APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| 1. | |
Name of the Project/s | Proposed Expansion of the Steel Plant by installation of Pellet Plant with Grinding Facility (2x0.85 MTPA), Sponge Iron Plant (1x350 TPD Kiln), Induction Furnaces (3x25T), Capacity revision from approved 600 TPD to 1000 TPD Rolling Mill along with 7 MW capacity Captive Power Plant (WHRB based, utilising waste heat from the proposed sponge plant) and Producer Gas Plant (12x 4000 Nm3/hr). | Brief summary of project | Annexure-Brief summary of project | Proposal Number | IA/WB/IND/85727/2018 | Project Cost | 47500 lacs | |
| 2. | |
S. No. in the schedule | 3(a) Metallurgical industries (ferrous & non ferrous)
| Project Sector | Industrial Projects - 1 | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | The configuration of Proposed Project is as follows: • Pellet Plant with Grinding Facility (2x0.85 MTPA) • Sponge Iron Plant (1x350 TPD) • Induction Furnaces (3x25T) with matching LRF & CCM – 750 TPD • Rolling Mill - Capacity revision from approved 600 TPD to 1000 TPD • Captive Power Plant – 7 MW (WHRB based, utilising waste heat from the proposed sponge plant) • Producer Gas Plant (12x 4000 Nm3/hr) ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/WB/IND/32308/2015 | MoEFCC file number(Previous EC) | J-11011/758/2009-IA.II(I) | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 300 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Village Mahuda, P.O. Rukni, P.S: Para, District: Purulia, West Bengal | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Mahuda JL No.-84 | Town / Village | Village Mahuda | State of the project | West Bengal | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | West Bengal | Purulia | Raghunathpur | | 10. | |
Nearest railway station along with distance in kms | Rukni, 1.0 km | Nearest airport along with distance in kms | • Kazi Nazrul Islam Airport, Andal, 71 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Purulia , 30 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Dubra Gram Panchayat
Address:
P.O. – Rukni, P.S. – Para, Purulia, West Bengal | | 13. | Name of the Applicant | Deepak | | 14. | Registered Address | 41A, A.J.C Bose Road, Diamond Prestige Building, 8th Floor, Room No. 801, Kolkata-700017, West Bengal | | 15. | |
Address for correspondance: | Name of the Company | BRAVO SPONGE IRON PRIVATE LIMITED | Name of the Applicant | Deepak | Designation (Owner/ Partner/ CEO) | Director | Pin code | 700017 | E-mail | cmdsipl1@gmail.com | Telephone No. | 33-66255252 | Fax No. | 33- | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | The proposed project will be installed on the available land of total 78.37 acres (31.73 hectares) within the existing plant premises. The land is already under the possession of the company.
The land is generally flat and does not come under flood zone. There is no human settlement in the project site. Said plot of land will be reformed / developed from its existing land use. | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | There will be site clearing and preparation activities which will involve removal of scanty vegetation on the proposed plant site within the plant premises and the adjoining acquired land. | 1.3 | Creation of new land uses? | Yes | Proposed project will be developed following a planned land-use plan. As far as possible attempts will be made to create minimum disturbance to the existing land-use of the neighborhood. However, a positive change in the land uses due to the proposed project is expected. | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | No pre-construction investigations are required for the proposed project. | 1.5 | Construction works? | Yes | Civil and Structural works will be undertaken for the proposed plant. However, the extent of such activities is likely to be limited within the plant premises. | 1.6 | Demolition works? | No | - | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | Suitable temporary accommodation for workers will be made within the proposed project site.
Adequate space will be provided for contractor workers. Provision for rest shelters, amenities like drinking water facility, toilet facility etc. will be provided to the work force, who will work at site during construction of the project. | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | Shall be confined to the area earmarked for the project only. | 1.9 | Underground works including mining or tunnelling? | No | - | 1.10 | Reclamation works? | No | - | 1.12 | Offshore structures? | No | - | 1.13 | Production and manufacturing processes? | Yes | The configuration of Proposed Project is as follows:
• Pellet Plant with Grinding Facility (2x0.85 MTPA)
• Sponge Iron Plant (1x350 TPD)
• Induction Furnaces (3x25T) with matching LRF & CCM – 750 TPD
• Rolling Mill - Capacity revision from approved 600 TPD to 1000 TPD
• Captive Power Plant – 7 MW (WHRB based, utilising waste heat from the proposed sponge plant)
• Producer Gas Plant (12x 4000 Nm3/hr)
For detail, please refer enclosed Project Feasibility Report. | 1.14 | Facilities for storage of goods or materials? | Yes | All construction materials will be handled through site store within the area earmarked for the project. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Waste Water:
The plant will be designed as a zero discharge plant. The water will be recirculated through cooling and treatment. The entire wastewater will be recycled for various purposes inside the plant.
Domestic wastewater will be treated in Sewage Treatment Plant (STP).
Solid Waste:
Dust to be collected from Pellet plant will be reused in the pellet process.
Solid wastes that will be generated from IF are slag and dust. The hot slag generated from IF will be transferred to slag | 1.16 | Facilities for long term housing of operational workers? | No | Local people will be used and there will be no arrangement for housing for operational workers. | 1.17 | New road, rail or sea traffic during construction or operation? | No | The proposed site is close to the railway and highway connections to the other main town & cities of the country. Rukni Railway Station is about 1 km from the project site. National Highway-2 (NH-2) is passing around 32 km from the project site. All machineries and equipment can be transported by rail/road. Existing road and rail linkages will be utilized for this project. As such, no additional road and rail linkage will be needed / created for the project. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | Kolkata Port is around 210 km away and Haldia Port is 230 km away from the project site. Existing infrastructure in the surrounding area will be used for the project as is being used now. | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | - | 1.20 | New or diverted transmission lines or pipelines? | No | - | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | - | 1.22 | Stream crossings? | No | - | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | The daily water requirement for the proposed expansion project will be 1416 cu.m/day which will be sourced from DVC. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Not envisaged. | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | The project site has very good road & rail connectivity. As such, both these systems will be used in future for transportation of personnel & materials during construction and operation phases of this programme. | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | - | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | - | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | The proposed project shall increase the employment potential and hence may lead to migration to surrounding villages.
Manpower, to the tune of 1000 persons will be required for the plant operations.
Attempts will be made to maximize utilization of local population during the construction activities. | 1.29 | Introduction of alien species? | No | - | 1.30 | Loss of native species or genetic diversity? | No | - | 1.31 | Any other actions? | No | - | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | No | The proposed project will be installed on the available land of total 78.37 acres (31.73 hectares) within the existing plant premises. The land is already under the possession of the Company.
The land is generally flat and does not come under flood zone. There is no human settlement in the project site. Said plot of land will be reformed / developed from its existing land use. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | The daily water requirement for the proposed expansion project will be 1416 cu.m/day which will be sourced from DVC. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The construction materials such as cement, MS, sand, aggregates etc. will be sourced locally. | 2.5 | Forests and timber (source – MT) | No | - | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The estimated power requirement of the proposed expansion project will be 41.2 MW. The power requirement will be met from proposed 7 MW captive power plant and from DVC. | 2.7 | Any other natural resources (use appropriate standard units) | No | - | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | - | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | - | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | The project is expected to have a positive impact on the socio economic condition of the population in the area which is likely to improve the living condition of the local people. | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | - | 3.5 | Any other causes | No | - | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | - | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | Solid waste of domestic / commercial origin that would be generated in the Plant will be disposed off suitably in consultation with the concerned Civic body. | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | No | - | 4.4 | Other industrial process wastes | Yes | Dust to be collected from Pellet plant will be reused in the pellet process.
Solid wastes that will be generated from IF are slag and dust. The hot slag generated from IF will be transferred to slag yard after cooling. IF slag will be used for road construction and land filling purposes.
Dolo-char from the DRI unit will be used in AFBC boiler.
Solid wastes that will be generated from caster are the scales will be transferred to induction furnaces for reuse.
The solid wastes from the | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Sewage sludge will be disposed off-site in consultation with the concerned local authority. | 4.7 | Construction or demolition wastes | Yes | Small quantity of construction waste that would be generated will be used for development of the project site. | 4.8 | Redundant machinery or equipment | No | - | 4.9 | Contaminated soils or other materials | No | - | 4.10 | Agricultural wastes | No | - | 4.11 | Other solid wastes | No | - | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The main air pollutant from the proposed project will be particulate matter, SO2 & NOx.
The emission will be accounted due to use of fossil fuel, diesel operated equipment for various activities, vehicular movement etc. The precautionary / control measures, such as maintenance of vehicles on a regular basis, tall stacks (as per the guidelines of Central Pollution Control Board), water spray system will be used to control dust emission etc. | 5.2 | Emissions from production processes | Yes | Emissions will take place from proposed Pellet Plant, Induction Furnaces and Captive Power plant. Waste gases from these units will be routed through suitable pollution control devices like Bag Filters, Electrostatic Precipitators (ESPs) and will be released into the atmosphere through tall stacks. | 5.3 | Emissions from materials handling including storage or transport | Yes | Bag filter system will be installed in the raw material handling site and dust suppression system will be installed. | 5.4 | Emissions from construction activities including plant and equipment | Yes | Emissions from construction activities would be taken care of by water sprinkling, using equipment in good condition and use of dust masks by workmen. | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust suppression system will be provided. There will be no odour problem from handling of construction materials.
Sewage and solid wastes, if any would be handled in such a manner to have minimum odour or dust problem. | 5.6 | Emissions from incineration of waste | No | - | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | - | 5.8 | Emissions from any other sources | No | - | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | All the machinery which will be used in the proposed project will be of highest standard and comply with the national / international standards that take care of air and noise pollution control / vibration control. Hence, no significant impact due to operation of such machineries is anticipated. | 6.2 | From industrial or similar processes | Yes | Noise and vibration.
Proper mitigation measures like installation of acoustic enclosures will be taken for all noise generating equipment. | 6.3 | From construction or demolition | Yes | Noise below the level of 85 dB(A) will be generated during construction phase. All state of the art equipment, confirming to noise standards would be employed in the proposed project. | 6.4 | From blasting or piling | Yes | Best efforts will be made to control excessive noise arising out of piling activities. Pilling work will be carried out in such a manner so as to have minimum disturbance to the nearby population. | 6.5 | From construction or operational traffic | Yes | Traffic movement will generate sound. However, best practices will be followed to maintain noise level within 75 dB (A). | 6.6 | From lighting or cooling systems | Yes | Best noise abatement measures will be adopted to control noise from the cooling systems. | 6.7 | From any other sources | No | - | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | Yes | There is no use / handling of hazardous material except during annual oil change period, which is done in closed containers. Also, extra care will be taken during lubrication of equipment. | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of trade effluents from the project. All liquid effluents will be treated and reused inside the plant premises.
Domestic wastewater will be treated in STP. | 7.3 | By deposition of pollutants emitted to air into the land or into water | Yes | Dust will be generated to some extent due to different project activities. During the construction phase, proper care will be taken to reduce dust emission, wherever possible. | 7.4 | From any other sources | No | - | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | - | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | Adequate safety measures will be provided to prevent risk of spillage, fire, etc. | 8.2 | From any other causes | No | - | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The area falls under Earthquake Zone III as per Indian Standard Seismic Zoning Map. | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| No | The project will have insignificant impact on the road network around the project site. The project is not expected to have any impact of concern on the power supply system, housing and wastes management system of the area.
Proposed project will result in considerable growth of the surrounding areas:
• Economic upliftment.
• Rapid growth of service sector will result in increase of income in the area.
• Beneficial for different Service Providers and transportation companies.
No ad | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | - | 9.3 | Set a precedent for later developments | Yes | The project under consideration will enhance the possibility of developing supporting industrial activities in surrounding areas. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | - | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | - | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Panchet Dam Reservoir - 14 km w.r.t the project site. | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | - | 4 | Inland, coastal, marine or underground waters | No | - | 5 | State, National boundaries | No | West Bengal-Jharkhand state boundary 10 km north-west direction from the project site. | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | - | 7 | Defence installations | No | - | 8 | Densely populated or built-up area | Yes | Purulia - 30 km w.r.t project site.
Asansol - 44 km w.r.t project site. | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Schools:
Dubra High School - 2.4 km in W direction w.r.t the project site
Sundraband High School - 3.7 km in E direction w.r.t the project site
Moutor MS High School - 5.3 km in NE direction w.r.t the project site
J H High School -8.9 km in NW direction w.r.t the project site
BNJ High School -9.1 km in NE direction w.r.t the project site
Hospitals:
Babugram Hospital -5.7 km in E direction w.r.t the project site
SE Railway Hospital -7.1 km in S direction w.r.t | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | - | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | - | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | - | | (IV) | Proposed Terms of Reference for EIA studies | Essential Detail Sought : NIL | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Deepak | Designation | Director | Name of Company (Applicant Name should not be given here) | BRAVO SPONGE IRON PRIVATE LIMITED | Address | 41A, A.J.C Bose Road, Diamond Prestige Building, 8th Floor, Room No. 801, Kolkata-700017, West Bengal |
| |
|