APPENDIX I
(See Paragraph-6)
FORM 1
Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any'  at the last part of the Form1. Please note that all such Annexures must be part of single pdf document.
(I) Basic Information
S.No.Item Details
Is your project Comes under Notified Industrial Area NA
Whether proposal involved violation of EIA notificationN/A
Weather Consent to Establishment ObtainedN/A
Upload copy of CTE N/A
1.
Name of the Project/s Kalidaspur Project
Brief summary of projectAnnexure-Brief summary of project
Proposal Number IA/WB/CMIN/80965/2018
Project Cost 16392 lacs
2.
S. No. in the schedule1(a) Mining of minerals
Project Sector Coal Mining
3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled 655.00 Ha ha.
4.
New/Expansion/ModernizationExpansion
Proposal NumberIA/WB/CMIN/80964/1985
MoEFCC file number(Previous EC)J-11015/(20)/85-IA
Uploaded EC letterAnnexure-Uploaded EC letter
5. Existing Capacity/Area etc. 600 ha.
6. Category of project i.e. 'A' or 'B' A
7.
Does it attract the general condition? If yes, please specify No
8.
Does it attract the specific condition? If yes, please specify No
9.
Location of the projectVillages: Sahebdanga, Bhara, Kalidaspur, Kalikapur & Banskunri; Tehsil: Mejhia & Saltora; District: Bankura; State: West Bengal.
Shape of the project landBlock (Polygon)
Uploaded GPS fileAnnexure-GPS file      
Uploaded copy of survey of India ToposheetAnnexure-Survey of india toposheet
Plot/Survey/Khasra No.3, 1, 6, 12, 14, 4, 18, 5, 7, 3, 2, 15, 45, 13
Town / VillageBhara, Rhului, Kshiraitore, Jotsriram, Banskuri, Jorsa, Benakanali, Ardhagram, Kalikapur, Kalidaspur, Jugibag, Sahebdanga, Ghusra
State of the projectWest Bengal
Details of State of the project
S.no State Name District Name Tehsil Name
(1.)West BengalBankuraSaltora
(2.)West BengalBankuraMejhia
10.
Nearest railway station along with distance in kms Raniganj, 10 km
Nearest airport along with distance in kms Andal, 26 km
11. Nearest Town/City/District Headquarters along with distance in kms Raniganj Township , 10 km
12. Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) Village Panchayats of Ardhagram & Salma
13. Name of the Applicant Mritunjay
14. Registered Address Borachak House, Eastern Coalfields Ltd., Asansol -313359
15.
Address for correspondance:
Name of the Company Eastern Coalfields Ltd.
Name of the Applicant Mritunjay
Designation (Owner/ Partner/ CEO) General Manager (Env)
Pin code 713359
E-mail envecl@yahoo.com
Telephone No. 341-2254510
Fax No. 341-03412254510
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
16.
Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet No
17. Whether part of Interlinked projects? No
18. Whether separate application of Interlinked project has been submitted? N/A
19.
If Yes, MoEF file numberN/A
Date of submissionN/A
20. If No, Reason N/A
21.
Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given
(i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980?No
(ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972?No
(iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011?No
22.
Whether there is any Government Order/Policy relevant/relating to the site?No
23.
Whether any Forest Land Involved?No
Area of Forest land Involved (hectares)N/A
24.
Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up?No
(a) Name of the CourtN/A
(b) Name of the Sub courtN/A
(c) Case No.N/A
(d) Orders/directions of the court, if any and relevance with the proposed projectN/A
(II) Activity
1 Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes As per attached document
1.2 Clearance of existing land, vegetation and buildings? Yes As per attached document
1.3 Creation of new land uses? Yes As per attached document
1.4 Pre-construction investigations e.g. bore houses, soil testing? No As per attached document
1.5 Construction works? Yes As per attached document
1.6 Demolition works? Yes As per attached document
1.7 Temporary sites used for construction works or housing of construction workers? Yes As per attached document
1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations Yes As per attached document
1.9 Underground works including mining or tunnelling? Yes As per attached document
1.10 Reclamation works? Yes As per attached document
1.11 Dredging? No As per attached document
1.12 Offshore structures? No As per attached document
1.13 Production and manufacturing processes? Yes As per attached document
1.14 Facilities for storage of goods or materials? Yes As per attached document
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes As per attached document
1.16 Facilities for long term housing of operational workers? Yes As per attached document
1.17 New road, rail or sea traffic during construction or operation? Yes As per attached document
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No As per attached document
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? Yes As per attached document
1.20 New or diverted transmission lines or pipelines? No As per attached document
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Yes As per attached document
1.22 Stream crossings? No As per attached document
1.23 Abstraction or transfers of water from ground or surface waters? Yes As per attached document
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes As per attached document
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes As per attached document
1.26 Long-term dismantling or decommissioning or restoration works? Yes As per attached document
1.27 Ongoing activity during decommissioning which could have an impact on the environment? Yes As per attached document
1.28 Influx of people to an area in either temporarily or permanently? Yes As per attached document
1.29 Introduction of alien species? No As per attached document
1.30 Loss of native species or genetic diversity? No As per attached document
1.31 Any other actions? No As per attached document
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes As per attached document
2.2 Water (expected source & competing users) unit: KLD Yes As per attached document
2.3 Minerals (MT) Yes As per attached document
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes As per attached document
2.5 Forests and timber (source – MT) Yes As per attached document
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes As per attached document
2.7 Any other natural resources (use appropriate standard units) Yes As per attached document
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No As per attached document
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No As per attached document
3.3 Affect the welfare of people e.g. by changing living conditions? Yes As per attached document
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No As per attached document
3.5 Any other causes No As per attached document
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes Yes As per attached document
4.2 Municipal waste (domestic and or commercial wastes) Yes As per attached document
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes As per attached document
4.4 Other industrial process wastes Yes As per attached document
4.5 Surplus product Yes As per attached document
4.6 Sewage sludge or other sludge from effluent treatment Yes As per attached document
4.7 Construction or demolition wastes Yes As per attached document
4.8 Redundant machinery or equipment Yes As per attached document
4.9 Contaminated soils or other materials Yes As per attached document
4.10 Agricultural wastes No As per attached document
4.11 Other solid wastes No As per attached document
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes As per attached document
5.2 Emissions from production processes Yes As per attached document
5.3 Emissions from materials handling including storage or transport Yes As per attached document
5.4 Emissions from construction activities including plant and equipment Yes As per attached document
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes As per attached document
5.6 Emissions from incineration of waste Yes As per attached document
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) Yes As per attached document
5.8 Emissions from any other sources Yes As per attached document
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes As per attached document
6.2 From industrial or similar processes Yes As per attached document
6.3 From construction or demolition Yes As per attached document
6.4 From blasting or piling Yes As per attached document
6.5 From construction or operational traffic Yes As per attached document
6.6 From lighting or cooling systems No As per attached document
6.7 From any other sources No As per attached document
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No As per attached document
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No As per attached document
7.3 By deposition of pollutants emitted to air into the land or into water No As per attached document
7.4 From any other sources No As per attached document
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No As per attached document
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes As per attached document
8.2 From any other causes Yes As per attached document
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes As per attached document
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes As per attached document
9.2 Lead to after-use of the site, which could have an impact on the environment No As per attached document
9.3 Set a precedent for later developments No As per attached document
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes As per attached document
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No As per attached document
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes As per attached document
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No As per attached document
4 Inland, coastal, marine or underground waters No As per attached document
5 State, National boundaries No As per attached document
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No As per attached document
7 Defence installations No As per attached document
8 Densely populated or built-up area Yes As per attached document
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes As per attached document
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes As per attached document
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No As per attached document
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No As per attached document
(IV) Proposed Terms of Reference for EIA studies
1 Uploaded Proposed TOR File Annexure-TOR file
2 Uploaded scanned copy of covering letter Annexure-scanned copy of covering letter
3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR
4 Uploaded additional attachments(only single pdf file) Annexure-Additional attachments
5Uploaded Approval of mining PlanAnnexure-Uploaded Approval of mining plan
Additional Attachments, if any
Attached File
EDS reply for Clarification
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe correction have been made as per the instruction received 05 Jan 2019
2.NAPlease reply to our observations dated 6/10/2018 & 21/11/2018 for consideration of the proposal. 05 Jan 2019
3.NAThe correction have been made as per the instruction received 21 Nov 2018
4.NAPlease see our earlier observations vide query dated 6/10/2018. Even the proposal for the proposed expansion needs to be justified. 21 Nov 2018
      Additional Detail Sought : NIL
(V) Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
V.(i)
Name of ApplicantMritunjay
DesignationGeneral Manager (Env)
Name of Company (Applicant Name should not be given here)Eastern Coalfields Ltd.
AddressBorachak House, Eastern Coalfields Ltd., Asansol -313359