APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Expansion of existing plant of M/s Chhabra Ispat Pvt. Ltd. from 62,400 TPA Billet production to 207,900 TPA Rolled production by Modification of Existing 2x8 Tons Induction Furnaces with 2x10 Tons, Installation of 2x15 Ton Induction Furnaces, Installation of 630 TPD Rolling Mill with Producer Gas Plant and Cold Drawing Complex
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/WB/IND/77591/2018
Project Cost 5767 lacs
2.
S. No. in the schedule3(a) Metallurgical industries (ferrous & non ferrous)
Project Sector Industrial Projects - 1
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled Billet Production – 188,650 TPA Rolled Production – 207,900 TPA LRF- Cold Drawing Products – 33,000 TPA (within 207,900 TPA Rolled production) Producer Gas plant – 2,850 Nm3/hr ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/WB/IND/4617/2011
MoEFCC file number(Previous EC)J-11011/376/2010-IA.II(I)
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 4.34 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify Yes
d) Inter-State boundaries and international boundaries
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillage: Nakrajoria, P.S.: Salanpur, District: Burdwan (W), West Bengal.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.925,964, 965, 966,967, 968, 969, 971,972, 973, 974,978, 980, 981, 982, 983.
Town / VillageNakrajoria
State of the projectWest Bengal
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)West BengalBarddhamanSalanpur
10.
Nearest railway station along with distance in kms Kulti, 4 km
Nearest airport along with distance in kms Netaji Subhash Chandra Bose International Air Port, 250 km
11. Nearest Town/City/District Headquarters along with distance in kms Salanpur , 4 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Name of Gram panchayat – Dendua, Salanpur block, village Nakrajoria, P.O. Salanpur, Mr. Dilip Bauri (Executive Assistant)-9775380323
13. Name of the Applicant Saurav
14. Registered Address Nakrajoria village, P.S. Salanpur, Burdwan west district, West Bengal
15.
Address for correspondance:
Name of the Company M/S CHHABRA ISPAT PVT. LIMITED
Name of the Applicant Saurav
Designation (Owner/ Partner/ CEO) Owner
Pin code 700001
E-mail chhabraispat@gmail.com
Telephone No. 33-40681169
Fax No. 33-03340681169
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No No additional land is required for the proposed expansion project. The project will be executed in vacant land of the existing plant which is already in possession of proponent. The existing land is already developed as industrial area.
1.2 Clearance of existing land, vegetation and buildings? No Not required
1.3 Creation of new land uses? No The proposed expansion project will be installed in the existing plant premises therefore there will be no new land use creation.
1.4 Pre-construction investigations e.g. bore houses, soil testing? No Not Required
1.5 Construction works? Yes Additional civil or Structural works are involved for the installation of additional units.
1.6 Demolition works? No No Demolition works is required.
1.7 Temporary sites used for construction works or housing of construction workers? No No Temporary sites or Housing of construction workers are required since the construction workers will be sourced from the nearby villages. Being existing operating plant, provision for rest shelters, drinking water, washroom etc. are already available at site.
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations No No building, structures or earthworks are required.
1.9 Underground works including mining or tunnelling? No Not Applicable
1.10 Reclamation works? No Not Applicable
1.11 Dredging? No Not Applicable
1.12 Offshore structures? No Not Applicable
1.13 Production and manufacturing processes? Yes Production process is: Production of Rolled Products & Cold drawing Products (TMT Bar, Wire Rod, MS Round, Torkari, Black Wire, Nails, Wire Mesh etc.) through liquid steel making in induction furnace, billet casting in CCM, rolling of billets in Rolling Mill and cold drawing of wire rods Cold Drawing Complex.
1.14 Facilities for storage of goods or materials? Yes Storage facilities are available for the existing plant operation. Additional storage facilities for storage of raw materials and shed for finished products will be created under the expansion.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes The treatment facilities for rolling mill waste water, softening plant back wash shall be installed. Treatment & disposal facilities for solid wastes like IF Slag, Bag Filter dust and mill scale shall be created.
1.16 Facilities for long term housing of operational workers? No Operational workers will be hired from nearby villages. No long term housing for operational workers, proposed.
1.17 New road, rail or sea traffic during construction or operation? No Not Required
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No Not Required
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No Not Required
1.20 New or diverted transmission lines or pipelines? No Not Required
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No Not Applicable
1.22 Stream crossings? No No stream crossing
1.23 Abstraction or transfers of water from ground or surface waters? No Total water requirement after the proposed expansion shall be 243 KLD. Water will be sourced from deep bore wells.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No No change envisaged.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Transportation of material for construction and operations are required. No decommissioning envisaged.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning works required.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not applicable.
1.28 Influx of people to an area in either temporarily or permanently? No Additional workforce will be hired from the nearby villages, hence no influx of people, temporary or permanent is expected.
1.29 Introduction of alien species? No None
1.30 Loss of native species or genetic diversity? No No loss of native species or genetic diversity due to the project
1.31 Any other actions? No No
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No No additional land will be required for the proposed project.
2.2 Water (expected source & competing users) unit: KLD Yes Present water requirement is 55 KLD. Total water requirement after the proposed expansion will be 243 KLD. Water will be sourced from ground water.
2.3 Minerals (MT) Yes The details of raw materials required for the project are. Sponge iron – 104,600 TPA, Scrap – 19,847 TPA, Pig Iron – 19,847 TPA, Ferro Alloys - 790 TPA, Coal – 8400 TPA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The construction material used during construction phase of the proposed project will be sourced from the local market.
2.5 Forests and timber (source – MT) No Not Applicable
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Total power requirement after the proposed expansion will be 25.5 MW. Present out of which present power requirement of 7.5 MW is being met from DVC. Additional Power requirement shall be met from Damodar Valley Corporation (DVC) for which permission shall be obtained. Fuel - 100 liters/hr of LDO shall be used for emergency power.
2.7 Any other natural resources (use appropriate standard units) No No other natural resources are used.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No No hazardous substance as per MSIHC Rules will be used
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions? Yes The proposed project shall improve the living conditions and welfare of the people.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Nil
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes Sewage shall be treated in Septic tank followed by Soak Pits
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No No Hazardous waste shall be generated from the project, except Used Oil, approx. 20 KLD. Shall be sold to the registered recycler.
4.4 Other industrial process wastes Yes IF Slag – 12,466 TPA, IF Bag Filter Dust – 435 TPA, Mill Scale – 4810 TPA, Cinder – 2100 TPA, Tar – 350 TPA. (additional due to the project) All the waste generated shall be used / disposed-off suitably.
4.5 Surplus product No None
4.6 Sewage sludge or other sludge from effluent treatment No No sludge generation. If any, shall be used as manure.
4.7 Construction or demolition wastes Yes Minimal quantity of Construction waste will be generated which will be used for landfilling and leveling.
4.8 Redundant machinery or equipment No No Redundant machinery.
4.9 Contaminated soils or other materials No No contamination of soil or other materials.
4.10 Agricultural wastes No Not Applicable.
4.11 Other solid wastes No No other solid waste generation
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources No No combustion of fossil fuel. Coal will be used in Producer Gas Plant for Gasification for production of Producer Gas. LDO will be used in DG set during emergency power requirement
5.2 Emissions from production processes No Primary & Secondary emissions (fugitive) from Induction Furnace, Flue gas from Reheating Furnace
5.3 Emissions from materials handling including storage or transport Yes Dust emission during transportation and storage, Gases emissions, SO2, NOx & HC during transportation
5.4 Emissions from construction activities including plant and equipment Yes From construction equipment aided with fossil fuel (diesel) are Cranes, Compressor, Mortar mixing drums etc.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste No Dust generation as mentioned above. No odour problems.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No Not applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Overall noise level shall be limited to 85 dB(A)
6.2 From industrial or similar processes Yes Noise will be generated from Rolling Mill, Induction Furnace Exhauster etc. Suitable measures shall be taken to control the noise at source.
6.3 From construction or demolition Yes Noise due to operation of Cranes, Trucks, Dumpers, Construction machineries etc. The noise generated from the construction activities will be confined to the plant premises. The workers will be provided with suitable PPE’s.
6.4 From blasting or piling No Not Applicable
6.5 From construction or operational traffic Yes Overall noise levels shall be limited to 85 dB (A).
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No No other sources.
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Hazardous wastes (Used Oil) shall be suitably disposed-off through registered recyclers, as per Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016 and subsequent amendments
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No For sewage discharge shall be treated in septic tanks with soak pits. Effluent from Rolling Mill shall be treated in ETP and recycled. Waste water from other sources shall be used in the plant for different purposes. Zero Liquid Discharge (ZLD) from the plant.
7.3 By deposition of pollutants emitted to air into the land or into water No State of art pollution control facilities will be installed. Stacks of adequate height will be provided for proper dispersion of pollutants.
7.4 From any other sources No No
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No No long term built-up of pollutants.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Not applicable
8.2 From any other causes No No
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No No such event is known to have occurred in the area. Area falls under Seismic Zone III as per Indian Standard Seismic Zoning Map.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No The development of the project does not envisage any impact on supporting facilities like road, power, housing, extractive or supply industries. Supporting facilities are available as it is an operating plant. No additional supporting facilities proposed. The proposed project will have positive effect and enhance the growth of the region The industry will provide employment to the locals and likely to improve the socio-economic status of the area
9.2 Lead to after-use of the site, which could have an impact on the environment No No impact on environment is envisaged due to after use of the site
9.3 Set a precedent for later developments Yes The proposed project will install state of art pollution control measures to reduce pollution and likely to set a precedent for later development using advanced control technologies.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not envisaged
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No None
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No None
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No None
4 Inland, coastal, marine or underground waters No None
5 State, National boundaries No Jharkhand and West Bengal State Boarder is 1.52 km from the project site.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No None
7 Defence installations No None
8 Densely populated or built-up area Yes Salanpur town at 4 km in SSE direction from plant site
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes BSK College is 5 km in West direction Kulti College is 6.7 km in South direction Kulti Jama Masjid is 4.2 km in South. Govt. Hospital at Salanpur is 4 km in East.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No None
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No None Area comes under Seismic Zone-III
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantSaurav
DesignationOwner
Name of Company (Applicant Name should not be given here)M/S CHHABRA ISPAT PVT. LIMITED
AddressNakrajoria village, P.S. Salanpur, Burdwan west district, West Bengal