will not change the land use as the expansion will be carried out within existing land.
1.6 Demolition works? No Expansion will be on the vacant area of the existing plant.
1.7 Temporary sites used for construction works or housing of construction workers? No No housing for construction workers envisaged inside the plant boundary. Local people will be engaged.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Expansion plant buildings above ground will be made to accommodate facilities.
1.9 Underground works including mining or tunnelling? No Not required
1.10 Reclamation works? No Not required
1.11 Dredging? No Not required
1.12 Offshore structures? No Not required
1.13 Production and manufacturing processes? Yes Production of MS Billets & TMT Bars by Induction Furnace. Details are given in PFR
1.14 Facilities for storage of goods or materials? Yes Storage area for goods and material has been constructed for the existing project. The same space will be used for the expansion also.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Sanitary waste water will be treated in septic tank followed by soak pit as per PHE norms. Treated waste water will be fully used for dust suppression and horticulture & green belt maintenance.
1.16 Facilities for long term housing of operational workers? No Housing colony is not proposed.
1.17 New road, rail or sea traffic during construction or operation? No No new road & rail network construction required. Existing road & railway facility shall be utilized.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not envisaged
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not envisaged
1.20 New or diverted transmission lines or pipelines? No Not envisaged
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not envisaged
1.22 Stream crossings? No Not envisaged
1.23 Abstraction or transfers of water from ground or surface waters? Yes Billets & TMT Bars making using Induction Furnace is a dry process. Water is required only for cooling of Billets and TMTBars/ Structural Steel/MS Rounds/Strips. Water requirement would be chiefly met through Damodar River. The total water consumption is estimated at 36 KLD out of which 30 KLD will be required for cooling and balance 6 KLD will be required for drinking & other domestic purpose.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not envisaged.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The existing facility will be utilized for the project; however equipment for expansion project will be transported to project site
1.26 Long-term dismantling or decommissioning or restoration works? No Not envisaged.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not envisaged.
1.28 Influx of people to an area in either temporarily or permanently? No Trained Manpower is available in nearby villages.
1.29 Introduction of alien species? No Only natural species will be planted under green belt.
1.30 Loss of native species or genetic diversity? No There will be no loss of native species or genetic diversity.
1.31 Any other actions? No Not envisaged
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No No new land will be utilized
2.2 Water (expected source & competing users) unit: KLD Yes The water required for the proposed project would be mainly met by Damodar River which is approx. 10.25 Km away from site. The total water requirement is estimated to be 36 KLD out of which 30 KLD is required for cooling process and 6 KLD is required for drinking & other domestic purpose.
2.3 Minerals (MT) Yes Pig Iron Sponge Iron MS Scraps Ferro Silico Manganese
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Construction material for buildings will be required which will be purchased from local
2.5 Forests and timber (source – MT) No Not envisaged.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement (Total): 2500 KVA Source: Damodar Valley Corporation
2.7 Any other natural resources (use appropriate standard units) No Not envisaged.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Not applicable
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not envisaged
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The local people will be benefited by the implementation of this project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not envisaged.
3.5 Any other causes No Not envisaged.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Commercial wastes will be disposed as per local regulation
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used Oil will be sold to authorized re-processors.
4.4 Other industrial process wastes Yes Only IF slag will be generated which being equivalent to river sand will be used for filling the low lying areas.
4.5 Surplus product No Scrap and scale to be consumed in IF.
4.6 Sewage sludge or other sludge from effluent treatment No Nil
4.7 Construction or demolition wastes Yes The construction waste will be will be recycled/ sold .
4.8 Redundant machinery or equipment No Not envisaged
4.9 Contaminated soils or other materials No Not envisaged
4.10 Agricultural wastes No Not envisaged
4.11 Other solid wastes No Not envisaged
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No Not envisaged
5.2 Emissions from production processes Yes Furnace emission will be collected using suction hood and treated in bag filter. Outlet PM emission will be kept below 50 mg/Nm3.
5.3 Emissions from materials handling including storage or transport Yes Dust will be generated from MHP which will be collected by using Bag filter. Transportation of material will be through cover trucks
5.4 Emissions from construction activities including plant and equipment Yes Negligible amount of flumes during metal fabrication work.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Not applicable
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise will be generated from operation of equipment but it will be limited to 75 dB at 10m distance from the equipment using acoustic control
6.2 From industrial or similar processes Yes Sound will be generated from the running machineries. Confined to local area
6.3 From construction or demolition Yes Negligible
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes Small localized temporary noise up to 75 dBA-80 dBA.
6.6 From lighting or cooling systems No Not envisaged
6.7 From any other sources No Not envisaged
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No Not envisaged
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Toilet waste will be treated in septic tanks and disposed in soak pits.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Pollutant emission control will be adequate enough to have GLC under NAAQS norm. Hence the deposition effects will be minimum.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Yes Ambient Air Quality will be within NAAQS norm. Hence the dispersion effects will be minimum.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Adequate fire promotion measures to be taken up.
8.2 From any other causes No Not envisaged
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No such past record
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Employment opportunity and business opportunity will enhance the economic standard of people. There will be overall development of the region with respect to transportation, communication, education health etc and other socioeconomic aspects. There will be growth of supply and extractive. industries which will be improve socio economic of the region.
9.2 Lead to after-use of the site, which could have an impact on the environment No No such reports from closed down steel plants.
9.3 Set a precedent for later developments Yes Ancillary units may developed around it & increase the scope of employment for the local people.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No No cumulative effects are expected.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No No such area within 15 km radius of project area
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Damodar River- 10.25 km, SSW Ajay River – 12 KM, NE
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not existing
4 Inland, coastal, marine or underground waters Yes Inland water streams Damodar River – 10.25 km, SSW Barakar River – 1.41 km, West Ajay River – 12 km, NE
5 State, National boundaries No West Bengal – Jharkhand State Boundary Approx. 1.3 Km, WSW
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not to be affected
7 Defence installations No No Defense installations
8 Densely populated or built-up area Yes Dendua - 3.2 km west
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Dendua Hospital - Approx. 2.66 Km, East ECL Hospital - Approx. 3.27 Km, East D.V.C Higher Secondary School - Approx. 0.75 Km, West Kalikananda School - Approx. 1.08 Km, SW B.S.K College - Approx. 5.06 Km, WSW Kulti College - Approx. 7.37 Km, SSE Pahari Baba Temple - Approx. 10.6 Km, West Radha Krishna Temple - Approx. 1.25 Km, East
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Nil
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No Not envisaged.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No Not envisaged.
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
Additional Attachments, if any
Attached File
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NACommittee deferred the proposal for want of additional information. 12 Apr 2019
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.