APPENDIX I | (See Paragraph-6) | FORM 1 | | Note : If space provided against any parameter is inadequate, Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. | (I) Basic Information | | | Is your project Comes under Notified Industrial Area | NA |
| | Whether proposal involved violation of EIA notification | N/A | | Weather Consent to Establishment Obtained | N/A | | Upload copy of CTE | N/A |
| | 2. | |
S. No. in the schedule | 1(a) Mining of minerals
| Project Sector | Coal Mining | |
| 3. | Proposed capacity/area/length/tonnage to be handled/command area/lease area/number or wells to be drilled | 655.00 Ha ha. | | 4. | New/Expansion/Modernization | Expansion | Proposal Number | IA/WB/CMIN/80964/1985 | MoEFCC file number(Previous EC) | J-11015/(20)/85-IA | Uploaded EC letter | Annexure-Uploaded EC letter | | | 5. | Existing Capacity/Area etc. | 600 ha. | | 6. | Category of project i.e. 'A' or 'B' | A | | 7. | Does it attract the general condition? If yes, please specify | No | | | 8. | Does it attract the specific condition? If yes, please specify | No | | | 9. | |
Location of the project | Villages: Sahebdanga, Bhara, Kalidaspur, Kalikapur & Banskunri; Tehsil: Mejhia & Saltora; District: Bankura; State: West Bengal. | Shape of the project land | Block (Polygon) | Uploaded GPS file | Annexure-GPS file | Uploaded copy of survey of India Toposheet | Annexure-Survey of india toposheet | Plot/Survey/Khasra No. | 3, 1, 6, 12, 14, 4, 18, 5, 7, 3, 2, 15, 45, 13 | Town / Village | Bhara, Rhului, Kshiraitore, Jotsriram, Banskuri, Jorsa, Benakanali, Ardhagram, Kalikapur, Kalidaspur, Jugibag, Sahebdanga, Ghusra | State of the project | West Bengal | |
| Details of State of the project |
---|
S.no | State Name | District Name | Tehsil Name |
---|
(1.) | West Bengal | Bankura | Saltora | (2.) | West Bengal | Bankura | Mejhia | | 10. | |
Nearest railway station along with distance in kms | Raniganj, 10 km | Nearest airport along with distance in kms | Andal, 26 km | |
| 11. | Nearest Town/City/District Headquarters along with distance in kms | Raniganj Township , 10 km | | 12. | Village Panchayats, Zila Parishad, Muncipal Corporation, Local body (Complete postal address with telephone nos. to be given) | Village Panchayats of Ardhagram & Salma | | 13. | Name of the Applicant | Mritunjay | | 14. | Registered Address | Borachak House, Eastern Coalfields Ltd., Asansol -313359 | | 15. | |
Address for correspondance: | Name of the Company | Eastern Coalfields Ltd. | Name of the Applicant | Mritunjay | Designation (Owner/ Partner/ CEO) | General Manager (Env) | Pin code | 713359 | E-mail | envecl@yahoo.com | Telephone No. | 341-2254510 | Fax No. | 341-03412254510 | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
| 16. | Details of Alternative Sites examined, if any. Location of these sites should be shown on a toposheet | No | |
| 17. | Whether part of Interlinked projects? | No | | 18. | Whether separate application of Interlinked project has been submitted? | N/A | | 19. | If Yes, MoEF file number | N/A | Date of submission | N/A | | | | 21. | Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given | (i) Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | (ii) Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | (iii) Whether the proposal involves approval/clearance under the C.R.Z notification, 2011? | No | | | 22. | Whether there is any Government Order/Policy relevant/relating to the site? | No | |
| 23. | Whether any Forest Land Involved? | No | Area of Forest land Involved (hectares) | N/A | |
| 24. | Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? | No | (a) Name of the Court | N/A | (b) Name of the Sub court | N/A | (c) Case No. | N/A | (d) Orders/directions of the court, if any and relevance with the proposed project | N/A | |
| 1 | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | Yes | As per attached document | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | As per attached document | 1.3 | Creation of new land uses? | Yes | As per attached document | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | No | As per attached document | 1.5 | Construction works? | Yes | As per attached document | 1.6 | Demolition works? | Yes | As per attached document | 1.7 | Temporary sites used for construction works or housing of construction workers? | Yes | As per attached document | 1.8 | Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations and fill or excavations | Yes | As per attached document | 1.9 | Underground works including mining or tunnelling? | Yes | As per attached document | 1.10 | Reclamation works? | Yes | As per attached document | 1.11 | Dredging? | No | As per attached document | 1.12 | Offshore structures? | No | As per attached document | 1.13 | Production and manufacturing processes? | Yes | As per attached document | 1.14 | Facilities for storage of goods or materials? | Yes | As per attached document | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | As per attached document | 1.16 | Facilities for long term housing of operational workers? | Yes | As per attached document | 1.17 | New road, rail or sea traffic during construction or operation? | Yes | As per attached document | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | As per attached document | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | Yes | As per attached document | 1.20 | New or diverted transmission lines or pipelines? | No | As per attached document | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | Yes | As per attached document | 1.22 | Stream crossings? | No | As per attached document | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | As per attached document | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | Yes | As per attached document | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | As per attached document | 1.26 | Long-term dismantling or decommissioning or restoration works? | Yes | As per attached document | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | Yes | As per attached document | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | As per attached document | 1.29 | Introduction of alien species? | No | As per attached document | 1.30 | Loss of native species or genetic diversity? | No | As per attached document | 1.31 | Any other actions? | No | As per attached document | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 2.1 | Land especially undeveloped or agricultural land (ha) | Yes | As per attached document | 2.2 | Water (expected source & competing users) unit: KLD | Yes | As per attached document | 2.3 | Minerals (MT) | Yes | As per attached document | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | As per attached document | 2.5 | Forests and timber (source – MT) | Yes | As per attached document | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | As per attached document | 2.7 | Any other natural resources (use appropriate standard units) | Yes | As per attached document | | 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | As per attached document | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | As per attached document | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | As per attached document | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | As per attached document | 3.5 | Any other causes | No | As per attached document | | 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 4.1 | Spoil, overburden or mine wastes | Yes | As per attached document | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | As per attached document | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | As per attached document | 4.4 | Other industrial process wastes | Yes | As per attached document | 4.5 | Surplus product | Yes | As per attached document | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | As per attached document | 4.7 | Construction or demolition wastes | Yes | As per attached document | 4.8 | Redundant machinery or equipment | Yes | As per attached document | 4.9 | Contaminated soils or other materials | Yes | As per attached document | 4.10 | Agricultural wastes | No | As per attached document | 4.11 | Other solid wastes | No | As per attached document | | 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | As per attached document | 5.2 | Emissions from production processes | Yes | As per attached document | 5.3 | Emissions from materials handling including storage or transport | Yes | As per attached document | 5.4 | Emissions from construction activities including plant and equipment | Yes | As per attached document | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | As per attached document | 5.6 | Emissions from incineration of waste | Yes | As per attached document | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | Yes | As per attached document | 5.8 | Emissions from any other sources | Yes | As per attached document | | 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | As per attached document | 6.2 | From industrial or similar processes | Yes | As per attached document | 6.3 | From construction or demolition | Yes | As per attached document | 6.4 | From blasting or piling | Yes | As per attached document | 6.5 | From construction or operational traffic | Yes | As per attached document | 6.6 | From lighting or cooling systems | No | As per attached document | 6.7 | From any other sources | No | As per attached document | | 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 7.1 | From handling, storage, use or spillage of hazardous materials | No | As per attached document | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | As per attached document | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | As per attached document | 7.4 | From any other sources | No | As per attached document | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | As per attached document | | 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | Yes | As per attached document | 8.2 | From any other causes | Yes | As per attached document | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | Yes | As per attached document | | 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | As per attached document | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | As per attached document | 9.3 | Set a precedent for later developments | No | As per attached document | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | Yes | As per attached document | | (III) | Environmental Sensitivity | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | No | As per attached document | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | As per attached document | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | No | As per attached document | 4 | Inland, coastal, marine or underground waters | No | As per attached document | 5 | State, National boundaries | No | As per attached document | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | No | As per attached document | 7 | Defence installations | No | As per attached document | 8 | Densely populated or built-up area | Yes | As per attached document | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | As per attached document | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | Yes | As per attached document | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | As per attached document | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | As per attached document | | (IV) | Proposed Terms of Reference for EIA studies | | Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The correction have been made as per the instruction received | 05 Jan 2019 | 2. | NA | Please reply to our observations dated 6/10/2018 & 21/11/2018 for consideration of the proposal. | 05 Jan 2019 | 3. | NA | The correction have been made as per the instruction received | 21 Nov 2018 | 4. | NA | Please see our earlier observations vide query dated 6/10/2018. Even the proposal for the proposed expansion needs to be justified. | 21 Nov 2018 | | Additional Detail Sought : NIL | (V) | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. | V.(i) | Name of Applicant | Mritunjay | Designation | General Manager (Env) | Name of Company (Applicant Name should not be given here) | Eastern Coalfields Ltd. | Address | Borachak House, Eastern Coalfields Ltd., Asansol -313359 |
|
|