APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 2. | |
S. No. in the schedule | 2(a) Coal washeries
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 1.7 MTPA ha. | | 4. | New/Expansion/Modernization | New | | | 5. | Existing Capacity/Area etc. | 59 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Santaldih | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | Plot no. 2200, 2227-2242
Khatian no. 478 | Town / Village | Santaldih | State of the project | West Bengal | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | West Bengal | Purulia | Raghunathpur | | 10. | |
Nearest railway station along with distance in kms | Santaldih, 3 km | Nearest airport along with distance in kms | Ranchi, 150 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Raghunathpur , 25 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Po Santaldih District - Purulia
West Bengal 723145 | | 13. | Name of the Applicant | Pradip | | 14. | Registered Address | Koyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005 | | 15. | |
Address for correspondance: | Name of the Company | BHARAT COKING COAL LIMITED | Name of the Applicant | Pradip | Designation (Owner/ Partner/ CEO) | PO | Pin code | 826005 | E-mail | bhojudihpo@gmail.com | Telephone No. | 326-2236798 | Fax No. | 326-2230161 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | Existing washery | 1.2 | Clearance of existing land, vegetation and buildings? | No | Total land is in possession of BCCL. | 1.3 | Creation of new land uses? | No | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | | 1.5 | Construction works? | No | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | No | | 1.9 | Underground works including mining or tunnelling? | No | | 1.10 | Reclamation works? | Yes | Reclamation including dismantling of
unused infrastructure at the end of
washery life. | 1.12 | Offshore structures? | No | | 1.13 | Production and manufacturing processes? | Yes | Wet processing of coal beneficiation with
closed water circuit system. | 1.14 | Facilities for storage of goods or materials? | Yes | Stock Pile –Capacity-5000T each , 04 Nos for Raw Coal storage, Washed Coal Bunker- Capacity-62.5 T each, 80 Nos., Middling Bunker-01 No.,Railway siding-01 no..Plant Has a store to store spares of Machinieries/Equipments. | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | Washery has a closed water circuit. Effluent from washery goes into slurry pond for settling, from where water is reused. Washery is based on Zero discharge concept.
Metal scrap &Belt Scrap – Sold to authorized dealer through auction.
Rejects- Sale is done through e-Auction | 1.16 | Facilities for long term housing of operational workers? | Yes | Washery has a Township of 540 Quarters for accommodation of employees. | 1.17 | New road, rail or sea traffic during construction or operation? | No | Washery has a private siding of rail for receiving of raw coal and dispatch of products. also roads are constructed for dispatch of rejects. | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | | 1.20 | New or diverted transmission lines or pipelines? | No | Washery has a 3MVA power supply from Bhojudih substation of WBSEDCL transmitted through OHTL. | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | | 1.22 | Stream crossings? | No | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | The washery has allotment of approx. 0.67 MGD make up water from Damodar Valley Corporation.
The requirement includes loss of moistures with products, dust suppression and evaporation losses etc. | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of material for construction, operation will be done through tippers/trucks by road. Personnel will use their individual transport facility | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | The closure activities form an integral part of mine and washery plan. The residential quarters for providing basic amenities to workers will be maintained till the employees are required to stay. Service buildings will be demolished, if redundant, after mine and washery closure and all useable items will be shifted to area store. When a residential building is vacated, the same will be demolished to prevent any unauthorized occupation. | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | Yes | Solid waste generated during demolition
of service and residential buildings after
cessation of industrial activity will have an
impact on the environment. Care will be
taken to dump the solid waste in mine
voids. | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | Influx of people has taken place due to
direct and indirect employment opportunities. This will continue till the end of life of Washery. | 1.29 | Introduction of alien species? | No | | 1.30 | Loss of native species or genetic diversity? | No | | 1.31 | Any other actions? | No | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | Washery has Buildings, stock yard ,siding on 59 Hectare land. | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Damodar river,Washery has an allotment of 0.67 MGD from DVC. | 2.3 | Minerals (MT) | Yes | 1.7 MTPA Raw Coal. | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | No | Not applicable | 2.5 | Forests and timber (source – MT) | No | Not applicable | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The washery has a power connection of 3.0 MVA for operation & maintenance which is made available from the substation of WBSEDCL (33/11kV through Overhead transmission line (OHTL).
This network is exclusively for use of
BCCL and there are no competing users. | 2.7 | Any other natural resources (use appropriate standard units) | No | Not applicable | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | Yes | 1.Batteries used in HEMM
2. Engine oil and Gear Oil
3. Cotton waste | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Not Applicable | 3.3 | Affect the welfare of people e.g. by changing living conditions? | No | Not Applicable | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Not Applicable | 3.5 | Any other causes | No | Not Applicable | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | No | Not Applicable | 4.2 | Municipal waste (domestic and or commercial wastes) | No | Not Applicable | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Used Battteries, Burnt Oil, Cotton Waste. | 4.4 | Other industrial process wastes | No | Not Applicable | 4.5 | Surplus product | Yes | Reject is sold through auction after gradation. | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Washery runs in closed circuit. Effluent from washery goes into Slurry settling Pond .After settling of fine coal ,fresh water is reused in washing process. | 4.7 | Construction or demolition wastes | No | Not Applicable | 4.8 | Redundant machinery or equipment | Yes | Old equipment and machinery will become redundant after the end of useful
life and will be surveyed off and sold as scrap. | 4.9 | Contaminated soils or other materials | No | Not Applicable | 4.10 | Agricultural wastes | No | Not Applicable | 4.11 | Other solid wastes | Yes | Scrap metal, Conveyor Belts etc. are sold to authorized dealer through auction | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Emission like SOx and NOx from HEMM | 5.2 | Emissions from production processes | Yes | Unloading, Crushing of coal lead small dust generation including PM10 and PM2.5 .It is suppressed by water Sprinkling system. | 5.3 | Emissions from materials handling including storage or transport | Yes | Transportation of Middling from middling Bunker leads to fugitive Emission .which is minimized by wetting by mobile sprinkler. | 5.4 | Emissions from construction activities including plant and equipment | No | Not Applicable | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust generated during transportation of raw coal is taken care by sprinkling water. | 5.6 | Emissions from incineration of waste | No | Not Applicable | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Not Applicable | 5.8 | Emissions from any other sources | No | Not Applicable | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Noise is generated during coal loading, unloading, crushing, handling and transportation. However, the ambient noise level at different locations inside washery premises is within permissible limit for industrial area. | 6.2 | From industrial or similar processes | Yes | Noise is generated during coal processing due to operation of Crusher,jigs, HM Bath,bucket elevators, , pumps, screens, belt conveyors etc. Proper maintenance with suitable packing, liners etckeeps the equipment minimum noise generating. As such, the ambient noise level at different locations inside washery premises is not likely to exceed the permissible limit for industrial area. | 6.3 | From construction or demolition | No | Not Applicable | 6.4 | From blasting or piling | No | Not Applicable | 6.5 | From construction or operational traffic | Yes | There is minimum effect of traffic on noise pollution. | 6.6 | From lighting or cooling systems | No | Not Applicable | 6.7 | From any other sources | No | Not Applicable | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | Not applicable | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | Not applicable as the washery is designed
on the principle of zero discharge | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | Control measures like spraying at all dust generating points is adopted. In view of this, fugitive dust emission into air is insignificant. | 7.4 | From any other sources | No | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | Not Applicable | 8.2 | From any other causes | No | Not Applicable | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | The area under study falls in Seismic Zone-III,according to the Indian Standard Seismic
Zoning Map. Suitable seismic coefficients in
horizontal and vertical directions respectively, will be adopted while designing the structure. There are no chances of flood and landslide | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Socio-economic growth associated with washery lead to semi urbanization. This supported development of ancillaries and other related activities. Roads, water supply & other community development. Ancillary & supply industries developed, which in turn generated employment indirectly & need to growth in the income generation. | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Proper care will be taken to restore the land
use pattern in its original form. | 9.3 | Set a precedent for later developments | Yes | Activities at 9.1 above will lead to over all socio economic growth of the area. Socioeconomic benefits of the Project will accrue to local population also. | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | As indicated at 9.1 can lead to cumulative
impact on environment. | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | Not Applicable | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Damodar River - 2.5 km North
Kadamdaha Jora - 1 km South
Gobai River - 2 km north west
Ijri River- 3 km north west
Ghi River- 11km north east
Barakanali Forest - 8 km south east
Bhuski Forest - 8.5 km west
Loylabad Forest - 13 km south west
Babugram Forest - 14 km south east | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | Not Applicable | 4 | Inland, coastal, marine or underground waters | Yes | Damodar River - 2.5 km (approx.) North | 5 | State, National boundaries | No | West Bengal-Jharkhand : 2 km north | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | Not Applicable | 7 | Defence installations | No | Not Applicable | 8 | Densely populated or built-up area | Yes | Santaldih- 2.0 km North-west
Rangamati -7.0 km North
Raghunathpur - 25.0 km South-East | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Hospital, School, place of worship, community facility are all in general in the above
towns. | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | Seismic :
The area under study falls in Seismic Zone-III, accordingly to the Indian Standards Seismic Zone Map. Suitable seismic coefficients in horizontal and vertical directions respectively has been adopted while designing the structures.
Flood :
There are no possibilities of the proposed project site getting flooded as per records available. | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please justify admissibility of the proposal for regularization of the said EC vis-a-vis provisions of the EIA Notification, 2006 and/or directives of the Ministry in this regard. | 21 Nov 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Pradip | Designation | PO | Name of Company (Applicant Name should not be given here) | BHARAT COKING COAL LIMITED | Address | Koyla Bhawan, Koyla Nagar, Dhanbad, Jharkhand, 826005 |
|
|