APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Proposed Expansion of the Steel Plant by installation of Pellet Plant with Grinding Facility (2x0.85 MTPA), Sponge Iron Plant (1x350 TPD Kiln), Induction Furnaces (3x25T), Capacity revision from approved 600 TPD to 1000 TPD Rolling Mill along with 7 MW capacity Captive Power Plant (WHRB based, utilising waste heat from the proposed sponge plant) and Producer Gas Plant (12x 4000 Nm3/hr).
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/WB/IND/85727/2018
Project Cost 47500 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled The configuration of Proposed Project is as follows: • Pellet Plant with Grinding Facility (2x0.85 MTPA) • Sponge Iron Plant (1x350 TPD) • Induction Furnaces (3x25T) with matching LRF & CCM – 750 TPD • Rolling Mill - Capacity revision from approved 600 TPD to 1000 TPD • Captive Power Plant – 7 MW (WHRB based, utilising waste heat from the proposed sponge plant) • Producer Gas Plant (12x 4000 Nm3/hr) ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/WB/IND/32308/2015
MoEFCC file number(Previous EC)J-11011/758/2009-IA.II(I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 300 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage Mahuda, P.O. Rukni, P.S: Para, District: Purulia, West Bengal
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.Mahuda JL No.-84
Town / VillageVillage Mahuda
State of the projectWest Bengal
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)West BengalPuruliaRaghunathpur
10.
Nearest railway station along with distance in kms Rukni, 1.0 km
Nearest airport along with distance in kms • Kazi Nazrul Islam Airport, Andal, 71 km
11. Nearest Town/City/District Headquarters along with distance in kms Purulia , 30 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Dubra Gram Panchayat Address: P.O. – Rukni, P.S. – Para, Purulia, West Bengal
13. Name of the Applicant Deepak
14. Registered Address 41A, A.J.C Bose Road, Diamond Prestige Building, 8th Floor, Room No. 801, Kolkata-700017, West Bengal
15.
Address for correspondance:
Name of the Company BRAVO SPONGE IRON PRIVATE LIMITED
Name of the Applicant Deepak
Designation (Owner/ Partner/ CEO) Director
Pin code 700017
E-mail cmdsipl1@gmail.com
Telephone No. 33-66255252
Fax No. 33-
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The proposed project will be installed on the available land of total 78.37 acres (31.73 hectares) within the existing plant premises. The land is already under the possession of the company. The land is generally flat and does not come under flood zone. There is no human settlement in the project site. Said plot of land will be reformed / developed from its existing land use.
1.2 Clearance of existing land, vegetation and buildings? Yes There will be site clearing and preparation activities which will involve removal of scanty vegetation on the proposed plant site within the plant premises and the adjoining acquired land.
1.3 Creation of new land uses? Yes Proposed project will be developed following a planned land-use plan. As far as possible attempts will be made to create minimum disturbance to the existing land-use of the neighborhood. However, a positive change in the land uses due to the proposed project is expected.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No No pre-construction investigations are required for the proposed project.
1.5 Construction works? Yes Civil and Structural works will be undertaken for the proposed plant. However, the extent of such activities is likely to be limited within the plant premises.
1.6 Demolition works? No -
1.7 Temporary sites used for construction works or housing of construction workers? Yes Suitable temporary accommodation for workers will be made within the proposed project site. Adequate space will be provided for contractor workers. Provision for rest shelters, amenities like drinking water facility, toilet facility etc. will be provided to the work force, who will work at site during construction of the project.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes Shall be confined to the area earmarked for the project only.
1.9 Underground works including mining or tunnelling? No -
1.10 Reclamation works? No -
1.11 Dredging? No -
1.12 Offshore structures? No -
1.13 Production and manufacturing processes? Yes The configuration of Proposed Project is as follows: • Pellet Plant with Grinding Facility (2x0.85 MTPA) • Sponge Iron Plant (1x350 TPD) • Induction Furnaces (3x25T) with matching LRF & CCM – 750 TPD • Rolling Mill - Capacity revision from approved 600 TPD to 1000 TPD • Captive Power Plant – 7 MW (WHRB based, utilising waste heat from the proposed sponge plant) • Producer Gas Plant (12x 4000 Nm3/hr) For detail, please refer enclosed Project Feasibility Report.
1.14 Facilities for storage of goods or materials? Yes All construction materials will be handled through site store within the area earmarked for the project.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Waste Water: The plant will be designed as a zero discharge plant. The water will be recirculated through cooling and treatment. The entire wastewater will be recycled for various purposes inside the plant. Domestic wastewater will be treated in Sewage Treatment Plant (STP). Solid Waste: Dust to be collected from Pellet plant will be reused in the pellet process. Solid wastes that will be generated from IF are slag and dust. The hot slag generated from IF will be transferred to slag
1.16 Facilities for long term housing of operational workers? No Local people will be used and there will be no arrangement for housing for operational workers.
1.17 New road, rail or sea traffic during construction or operation? No The proposed site is close to the railway and highway connections to the other main town & cities of the country. Rukni Railway Station is about 1 km from the project site. National Highway-2 (NH-2) is passing around 32 km from the project site. All machineries and equipment can be transported by rail/road. Existing road and rail linkages will be utilized for this project. As such, no additional road and rail linkage will be needed / created for the project.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Kolkata Port is around 210 km away and Haldia Port is 230 km away from the project site. Existing infrastructure in the surrounding area will be used for the project as is being used now.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No -
1.20 New or diverted transmission lines or pipelines? No -
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No -
1.22 Stream crossings? No -
1.23 Abstraction or transfers of water from ground or surface waters? Yes The daily water requirement for the proposed expansion project will be 1416 cu.m/day which will be sourced from DVC.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Not envisaged.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes The project site has very good road & rail connectivity. As such, both these systems will be used in future for transportation of personnel & materials during construction and operation phases of this programme.
1.26 Long-term dismantling or decommissioning or restoration works? No -
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No -
1.28 Influx of people to an area in either temporarily or permanently? Yes The proposed project shall increase the employment potential and hence may lead to migration to surrounding villages. Manpower, to the tune of 1000 persons will be required for the plant operations. Attempts will be made to maximize utilization of local population during the construction activities.
1.29 Introduction of alien species? No -
1.30 Loss of native species or genetic diversity? No -
1.31 Any other actions? No -
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The proposed project will be installed on the available land of total 78.37 acres (31.73 hectares) within the existing plant premises. The land is already under the possession of the Company. The land is generally flat and does not come under flood zone. There is no human settlement in the project site. Said plot of land will be reformed / developed from its existing land use.
2.2 Water (expected source & competing users) unit: KLD Yes The daily water requirement for the proposed expansion project will be 1416 cu.m/day which will be sourced from DVC.
2.3 Minerals (MT) No -
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The construction materials such as cement, MS, sand, aggregates etc. will be sourced locally.
2.5 Forests and timber (source – MT) No -
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The estimated power requirement of the proposed expansion project will be 41.2 MW. The power requirement will be met from proposed 7 MW captive power plant and from DVC.
2.7 Any other natural resources (use appropriate standard units) No -
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No -
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No -
3.3 Affect the welfare of people e.g. by changing living conditions? No The project is expected to have a positive impact on the socio economic condition of the population in the area which is likely to improve the living condition of the local people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No -
3.5 Any other causes No -
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No -
4.2 Municipal waste (domestic and or commercial wastes) Yes Solid waste of domestic / commercial origin that would be generated in the Plant will be disposed off suitably in consultation with the concerned Civic body.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No -
4.4 Other industrial process wastes Yes Dust to be collected from Pellet plant will be reused in the pellet process. Solid wastes that will be generated from IF are slag and dust. The hot slag generated from IF will be transferred to slag yard after cooling. IF slag will be used for road construction and land filling purposes. Dolo-char from the DRI unit will be used in AFBC boiler. Solid wastes that will be generated from caster are the scales will be transferred to induction furnaces for reuse. The solid wastes from the
4.5 Surplus product No -
4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage sludge will be disposed off-site in consultation with the concerned local authority.
4.7 Construction or demolition wastes Yes Small quantity of construction waste that would be generated will be used for development of the project site.
4.8 Redundant machinery or equipment No -
4.9 Contaminated soils or other materials No -
4.10 Agricultural wastes No -
4.11 Other solid wastes No -
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The main air pollutant from the proposed project will be particulate matter, SO2 & NOx. The emission will be accounted due to use of fossil fuel, diesel operated equipment for various activities, vehicular movement etc. The precautionary / control measures, such as maintenance of vehicles on a regular basis, tall stacks (as per the guidelines of Central Pollution Control Board), water spray system will be used to control dust emission etc.
5.2 Emissions from production processes Yes Emissions will take place from proposed Pellet Plant, Induction Furnaces and Captive Power plant. Waste gases from these units will be routed through suitable pollution control devices like Bag Filters, Electrostatic Precipitators (ESPs) and will be released into the atmosphere through tall stacks.
5.3 Emissions from materials handling including storage or transport Yes Bag filter system will be installed in the raw material handling site and dust suppression system will be installed.
5.4 Emissions from construction activities including plant and equipment Yes Emissions from construction activities would be taken care of by water sprinkling, using equipment in good condition and use of dust masks by workmen.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust suppression system will be provided. There will be no odour problem from handling of construction materials. Sewage and solid wastes, if any would be handled in such a manner to have minimum odour or dust problem.
5.6 Emissions from incineration of waste No -
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No -
5.8 Emissions from any other sources No -
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes All the machinery which will be used in the proposed project will be of highest standard and comply with the national / international standards that take care of air and noise pollution control / vibration control. Hence, no significant impact due to operation of such machineries is anticipated.
6.2 From industrial or similar processes Yes Noise and vibration. Proper mitigation measures like installation of acoustic enclosures will be taken for all noise generating equipment.
6.3 From construction or demolition Yes Noise below the level of 85 dB(A) will be generated during construction phase. All state of the art equipment, confirming to noise standards would be employed in the proposed project.
6.4 From blasting or piling Yes Best efforts will be made to control excessive noise arising out of piling activities. Pilling work will be carried out in such a manner so as to have minimum disturbance to the nearby population.
6.5 From construction or operational traffic Yes Traffic movement will generate sound. However, best practices will be followed to maintain noise level within 75 dB (A).
6.6 From lighting or cooling systems Yes Best noise abatement measures will be adopted to control noise from the cooling systems.
6.7 From any other sources No -
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes There is no use / handling of hazardous material except during annual oil change period, which is done in closed containers. Also, extra care will be taken during lubrication of equipment.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no discharge of trade effluents from the project. All liquid effluents will be treated and reused inside the plant premises. Domestic wastewater will be treated in STP.
7.3 By deposition of pollutants emitted to air into the land or into water Yes Dust will be generated to some extent due to different project activities. During the construction phase, proper care will be taken to reduce dust emission, wherever possible.
7.4 From any other sources No -
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No -
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Adequate safety measures will be provided to prevent risk of spillage, fire, etc.
8.2 From any other causes No -
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The area falls under Earthquake Zone III as per Indian Standard Seismic Zoning Map.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The project will have insignificant impact on the road network around the project site. The project is not expected to have any impact of concern on the power supply system, housing and wastes management system of the area. Proposed project will result in considerable growth of the surrounding areas: • Economic upliftment. • Rapid growth of service sector will result in increase of income in the area. • Beneficial for different Service Providers and transportation companies. No ad
9.2 Lead to after-use of the site, which could have an impact on the environment No -
9.3 Set a precedent for later developments Yes The project under consideration will enhance the possibility of developing supporting industrial activities in surrounding areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No -
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No -
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Panchet Dam Reservoir - 14 km w.r.t the project site.
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No -
4 Inland, coastal, marine or underground waters No -
5 State, National boundaries No West Bengal-Jharkhand state boundary 10 km north-west direction from the project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No -
7 Defence installations No -
8 Densely populated or built-up area Yes Purulia - 30 km w.r.t project site. Asansol - 44 km w.r.t project site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Schools: Dubra High School - 2.4 km in W direction w.r.t the project site Sundraband High School - 3.7 km in E direction w.r.t the project site Moutor MS High School - 5.3 km in NE direction w.r.t the project site J H High School -8.9 km in NW direction w.r.t the project site BNJ High School -9.1 km in NE direction w.r.t the project site Hospitals: Babugram Hospital -5.7 km in E direction w.r.t the project site SE Railway Hospital -7.1 km in S direction w.r.t
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No -
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No -
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No -
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantDeepak
DesignationDirector
Name of Company (Applicant Name should not be given here)BRAVO SPONGE IRON PRIVATE LIMITED
Address41A, A.J.C Bose Road, Diamond Prestige Building, 8th Floor, Room No. 801, Kolkata-700017, West Bengal